Patent US4450363A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4450363A Expired / Lapsed US ⏱️ 0.0 years remaining

Coordinated control technique and arrangement for steam power generating system

Assignee: Elsag International BV
•
Filing: 1982-05-07
•
Granted: 1984-05-22
•
Expires: 2002-05-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A coordinated control technique and arrangement for a steam power generating system is disclosed in which combined megawatt error and turbine pressure error signal are used to control the turbine control valve and the fuel flow to the boiler.

Inventors

  • 👤 Thomas D. Russell
  • 👤 Robert R. Walker

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 16:30
CPC Classifications
F; F01; F01D; F01D17/00; F01D17/02; F01D17/04; F01K; F01K13/00; F01K13/02

Claims Analysis

Total Claims: 5
Claim 1
Independent Claim 245 words
A method of operating an electric power generation system, the system being of the type having an electric generator, a steam turbine connected to the electric generator, a steam generator for supplying steam to the turbine, a flow line interconnected between the steam generator and the turbine for the passage of steam, throttle valve means in the flow line for regulating turbine throttle pressure, and fuel flow regulating means for regulating heat input to the steam generator, comprising the steps of measuring throttle pressure, producing a feed-forward proportional signal based on load demand for the turbine, developing a throttle pressure error signal representative of the difference between said measured throttle pressure signal and a throttle pressure setpoint, measuring electrical load output of the electric generator, producing a feedforward proportional signal based on load demand for the boiler, developing a megawatt error signal representative of the difference between said measuring electrical output signal and a unit load demand, and further comprising, during transient operation, combining said throttle pressure error signal and said megawatt error signal to produce (1) a first combined signal corresponding to the difference of said megawatt error signal and said throttle pressure error signal, and biasing the throttle valve controls by means responsive to said first combined signal, and (2) a second combined signal corresponding to the sum of said megawatt error signal and said throttle pressure error signal, and biasing the fuel flow control by means responsive to said second combined signal.
Claim 2
Independent Claim 245 words
A method of operating an electric power generation system, the system being of the type having an electric generator, a steam turbine connected to the electric generator, a steam generator for supplying steam to the turbine, a flow line interconnected between the steam generator and the turbine for the passage of steam, throttle valve means in the flow line for regulating turbine throttle pressure, and fuel flow regulating means for regulating heat input to the steam generator, comprising the steps of measuring throttle pressure, producing a feed-forward proportional signal based on load demand for the turbine, developing a throttle pressure error signal representative of the difference between said measured throttle pressure signal and a throttle pressure setpoint, measuring electrical load output of the electric generator, producing a feedforward proportional signal based on load demand for the boiler, developing a megawatt error signal representative of the difference between said measuring electrical output signal and a unit load demand, and further comprising, during transient operation, combining said throttle pressure error signal and said megawatt error signal to produce (1) a first combined signal corresponding to the difference of said megawatt error signal and said throttle pressure error signal, and biasing the throttle valve controls by means responsive to said first combined signal, and (2) a second combined signal corresponding to the sum of said megawatt error signal and said throttle pressure error signal, and biasing the fuel flow control by means responsive to said second combined signal.
Claim 3
Dependent Claim 49 words
A method of operating an electric power generation system, as set forth in claim 1, further comprising, during steady state operation, biasing the throttle valve controls by means responsive to said throttle pressure error signal and operating the fuel flow controls by means responsive to the megawatt error signal.
Claim 4
Dependent Claim 212 words
In a power generation system of the type having an electric generator, a steam turbine connected to the electric generator, a steam generator for supplying steam to the turbine, a flow line interconnected between the steam generator and the turbine for the passage of steam, throttle valve means in the flow line for regulating turbine throttle pressure, and fuel flow regulating means for regulating heat input to the steam generator, the combination comprising means for measruing throttle pressure, producing a feedforward proportional signal based on load demand for the turbine, means for developing a throttle set point, means for measuring electrical load output of the electric generator, means for producing a feedforward proportional signal based on load demand for the boiler means for developing a megawatt error signal representative of the difference between said measured electrical output signal and the required electrical output, means for combining said throttle pressure signal and said megawatt error signal including first means for providing a signal corresponding to the difference of said megawatt error signal and said throttle pressure error signal for controlling said throttle valve means and second means for providing a signal corresponding to the sum of said megawatt error signal and said throttle pressure error signal, for controlling said fuel flow regulating means.
Claim 5
Dependent Claim 212 words
In a power generation system of the type having an electric generator, a steam turbine connected to the electric generator, a steam generator for supplying steam to the turbine, a flow line interconnected between the steam generator and the turbine for the passage of steam, throttle valve means in the flow line for regulating turbine throttle pressure, and fuel flow regulating means for regulating heat input to the steam generator, the combination comprising means for measruing throttle pressure, producing a feedforward proportional signal based on load demand for the turbine, means for developing a throttle set point, means for measuring electrical load output of the electric generator, means for producing a feedforward proportional signal based on load demand for the boiler means for developing a megawatt error signal representative of the difference between said measured electrical output signal and the required electrical output, means for combining said throttle pressure signal and said megawatt error signal including first means for providing a signal corresponding to the difference of said megawatt error signal and said throttle pressure error signal for controlling said throttle valve means and second means for providing a signal corresponding to the sum of said megawatt error signal and said throttle pressure error signal, for controlling said fuel flow regulating means.

References Cited (Backward Citations)

US4117344A Cited
US4287429A Cited
US4287430A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-05-22 1987-11-21 1988-05-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-05-22 1991-11-21 1992-05-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-05-22 1995-11-21 1996-05-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag