Patent US4402083A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4402083A Expired / Lapsed US ⏱️ 0.0 years remaining

Electric smelting furnace and associated charging equipment and bins

Assignee: MAN AG
•
Filing: 1982-02-18
•
Granted: 1983-08-30
•
Expires: 2002-02-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract To save space in furnace installations and obtain an optimum continuous charging, an arrangement is disclosed in which electric smelting furnaces are arranged in a furnace bay unilaterally, close to the adjacent ladle bay and the associated charging equipment and bins are provided sequentially in a vertical zone between the crane runways of the two bays. Bins are filled with iron material, such as iron sponge, alloying mechanisms, and fluxing substances by a conveyor traveling thereabove. The contents of bins are delivered through conveying and metering devices which are provided between crane runways to a reversible conveyor extending at a lower level and equipped with discharge mechanisms and fed through a charging tube 1 into electric furnace. A traveling metering device is provided for adding alloying into the furnace, and fluxing material for subsequent treatment in the ladle, through charging tube. A housing encloses the furnace on all sides, to prevent emissions. The furnace bay may be completely separated from the adjacent ladle bay by a protective wall and by shutoff partitions which are provided at both sides of the bins.

Inventors

  • 👤 Edgar Paskarbeit
  • 👤 Horst D. Scholer

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 20:51
CPC Classifications
F; F27; F27D; F27D21/00; C; C21; C21C; C21C5/00; C21C5/52; C21C5/527; F27B; F27B3/00; F27B3/10; F27B3/18; F27B3/183; F27D3/00; F27D3/0025; F27D3/0033; F27D2003/0001; F27D2003/0006; F27D2003/001; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 262 words
In an electric smelting furnace arrangement of the type having an electric smelting furnace including a furnace vessel, bins, charging equipment means operable for transporting a charge into the bins, conveying means and metering means for removing the charge from the bins, charging tubes for feeding the charge into the furnace vessel, an elongated furnace bay, an elongated ladle bay longitudinally extending adjacent to the furnace bay and crane runways, one of said crane runways being longitudinally extended over a respective one of each of the furnace bay and ladle bay, the improvement wherein the electric smelting furnace is provided in the furnace bay at a side close to the ladle bay adjacent to the furnace bay, the bins comprising first bins for iron stock and second bins for fluxing material and alloying means, and first outlet means connected to said first bins, second outlet means connected to said second bins, conveyors and metering devices located underneath said first and second outlet means, wherein said first and second bins, said first and second outlet means, said conveyors and said metering devices are sequentially mounted in the longitudinal direction of said furnace and ladle bays in a vertical zone between said crane runways of the furnace bay and the adjacent ladle bay, and a reversible conveyor extending transversely to the longitudinal direction of said furnace and ladle bays at lower level beneath said bins, said outlet means, said first-mentioned conveyors and said metering devices, discharge means at both ends of said reversible conveyor, and charging tubes for receiving discharge from said discharge means.
Claim 2
Dependent Claim 262 words
In an electric smelting furnace arrangement of the type having an electric smelting furnace including a furnace vessel, bins, charging equipment means operable for transporting a charge into the bins, conveying means and metering means for removing the charge from the bins, charging tubes for feeding the charge into the furnace vessel, an elongated furnace bay, an elongated ladle bay longitudinally extending adjacent to the furnace bay and crane runways, one of said crane runways being longitudinally extended over a respective one of each of the furnace bay and ladle bay, the improvement wherein the electric smelting furnace is provided in the furnace bay at a side close to the ladle bay adjacent to the furnace bay, the bins comprising first bins for iron stock and second bins for fluxing material and alloying means, and first outlet means connected to said first bins, second outlet means connected to said second bins, conveyors and metering devices located underneath said first and second outlet means, wherein said first and second bins, said first and second outlet means, said conveyors and said metering devices are sequentially mounted in the longitudinal direction of said furnace and ladle bays in a vertical zone between said crane runways of the furnace bay and the adjacent ladle bay, and a reversible conveyor extending transversely to the longitudinal direction of said furnace and ladle bays at lower level beneath said bins, said outlet means, said first-mentioned conveyors and said metering devices, discharge means at both ends of said reversible conveyor, and charging tubes for receiving discharge from said discharge means.
Claim 3
Dependent Claim 39 words
An improved arrangement according to claim 1, further comprising a metering device operatively connected to said second bins, said metering device being movable in parallel to said first-mentioned conveyings, said metering device being operable to supply said reversible conveyor.
Claim 4
Dependent Claim 76 words
An improved arrangement according to claim 1 or 2, wherein one or more of said charging tubes are provided for filling the furnace and are connected to said discharge means at the furnace side, and one or more of said charging tubes are provided for the tap and for secondary metallurgical treatment in the ladle and are connected to the discharge means at the opposite side of said reversible conveyor extending transversely into the furnace bay.
Claim 5
Dependent Claim 43 words
An improved arrangement according to claim 1, further comprising a housing enclosing the electric smelting furnace, said housing having a displaceable wall at a side turned to the furnace bay, said housing having apertures, and said charging tubes being passed through said apertures.
Claim 6
Dependent Claim 40 words
An improved arrangement according to claim 1, wherein except for openings necessary for means of transportation, shutoff partitions are provided for completely separating the furnace bay from the adjacent ladle bay at both sides of the overhead bins and conveyors.

References Cited (Backward Citations)

US3385584A Cited
US3634592A Cited
US3746325A Cited
US3936588A Cited
US3913898A Cited
US3938788A Cited
US4160117A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-08-29 1987-02-28 1987-08-30 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-08-29 1991-02-28 1991-08-30 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-08-29 1995-02-28 1995-08-30 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag