Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
174 words
A method of constructing an impermeable wall in the ground, comprising the steps of: excavating a trench having a defined width in the ground, replacing excavated material from the trench with bentonite water slurry, placing interlocking, prefabricated concrete panels in the trench, the panels having a thickness less than the width of the trench, one side of the panels resting against one side of the trench, placing guides in the trench between the other side of the panels and the other side of the trench to hold the panels upright and against the one side of the trench, pouring concrete by tremie pipe in the bottom of the trench for a predetermined height replacing some of the bentonite water slurry, grouting joints between adjacent panels to ensure a waterproof seal, after the concrete and grouting has hardened back-filling remainder of the trench with selected material replacing most of the remaining bentonite water slurry and mixing with a small amount of the slurry, and packing the selected material well down to form an impermeable wall.
Claim 2
Independent Claim
174 words
A method of constructing an impermeable wall in the ground, comprising the steps of: excavating a trench having a defined width in the ground, replacing excavated material from the trench with bentonite water slurry, placing interlocking, prefabricated concrete panels in the trench, the panels having a thickness less than the width of the trench, one side of the panels resting against one side of the trench, placing guides in the trench between the other side of the panels and the other side of the trench to hold the panels upright and against the one side of the trench, pouring concrete by tremie pipe in the bottom of the trench for a predetermined height replacing some of the bentonite water slurry, grouting joints between adjacent panels to ensure a waterproof seal, after the concrete and grouting has hardened back-filling remainder of the trench with selected material replacing most of the remaining bentonite water slurry and mixing with a small amount of the slurry, and packing the selected material well down to form an impermeable wall.
Claim 3
Dependent Claim
20 words
The method according to claim 1 wherein the thickness of the panels is approximately half the width of the trench.
Claim 4
Dependent Claim
42 words
The method according to claim 1 wherein the thickness of the panels is in the range of about one foot to one foot six inches and the width of the trench is in the range of about two feet to three feet.
Claim 5
Dependent Claim
22 words
The method according to claim 1 wherein the predetermined height of concrete in the bottom of the trench is about three feet.
Claim 6
Dependent Claim
34 words
The method according to claim 1 wherein the joints between the interlocking panels have a space between adjacent panels and the grouting step includes pumping heavy grouting into the space through a plastic pipe.
Claim 7
Dependent Claim
26 words
The method according to claim 1 wherein the selected back-fill is selected from the group consisting of sand, gravel and a mixture of sand and gravel.
Claim 8
Dependent Claim
66 words
The method according to claim 1 wherein a joint section is utilized at one end of the trench when the trench is excavated in more than one length, the join section extending across the width of the trench and having an interlocking connection to join to an end panel in the trench, the join section being removed before a next length of the trench is excavated.