Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
268 words
The method of constructing a high-capacity tension-sustaining earch-anchor reference having an axis of tension-sustaining alignment which is at angular offset from the vertical, which comprises excavating earth material to form an elongate generally cylindrical bore of a first diameter on said axis, then locally expanding the excavation to characterize a selected axial extent of the bore by local cutting to larger diametral extent at longitudinally spaced regions of the bore, each of the expanded excavations being characterized by a wall surface of relatively uniform slope with respect to the longitudinal axis of the bore and extending from said first to a second diameter, whereby the characterized bore is defined in a relatively undisturbed body of earth material, selecting a tension rod of length to span more than the characterized axial extent of the bore, said rod having one or more radially projecting formations for enhanced engagement to cementatious material, placing the rod within the bore in radially spaced relation with the bore wall and in coaxial relation with the characterized axial extent of the bore, and then casting a cementatious filling in the bore by smoothly introducing the filling into the bore, the filling being to an extent filling at least the characterized axial extent of the bore with the rod embedded to an extent short of the outer end of the rod, whereby upon curing, the cast filling is installed in a relatively undisturbed body of earth material, with an end of the rod externally exposed, thereby permitting maximum availability of the confined compressive strength of the earth material to enhance the tension-sustaining capacity of the earth-anchor.
Claim 2
Independent Claim
268 words
The method of constructing a high-capacity tension-sustaining earch-anchor reference having an axis of tension-sustaining alignment which is at angular offset from the vertical, which comprises excavating earth material to form an elongate generally cylindrical bore of a first diameter on said axis, then locally expanding the excavation to characterize a selected axial extent of the bore by local cutting to larger diametral extent at longitudinally spaced regions of the bore, each of the expanded excavations being characterized by a wall surface of relatively uniform slope with respect to the longitudinal axis of the bore and extending from said first to a second diameter, whereby the characterized bore is defined in a relatively undisturbed body of earth material, selecting a tension rod of length to span more than the characterized axial extent of the bore, said rod having one or more radially projecting formations for enhanced engagement to cementatious material, placing the rod within the bore in radially spaced relation with the bore wall and in coaxial relation with the characterized axial extent of the bore, and then casting a cementatious filling in the bore by smoothly introducing the filling into the bore, the filling being to an extent filling at least the characterized axial extent of the bore with the rod embedded to an extent short of the outer end of the rod, whereby upon curing, the cast filling is installed in a relatively undisturbed body of earth material, with an end of the rod externally exposed, thereby permitting maximum availability of the confined compressive strength of the earth material to enhance the tension-sustaining capacity of the earth-anchor.
Claim 3
Dependent Claim
25 words
The method of claim 1, in which the expanded-excavation step forms axially adjacent uniformly sloping wall surfaces in a consecutive sequence of such expanded excavations.
Claim 4
Dependent Claim
28 words
The method of claim 1, in which the expanded-excavation step forms axially adjacent uniformly sloping wall surfaces in opposite directions of slope with respect to the bore axis.
Claim 5
Dependent Claim
34 words
The method of claim 1, in which the slope of the sloping excavated wall surface is in the range of 20° to 85° with respect to a radial plane normal to the bore axis.
Claim 6
Dependent Claim
44 words
The method of claim 1, wherein the earth material consists primarily of rock, and in which the slope of the sloping excavated wall surface is in the range of substantially 20° to 50° with respect to a radial plane normal to the bore axis.
Claim 7
Dependent Claim
44 words
The method of claim 1, wherein the earth material consists primarily of soil, and in which the slope of the sloping excavated wall surface is in the range of substantially 40° to 85° with respect to a radial plane normal to the bore axis.
Claim 8
Dependent Claim
21 words
The method of claim 3, in which the adjacent oppositely sloping wall surfaces are of substantially the same magnitude of slope.
Claim 9
Dependent Claim
32 words
The method of claim 1, in which the expanded-excavation step forms axially adjacent uniformly sloping wall surfaces in a consecutive sequence at relatively short axial spacing between such adjacent expanded local excavations.
Claim 10
Dependent Claim
15 words
The method of claim 1, in which said cementatious filling is made at elevated pressure.
Claim 11
Dependent Claim
30 words
The method of claim 1, in which the one or more radially projecting formations include a radially extending plate secured to the rod at the inner end of the bore.