Patent US4453595A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4453595A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of measuring fracture pressure in underground formations

Assignee: SYSTEMS SCIENCE AND SOFTWARE 3398 CARMEL MOUNTAIN ROAD SAN DIEGO CA A CORP OF
•
Filing: 1982-09-07
•
Granted: 1984-06-12
•
Expires: 2002-09-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method is disclosed for accurately measuring breakdown or fracture pressure by placing a variable volume device in immediate communication with a test interval formed in a borehole extending through an underground formation. Expansion of the variable volume device increases pressure in the test interval to the fracture pressure of the formation. The fracture pressure may be accurately measured by monitoring pressure in the test interval, expansion of the variable volume device then preferably being terminated in order to minimize the extent of fracture within the formation.

Inventors

  • 👤 Peter L. Lagus
  • 👤 Edward W. Peterson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 17:43
CPC Classifications
E; E21; E21B; E21B49/00; E21B49/08; E21B49/087; E21B43/00; E21B43/25; E21B43/26; E21B49/006

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 106 words
In a method for accurately measuring breakdown or fracture pressure of an underground formation, the steps comprising defining an isolated test interval along a borehole extending through the formation with at least one primary packer, arranging a variable volume device in the borehole in immediate communication with the test interval, filling the test interval with a substantially incompressible fluid, expanding the variable volume device and thereby increasing pressure in the test interval to the breakdown or fracture pressure of the formation, and simultaneously monitoring selected pressure and/or flow conditions within the test interval in order to accurately detect the breakdown or fracture pressure of the formation.
Claim 2
Dependent Claim 106 words
In a method for accurately measuring breakdown or fracture pressure of an underground formation, the steps comprising defining an isolated test interval along a borehole extending through the formation with at least one primary packer, arranging a variable volume device in the borehole in immediate communication with the test interval, filling the test interval with a substantially incompressible fluid, expanding the variable volume device and thereby increasing pressure in the test interval to the breakdown or fracture pressure of the formation, and simultaneously monitoring selected pressure and/or flow conditions within the test interval in order to accurately detect the breakdown or fracture pressure of the formation.
Claim 3
Dependent Claim 45 words
The method of claim 1 further comprising the step of terminating expansion of the variable volume device substantially simultaneously as pressure in the test interval reaches the breakdown or fracture pressure of the formation in order to minimize the extent of fracture in the formation.
Claim 4
Dependent Claim 32 words
The method of claim 1 or 2 wherein monitoring means are employed for detecting the breakdown or fracture pressure of the formation, the variable volume device being coupled with the monitoring means.
Claim 5
Dependent Claim 30 words
The method of claim 3 wherein the variable volume device is responsive to the monitoring means for terminating expansion of the variable volume device substantially upon the initiation of fracture.
Claim 6
Dependent Claim 20 words
The method of claim 1, wherein the monitoring means and the variable volume device are arranged in the test interval.
Claim 7
Dependent Claim 16 words
The method of claim 1 wherein the variable volume device comprises a cylinder and piston assembly.
Claim 8
Dependent Claim 29 words
The method of claim 1 wherein an initial pressure is developed within the test interval below the fracture pressure of the formation before expansion of the variable volume device.
Claim 9
Dependent Claim 24 words
The method of claim 7 wherein the initial pressure is developed by an additional variable volume device arranged in communication with the test interval.
Claim 10
Dependent Claim 22 words
The method of claim 1 wherein the test interval is formed between the one primary packer and an end of the borehole.
Claim 11
Dependent Claim 40 words
The method of claim 9 wherein a guard packer is arranged in spaced apart relation along the borehole relative to the primary packer for forming a guard region, pressure and/or flow conditions also being simultaneously monitored within the guard region.
Claim 12
Dependent Claim 59 words
The method of claim 1 wherein the test interval is formed by the one primary packer and an additional primary packer in the borehole, guard packers being arranged in spaced apart relation to the respective primary packers for forming guard regions at opposite ends of the test interval, pressure and/or flow conditions being simultaneously monitored within both guard regions.

References Cited (Backward Citations)

US2851109A Cited
US3427652A Cited
US4398416A Cited
US4372380A Cited
US4392376A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-06-12 1987-12-12 1988-06-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-06-12 1991-12-12 1992-06-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-06-12 1995-12-12 1996-06-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag