Patent US4735531A successfully refreshed from Google Patents.
Patent US4421169A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4421169A Expired / Lapsed US ⏱️ 0.0 years remaining

Protective sheath for high temperature process wells

Assignee: Atlantic Richfield Co
•
Filing: 1981-12-03
•
Granted: 1983-12-20
•
Expires: 2001-12-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Apparatus and method for maintaining the integrity of a cement sheath surrounding a casing in a hot subteranean zone including a layer of compressible refractory insulation surrounding the casing and at least one cement hanger slidably carried by said casing and means for limiting the movement of the hanger on the casing. The insulation layer mechanically isolates the sheath from thermal expansion of the casing and the slidable cement hanger likewise allows limited axial motion of the casing relative to the sheath without inducing tensile loads.

Inventors

  • 👤 James D. Dearth
  • 👤 Herbert B. Wolcott, Jr.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-09 04:02
CPC Classifications
E; E21; E21B; E21B36/00; E21B36/003; E21B33/00; E21B33/10; E21B33/13; E21B33/14; E21B43/00; E21B43/02; E21B43/10; E21B43/103

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 85 words
Apparatus for supporting and maintaining the integrity of a cement sheath formed in-situ between a casing and a borehole wall in a hot subterranean zone; a layer of compressible refractory insulation surrounding said casing; at least one cement hanger slidably carried by said casing, said hanger including a plurality of cement engaging arms extending outwardly from said casing; and clamp means fixedly carried by said casing for limiting the movement of said hanger along said casing; whereby said sheath is isolated from thermally induced stresses.
Claim 2
Dependent Claim 85 words
Apparatus for supporting and maintaining the integrity of a cement sheath formed in-situ between a casing and a borehole wall in a hot subterranean zone; a layer of compressible refractory insulation surrounding said casing; at least one cement hanger slidably carried by said casing, said hanger including a plurality of cement engaging arms extending outwardly from said casing; and clamp means fixedly carried by said casing for limiting the movement of said hanger along said casing; whereby said sheath is isolated from thermally induced stresses.
Claim 3
Dependent Claim 45 words
Apparatus according to claim 1 wherein said cement hanger includes a collar slidably carried on said casing and said cement engaging arms each comprise a steel strap having a first end attached to said collar and a body portion extending angularly away from said collar.
Claim 4
Dependent Claim 19 words
Apparatus according to claim 2 wherein said layer of refractory insulation also surrounds the collar portion of said hanger.
Claim 5
Dependent Claim 27 words
Apparatus according to claim 1 wherein said clamp means comprise first and second collars carried by said casing at points spaced above and below said cement hanger.
Claim 6
Dependent Claim 18 words
Apparatus according to claim 4 wherein said layer of refractory insulation also surrounds said first and second collars.
Claim 7
Independent Claim 125 words
An apparatus for fluidly communicating the surface with a hot subterranean zone comprising: a casing fluidly communicating said hot zone and said surface; a layer of refractory insulation surrounding a lower portion of said casing positioned with said zone; one or more cement hanger means slidably supported by said lower portion of said casing, each hanger means including a plurality of cement engaging arms extending outwardly from said casing; clamp means carried by said lower portion of said casing for limiting the movement of said hanger means along said casing; and a cement sheath surrounding said layer of insulation, said cement sheath formed in-situ between said insulation and a borehole wall and attached to and supported by said cement engaging arms of said cement hangers.
Claim 8
Independent Claim 125 words
An apparatus for fluidly communicating the surface with a hot subterranean zone comprising: a casing fluidly communicating said hot zone and said surface; a layer of refractory insulation surrounding a lower portion of said casing positioned with said zone; one or more cement hanger means slidably supported by said lower portion of said casing, each hanger means including a plurality of cement engaging arms extending outwardly from said casing; clamp means carried by said lower portion of said casing for limiting the movement of said hanger means along said casing; and a cement sheath surrounding said layer of insulation, said cement sheath formed in-situ between said insulation and a borehole wall and attached to and supported by said cement engaging arms of said cement hangers.
Claim 9
Dependent Claim 48 words
Apparatus according to claim 6 wherein: said cement hanger means includes a collar slidably carried on said lower casing portion and said cement engaging arms each comprise a steel strap, having a first end attached to said collar and a body portion extending angularly away from said collar.
Claim 10
Dependent Claim 43 words
Apparatus according to claim 6 wherein: said clamp means comprises, for each cement hanger, first and second clamps fixedly carried by said casing at points spaced above and below said cement hanger means for limiting motion of said hanger means along said casing.
Claim 11
Independent Claim 85 words
A method for supporting and maintaining the integrity of a cement sheath formed in-situ between a casing and a borehole wall in a hot subterranean zone: slidably positioning a cement hanger on said casing, said hanger including a plurality of cement engaging arms extending outwardly from said casing for engaging said sheath; limiting the axial motion of said hanger along said casing; and wrapping all exterior surfaces of said casing and said hanger, except said cement engaging arms, with a layer of compressible refractory insulation.
Claim 12
Independent Claim 85 words
A method for supporting and maintaining the integrity of a cement sheath formed in-situ between a casing and a borehole wall in a hot subterranean zone: slidably positioning a cement hanger on said casing, said hanger including a plurality of cement engaging arms extending outwardly from said casing for engaging said sheath; limiting the axial motion of said hanger along said casing; and wrapping all exterior surfaces of said casing and said hanger, except said cement engaging arms, with a layer of compressible refractory insulation.
Claim 13
Dependent Claim 20 words
A method according to claim 9 further including the step of wrapping said insulation with a layer of waterproof material.

References Cited (Backward Citations)

US2362829A Cited
US3119451A Cited
US3117628A Cited
US3379252A Cited
US3380530A Cited
US3677340A Cited
US3820605A Cited
US3976139A Cited
US4071311A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-12-19 1987-06-20 1987-12-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-12-19 1991-06-20 1991-12-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-12-19 1995-06-20 1995-12-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag