← Back to Patent Explorer
US3084743A Expired / Lapsed US ⏱️ 0.0 years remaining

Secondary recovery of petroleum

Assignee: Jersey Production Research Co
•
Filing: 1958-09-16
•
Granted: 1963-04-09
•
Expires: 1978-09-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Robert C West
  • 👤 Gerald D Ortloff
  • 👤 Donald M Beeson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 19:29
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/164

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 151 words
AN IMPROVED OIL RECOVERY PROCESS WHICH COMPRISES INJECTING WATER INTO A SUBSURFACE OIL-BEARING RESERVOIR THROUGH AT LEAST ONE INJECTION WELL UNTIL A MEAN RESERVOIR PRESSURE OF AT LEAST 1000 P.S.I. IS ATTAINED, INJECTING A BANK OF FROM ABOUT 0.03 TO ABOUT 0.5 PORE VOLUME, BASED ON RESERVOIR CONDITIONS, OF NORMALLY GASEOUS FLUID COMPRISING CARBON DIOXIDE INTO SAID RESERVOIR THROUGH SAID INJECTION WELL AT A PRESSURE IN EXCESS OF 1000 P.S.I., INJECTING AN AQUEOUS MEDIUM INTO SAID RESERVOIR THROUGH SAID INJECTION WELL TO DISPLACE SAID BANK OF FLUID TOWARD AT LEAST ONE PRODUCTION WELL, WITHDRAWING PRODUCED FLUIDS FROM SAID PRODUCTION WELL WHILE MAINTAINING A MEAN RESERVOIR PRESSURE OF AT LEAST 1000 P.S.I.; DISCONTINUING THE INJECTION OF SAID AQUEOUS MEDIUM WHEN THE PRODUCING FLUIDS NO LONGER CONTAIN SUBSTANTIAL QUANTITIES OF OIL AND CARBON DIOXIDE, AND THEREAFTER DEPRESSURING SAID RESERVOIR BY PUMPING DOWN SAID PRODUCTION WELL AND RECOVERING ADDITIONAL OIL FROM SAID PRODUCTION WELL.
Claim 2
Dependent Claim 151 words
AN IMPROVED OIL RECOVERY PROCESS WHICH COMPRISES INJECTING WATER INTO A SUBSURFACE OIL-BEARING RESERVOIR THROUGH AT LEAST ONE INJECTION WELL UNTIL A MEAN RESERVOIR PRESSURE OF AT LEAST 1000 P.S.I. IS ATTAINED, INJECTING A BANK OF FROM ABOUT 0.03 TO ABOUT 0.5 PORE VOLUME, BASED ON RESERVOIR CONDITIONS, OF NORMALLY GASEOUS FLUID COMPRISING CARBON DIOXIDE INTO SAID RESERVOIR THROUGH SAID INJECTION WELL AT A PRESSURE IN EXCESS OF 1000 P.S.I., INJECTING AN AQUEOUS MEDIUM INTO SAID RESERVOIR THROUGH SAID INJECTION WELL TO DISPLACE SAID BANK OF FLUID TOWARD AT LEAST ONE PRODUCTION WELL, WITHDRAWING PRODUCED FLUIDS FROM SAID PRODUCTION WELL WHILE MAINTAINING A MEAN RESERVOIR PRESSURE OF AT LEAST 1000 P.S.I.; DISCONTINUING THE INJECTION OF SAID AQUEOUS MEDIUM WHEN THE PRODUCING FLUIDS NO LONGER CONTAIN SUBSTANTIAL QUANTITIES OF OIL AND CARBON DIOXIDE, AND THEREAFTER DEPRESSURING SAID RESERVOIR BY PUMPING DOWN SAID PRODUCTION WELL AND RECOVERING ADDITIONAL OIL FROM SAID PRODUCTION WELL.

References Cited (Backward Citations)

US1511067A Cited
GB669216A Cited
US2623596A Cited
US2669307A Cited
GB696524A Cited
US2875832A Cited
US2875833A Cited
US2878874A Cited
US2975831A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1966-04-08 1966-10-08 1967-04-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1970-04-08 1970-10-08 1971-04-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1974-04-08 1974-10-08 1975-04-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag