Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
172 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement by pumping out the bentonite-water slurry from at least one portion of trench into a mixer where the cement is added and the slurry fed back into the one portion, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produde an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 2
Dependent Claim
172 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement by pumping out the bentonite-water slurry from at least one portion of trench into a mixer where the cement is added and the slurry fed back into the one portion, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produde an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 3
Dependent Claim
152 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement, mixing the cement with the remaining bentonite-water slurry in the one portion of trench by means of feeding compressed air into the one portion to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 4
Dependent Claim
152 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement, mixing the cement with the remaining bentonite-water slurry in the one portion of trench by means of feeding compressed air into the one portion to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 5
Dependent Claim
161 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench while bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement so as to add approximately 200 to 400 lbs. of cement for each cubic yard of the bentonite-water slurry, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 6
Dependent Claim
161 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench while bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement so as to add approximately 200 to 400 lbs. of cement for each cubic yard of the bentonite-water slurry, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 7
Dependent Claim
166 words
In a method of construcing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement and additives to extend the time to harden the cement-bentonite-water slurry in excess of the time to excavate the complete length of the trench, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 8
Dependent Claim
166 words
In a method of construcing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of: excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement and additives to extend the time to harden the cement-bentonite-water slurry in excess of the time to excavate the complete length of the trench, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 9
Dependent Claim
158 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of; excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench including excavating an adjacent end of the gelled cement-bentonite-water mix in the one portion of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.
Claim 10
Dependent Claim
158 words
In a method of constructing an impermeable wall in the ground having no joints therein, the improvement comprising the steps of; excavating at least one portion of trench in the ground at a width and depth required for the wall, replacing excavated material from the trench with bentonite-water slurry, after completing excavation of the one portion of trench, replacing a predetermined amount of the bentonite-water slurry with cement, mixing the cement with the remaining bentonite-water slurry in the one portion of trench to produce an evenly mixed cement-bentonite-water slurry, after the cement-bentonite-water slurry has gelled but not hardened, repeating the above steps on further portions of trench adjacent to previously excavated portions of trench including excavating an adjacent end of the gelled cement-bentonite-water mix in the one portion of trench until the completed trench is the required length and full of evenly mixed cement-bentonite-water slurry, and allowing the cement-bentonite-water slurry to harden and form a single impermeable wall.