← Back to Patent Explorer
US4427067A Expired / Lapsed US ⏱️ 0.0 years remaining

Water and miscible fluid flooding method having good vertical conformance for recovering oil

Assignee: ExxonMobil Upstream Research Co
•
Filing: 1982-08-06
•
Granted: 1984-01-24
•
Expires: 2002-08-06
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for recovering oil from a subterranean formation by alternately injecting water and fluid miscible with the oil into the formation to displace the oil is disclosed. In this method, the wells are spaced sufficiently close together, and the water and miscible fluid are injected at a rate, such that a value between 0.3 and 1.5 is obtained for a dimensionless parameter. This parameter is a ratio of viscous flow forces to gravity forces. It is equal to the total injection rate of the water and miscible fluid divided by the product of the density difference between the miscible fluid and the water, the average vertical permeability of the reservoir, the area of the reservoir to be flooded by an injection well, and the sum of the mobilities of the miscible fluid and the water at steady state around the injection well.

Inventors

  • 👤 Herbert L. Stone

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 09:50
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/20; E21B43/30

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 175 words
A method of recovering oil from a subterranean oil reservoir by injection of water and fluid miscible with said oil comprising: (a) drilling a plurality of wells in communication for injection and production, defining a recovery zone within the reservoir, while spacing said wells sufficiently close and then injecting said water with said miscible fluid in said wells for injection at sufficient rate such that a value between 0.3 and 1.5 is obtained over said recovery zone for the following dimensionless parameter: ##EQU3## where, I t is the total injection rate of both the water and the miscible fluid injected into an injection well, Δρ is the difference in density between the water and the miscible fluid, k v is the average vertical permeability of the reservoir, a is the horizontal area of the reservoir to be flooded by the injection well, and ##EQU4## is the sum of the mobilities of the water and the miscible fluid at steady state around the injection well; (b) producing said oil from said reservoir from said production wells.
Claim 2
Independent Claim 175 words
A method of recovering oil from a subterranean oil reservoir by injection of water and fluid miscible with said oil comprising: (a) drilling a plurality of wells in communication for injection and production, defining a recovery zone within the reservoir, while spacing said wells sufficiently close and then injecting said water with said miscible fluid in said wells for injection at sufficient rate such that a value between 0.3 and 1.5 is obtained over said recovery zone for the following dimensionless parameter: ##EQU3## where, I t is the total injection rate of both the water and the miscible fluid injected into an injection well, Δρ is the difference in density between the water and the miscible fluid, k v is the average vertical permeability of the reservoir, a is the horizontal area of the reservoir to be flooded by the injection well, and ##EQU4## is the sum of the mobilities of the water and the miscible fluid at steady state around the injection well; (b) producing said oil from said reservoir from said production wells.
Claim 3
Dependent Claim 17 words
The method of claim 1 wherein said injection rate is below that which would fracture said reservoir.
Claim 4
Dependent Claim 83 words
The method of claim 1 wherein said recovery zone is at one end of said reservoir and said wells are drilled in lines, the farthest line being used for injection and the second farthest line being used for production, said farthest line being shut in and said second farthest line being drilled for production, defining a second recovery zone, when recovery from first said recovery zone has been completed, said method being repeated until the opposite end of said reservoir has been reached.
Claim 5
Dependent Claim 17 words
The method of claim 1 where near miscible fluid is used in place of said misible fluid.
Claim 6
Dependent Claim 28 words
The method of claim 1 further comprising injecting a fluid immiscible with said oil, but miscible with said miscible fluid, after injecting said miscible fluid into said reservoir.
Claim 7
Dependent Claim 13 words
The method of claim 1 wherein water and miscible fluid are alternately injected.
Claim 8
Dependent Claim 13 words
The method of claim 1 wherein water and miscible fluid are simultaneously injected.
Claim 9
Dependent Claim 12 words
The method of claim 1 where said miscible fluid is a gas.
Claim 10
Independent Claim 214 words
A method of recovering oil from a subterranean oil reservoir by alternate injection of water and fluid miscible with said oil, said reservoir being penetrated by a plurality of wells for injection and production, comprising: (a) defining a pattern of wells for injection of said water and miscible fluid and production of said oil wherein the spacing of the wells in said pattern and the rate of injection of said water and miscible fluid is such that a value between 0.3 and 1.5 is obtained for the following dimensionless parameter for any given injection well in said pattern: ##EQU5## where, I t is the total injection rate of both the water and the miscible fluid injected into said given injection well, Δρ is the difference in density between the water and the miscible fluid, K v is the average vertical permeability of the reservoir, a is the area of the reservoir to be flooded by said given injection well, and ##EQU6## is the sum of the mobilities of the water and the miscible fluid at steady state around said given injection well; (b) alternately injecting said water and said miscible fluid in said injection wells in said pattern of wells and producing from the production wells in said pattern of wells to recover oil.
Claim 11
Independent Claim 214 words
A method of recovering oil from a subterranean oil reservoir by alternate injection of water and fluid miscible with said oil, said reservoir being penetrated by a plurality of wells for injection and production, comprising: (a) defining a pattern of wells for injection of said water and miscible fluid and production of said oil wherein the spacing of the wells in said pattern and the rate of injection of said water and miscible fluid is such that a value between 0.3 and 1.5 is obtained for the following dimensionless parameter for any given injection well in said pattern: ##EQU5## where, I t is the total injection rate of both the water and the miscible fluid injected into said given injection well, Δρ is the difference in density between the water and the miscible fluid, K v is the average vertical permeability of the reservoir, a is the area of the reservoir to be flooded by said given injection well, and ##EQU6## is the sum of the mobilities of the water and the miscible fluid at steady state around said given injection well; (b) alternately injecting said water and said miscible fluid in said injection wells in said pattern of wells and producing from the production wells in said pattern of wells to recover oil.
Claim 12
Dependent Claim 24 words
The method of claim 9 wherein said plurality of wells are in rows and said pattern of wells is for a rolling line drive.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1987-01-23 1987-07-25 1988-01-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1991-01-23 1991-07-25 1992-01-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1995-01-23 1995-07-25 1996-01-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag