Patent US4408568A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4408568A Expired / Lapsed US ⏱️ 0.0 years remaining

Furnace wall ash monitoring system

Assignee: WATERLOO A Co OF ONTARIO, University of
•
Filing: 1981-11-12
•
Granted: 1983-10-11
•
Expires: 2001-11-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The build up of ash in a pulverized coal-fired boiler is achieved by comparing the heat flux simultaneously detected by a first flux detector which is maintained free of deposits and a second flux detector on which deposits are permitted to form. The net values from the heat flux comparison is proportional to the heat flux which is not reaching the boiler walls as a result of the ash deposits.

Inventors

  • 👤 John R. Wynnyckyj
  • 👤 Edward Rhodes
  • 👤 Allan K. Chambers

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 19:11
CPC Classifications
F; F23; F23M; F23M11/00; F23M11/04; F22; F22B; F22B37/00; F22B37/02; F22B37/56

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 60 words
A method of monitoring the build up of ash on the inside walls of a coal-fired boiler, which comprises: simultaneously determining the actual heat flux present in said boiler and the heat flux reaching the walls of said boiler, and determining the difference in heat flux value as a measure of the build up of ash on said inside walls.
Claim 2
Independent Claim 60 words
A method of monitoring the build up of ash on the inside walls of a coal-fired boiler, which comprises: simultaneously determining the actual heat flux present in said boiler and the heat flux reaching the walls of said boiler, and determining the difference in heat flux value as a measure of the build up of ash on said inside walls.
Claim 3
Dependent Claim 55 words
The method of claim 1 wherein said actual heat flux present in said boiler is determined by a first heat flux detector which is maintained free of ash deposits and said heat flux reaching the walls of said boiler is determined by a second heat flux detector on which ash deposits are permitted to form.
Claim 4
Dependent Claim 23 words
The method of claim 1 or 2 wherein said steps are effected repetitively whereby continuous monitoring of said ash build up is effected.
Claim 5
Dependent Claim 16 words
The method of claim 1 or 2 wherein said heat flux detectors are heat flux meters.
Claim 6
Dependent Claim 31 words
The method of claim 3 wherein said measurement of the difference in heat flux value is effected by comparing electrical signals produced by said heat flux detectors during said flux determination.
Claim 7
Dependent Claim 16 words
The method of claim 1 or 2 wherein said heat flux is determined by a pyrometer.
Claim 8
Dependent Claim 16 words
The method of claim 6 wherein said pyrometer is an infra-red or a total radiation pyrometer.
Claim 9
Independent Claim 139 words
A method of monitoring the build up of ash on the inside wall of a pulverized coal fired boiler, which comprises: positioning in said boiler a first heat flux detector capable of producing an electrical signal proportional to the heat flux detected thereby, positioning in said boiler a second heat flux detector capable of producing an electrical signal proportional to the heat flux detected thereby, continuously maintaining said first heat flux detector substantially free from said ash deposits, permitting said ash deposits to form on said second flux detector, and repeatedly effecting the steps of: simultaneously determining the heat flux detected by each of said first and second flux detectors, and comparing the electrical signals produced by said first and second flux detectors to provide an electrical signal indicative of the thickness of ash build up on said walls.
Claim 10
Independent Claim 139 words
A method of monitoring the build up of ash on the inside wall of a pulverized coal fired boiler, which comprises: positioning in said boiler a first heat flux detector capable of producing an electrical signal proportional to the heat flux detected thereby, positioning in said boiler a second heat flux detector capable of producing an electrical signal proportional to the heat flux detected thereby, continuously maintaining said first heat flux detector substantially free from said ash deposits, permitting said ash deposits to form on said second flux detector, and repeatedly effecting the steps of: simultaneously determining the heat flux detected by each of said first and second flux detectors, and comparing the electrical signals produced by said first and second flux detectors to provide an electrical signal indicative of the thickness of ash build up on said walls.
Claim 11
Dependent Claim 62 words
The method of claim 8 wherein said electrical signals are compared by amplifying one of said signals to provide a positive potential corresponding to the determined flux, amplifying the other of said signals to provide a negative potential corresponding to the determined flux, and summing the positive and negative potentials to provide a residual potential corresponding to the ash build up thickness.
Claim 12
Dependent Claim 44 words
The method of claim 8 or 9 wherein said electrical signal indicative of the thickness of ash build up on the walls is used to actuate at least one boiler control operation in response to a value of said signal exceeding a predetermined value.
Claim 13
Independent Claim 61 words
A method for the control of a pulverized coal-fired boiler, which comprises: determining the heat flux actually reaching the inside wall of the boiler, determining the heat flux theoretically reaching the inside wall of the boiler if free from deposits, recording the heat flux values, and actuating at least one boiler control operation in response to said recorded heat flux values.
Claim 14
Independent Claim 61 words
A method for the control of a pulverized coal-fired boiler, which comprises: determining the heat flux actually reaching the inside wall of the boiler, determining the heat flux theoretically reaching the inside wall of the boiler if free from deposits, recording the heat flux values, and actuating at least one boiler control operation in response to said recorded heat flux values.
Claim 15
Dependent Claim 16 words
The method of claim 11, wherein said at least one boiler control operation is actuated manually.
Claim 16
Dependent Claim 23 words
The method of claim 11, wherein said at least one boiler control operation is actuated automatically in response to predetermined recorded flux values.
Claim 17
Dependent Claim 28 words
The method of claim 11, 12 or 13 wherein the determined flux values are compared to provide a comparative signal in response to which said actuation is effected.
Claim 18
Dependent Claim 23 words
The method of claim 11, 12 or 13 wherein said heat flux is determined at at least one location on said inside wall.
Claim 19
Dependent Claim 51 words
The method of claim 15 wherein said heat flux actually reaching the inside wall of the boiler is determined at a plurality of locations on said inside wall and said heat flux theoretically reaching the inside wall of the boiler is determined at at least one location on said inside wall.
Claim 20
Dependent Claim 67 words
Furnace ash monitoring apparatus, comprising: first heat flux detecting means for generating a first electrical signal proportional to the heat flux detected thereby, means maintaining said first heat flux detecting means free from ash deposits in said furnace, second heat flux detecting means for generating a second electrical signal proportional to the heat flux detected thereby, and recording means for recording said first and second electrical signals.
Claim 21
Dependent Claim 67 words
Furnace ash monitoring apparatus, comprising: first heat flux detecting means for generating a first electrical signal proportional to the heat flux detected thereby, means maintaining said first heat flux detecting means free from ash deposits in said furnace, second heat flux detecting means for generating a second electrical signal proportional to the heat flux detected thereby, and recording means for recording said first and second electrical signals.
Claim 22
Dependent Claim 18 words
The apparatus of claim 15, wherein said first and second heat flux detecting means are heat flux meters.
Claim 23
Dependent Claim 36 words
The apparatus of claim 17, wherein a plurality of said second heat flux detecting means is provided in said furnace and at least one of said first heat flux detecting means is provided in said furnace.
Claim 24
Dependent Claim 60 words
The apparatus of claim 17, 18 or 19 including comparative means for comparing the magnitude of said first and second electrical signals to produce a third signal corresponding in magnitude to the thickness of furnace ash on said second heat flux detecting means, whereby said first and second electrical signals are recorded by said recording means on said third signal.

References Cited (Backward Citations)

US3312274A Cited
US3785351A Cited
US4309194A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-10-10 1987-04-11 1987-10-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-10-10 1991-04-11 1991-10-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-10-10 1995-04-11 1995-10-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag