Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
167 words
In the method of making a structure from at least one workpiece wherein said at least one workpiece is constrained about its periphery between a pair of dies creating an actual gap therebetween, said dies applying a clamping force to said at least one workpiece, said dies being constrained between a pair of non-inflatable platens, and said at least one workpiece is formed within said pair of dies by fluid under pressure, the improvement comprising: providing force adjustment means for varying said actual gap between said dies to adjust the force applied by said dies to said at least one workpiece; sensing the actual gap between said dies during forming, and providing a first output signal proportional to the size of said actual gap; providing a second output signal proportional to a preferred gap size between said dies; and controlling said force adjustment means using said first and second signals such that the actual gap size substantially equals said preferred gap size during forming of said workpiece.
Claim 2
Dependent Claim
167 words
In the method of making a structure from at least one workpiece wherein said at least one workpiece is constrained about its periphery between a pair of dies creating an actual gap therebetween, said dies applying a clamping force to said at least one workpiece, said dies being constrained between a pair of non-inflatable platens, and said at least one workpiece is formed within said pair of dies by fluid under pressure, the improvement comprising: providing force adjustment means for varying said actual gap between said dies to adjust the force applied by said dies to said at least one workpiece; sensing the actual gap between said dies during forming, and providing a first output signal proportional to the size of said actual gap; providing a second output signal proportional to a preferred gap size between said dies; and controlling said force adjustment means using said first and second signals such that the actual gap size substantially equals said preferred gap size during forming of said workpiece.
Claim 3
Dependent Claim
20 words
The method of claim 1 wherein said preferred gap size results in an appropriate force during forming of said workpiece.
Claim 4
Dependent Claim
43 words
The method of claim 2, wherein: said force adjustment means comprises an inflatable platen between one of said dies and one of said non-inflatable platens; and said step of controlling said force adjustment means comprises controlling the pressure level within said inflatable platen.
Claim 5
Dependent Claim
78 words
The method of claim 3, wherein said step of controlling said force adjustment means also includes: providing a source of pressurized fluid and a conduit coupling said source to said inflatable platen; transmitting said first and second signals to the input of a controller; transmitting an output signal of said controller to control a valve means in said conduit, said valve means regulating said pressure within said inflatable platen in response to said output signal of said controller.
Claim 6
Dependent Claim
23 words
The method of claim 2 or 3 including the additional step of providing a buffer platen between said inflatable platen and said dies.
Claim 7
Dependent Claim
213 words
In an apparatus for forming a structure comprising a pair of dies adapted to constrain at least one workpiece about its periphery, said at least one workpiece creating an actual gap between said pair of dies, a pair of non-inflatable platens, said dies being positioned between said non-inflatable platens, said dies adapted to apply a clamping force to said at least one workpiece, and means to apply a fluid under pressure to said at least one workpiece to form said at least one workpiece against at least one of said dies, the improvement comprising: force adjustment means positioned between one of said dies and one of said non-inflatable platens adapted to adjust the force applied by said dies to said at least one workpiece by varying said actual gap between said pair of dies; sensing means for sensing changes in the size of said actual gap, said sensing means providing a first output signal proportional to the size of said actual gap during said forming of said structure; a signal generator adapted to provide a second output signal proportional to a preferred gap size; and control means responsive to said first and second output signal for regulating said force adjustment means such that said actual gap size substantially equals said preferred gap size.
Claim 8
Dependent Claim
213 words
In an apparatus for forming a structure comprising a pair of dies adapted to constrain at least one workpiece about its periphery, said at least one workpiece creating an actual gap between said pair of dies, a pair of non-inflatable platens, said dies being positioned between said non-inflatable platens, said dies adapted to apply a clamping force to said at least one workpiece, and means to apply a fluid under pressure to said at least one workpiece to form said at least one workpiece against at least one of said dies, the improvement comprising: force adjustment means positioned between one of said dies and one of said non-inflatable platens adapted to adjust the force applied by said dies to said at least one workpiece by varying said actual gap between said pair of dies; sensing means for sensing changes in the size of said actual gap, said sensing means providing a first output signal proportional to the size of said actual gap during said forming of said structure; a signal generator adapted to provide a second output signal proportional to a preferred gap size; and control means responsive to said first and second output signal for regulating said force adjustment means such that said actual gap size substantially equals said preferred gap size.
Claim 9
Dependent Claim
20 words
The apparatus of claim 6, wherein said preferred gap size results in an appropriate force during forming of said workpiece.
Claim 10
Dependent Claim
72 words
The apparatus of claim 7 wherein said force adjustment means comprises an inflatable platen, and said control means comprises: a source of pressurized fluid; a conduit coupling said fluid to said inflatable platen; a valve means mounted in said conduit for regulating the the pressure level within said platen; and a controller responsive to said first and second output signals, said controller providing a signal to said valve means for control thereof.
Claim 11
Dependent Claim
19 words
The apparatus of claim 7 or 8 also including a buffer platen between said inflatable platen and said dies.
Claim 12
Dependent Claim
36 words
The method of claim 2 wherein said preferred gap size is that which would be produced during forming of said workpiece by the use of said force in substantially the minimum amount necessary for acceptable forming.
Claim 13
Dependent Claim
36 words
The method of claim 4 wherein said preferred gap size is that which would be produced during forming of said workpiece by the use of said force in substantially the minimum amount necessary for acceptable forming.
Claim 14
Dependent Claim
36 words
The apparatus of claim 7 wherein said preferred gap size is that which would be produced during forming of said workpiece by the use of said force in substantially the minimum amount necessary for acceptable forming.
Claim 15
Dependent Claim
36 words
The apparatus of claim 8 wherein said preferred gap size is that which would be produced during forming of said workpiece by the use of said force in substantially the minimum amount necessary for acceptable forming.