Patent US4400341A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4400341A Expired / Lapsed US ⏱️ 0.0 years remaining

Injection molding of thermoplastics in sandwich mold employing desynchronized opening, extended and closing periods

Assignee: SORENSEN JENS OLE PO BOX 2274 RANCHO SANTA FE CA 92067
•
Filing: 1981-06-19
•
Granted: 1983-08-23
•
Expires: 2001-06-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of injection molding a thermoplastic material to produce a product in a sandwich mold comprising at least two ejection ports each having a cooling cavity, and a single runner system for feeding the two cooling cavities, where each ejection port passes through a retracted period and a protracted period which together make up its production cycle, where the retracted period comprises an injection period and a cooling period and where the protracted period comprises an opening period, an extended period or point in time, and a closing period, the method comprising the step of desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening extended and closing periods of a second ejection port.

Inventors

  • 👤 Jens O. Sorensen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 22:39
CPC Classifications
B; B29; B29C; B29C45/00; B29C45/17; B29C45/26; B29C45/32; B29C45/03; B29C45/12

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 150 words
A method of injection molding a thermoplastic material to produce a product in a sandwich mold comprising at least two ejection ports, each having a cooling cavity and a single runner system for feeding the two cooling cavities, wherein each ejection port passes through a retracted period and a protracted period which together make up its production cycle, wherein the retracted period comprises an injection period and a coolng period, wherein the protracted period comprises an opening period, an extended period or point in time, and a closing period, wherein the retracted periods for the two ejection ports overlap, and wherein the injection periods for both of the two ejection ports occur during each overlapping period, the method being characterized by the step of: (a) desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening, extended and closing periods of a second ejection port.
Claim 2
Independent Claim 150 words
A method of injection molding a thermoplastic material to produce a product in a sandwich mold comprising at least two ejection ports, each having a cooling cavity and a single runner system for feeding the two cooling cavities, wherein each ejection port passes through a retracted period and a protracted period which together make up its production cycle, wherein the retracted period comprises an injection period and a coolng period, wherein the protracted period comprises an opening period, an extended period or point in time, and a closing period, wherein the retracted periods for the two ejection ports overlap, and wherein the injection periods for both of the two ejection ports occur during each overlapping period, the method being characterized by the step of: (a) desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening, extended and closing periods of a second ejection port.
Claim 3
Dependent Claim 34 words
A method according to claim 1, wherein step (a) comprises the step of: (b) beginning the opening period of the second ejection port subsequent to beginning the opening period of the first ejection port.
Claim 4
Dependent Claim 32 words
A method according to claim 1, comprising the additional step of: (b) beginning the closing period of the first ejection port prior to ending the opening period of the second ejection port.
Claim 5
Dependent Claim 34 words
A method according to claim 1, wherein step (a) comprises the step of: (b) ending the opening period of the second ejection port subsequent to ending the opening period of the first ejection port.
Claim 6
Dependent Claim 33 words
A method according to claim 1, comprising the additional step of: (b) beginning the opening period of the second ejection port not later than beginning the closing period of the first ejection port.
Claim 7
Dependent Claim 71 words
A method according to claim 5, wherein step (b) comprises the step of: (c) beginning the opening period of the second ejection port not later than at the end of the opening period of the first ejection port and the method comprises the additional step of: (d) beginning the closing period of the second ejection port not later than at the end of the closing period of the first ejection port.
Claim 8
Dependent Claim 65 words
A method according to claim 6, wherein step (c) comprises the step of: (e) beginning the opening period of the second ejection port before the end of the opening period of the first ejection port and wherein step (d) comprises the step of (f) beginning the closing period of the second ejection port before the end of the closing period of the first ejection port.
Claim 9
Dependent Claim 32 words
A method according to claim 5, wherein step (b) comprises the step of: (c) synchronizing the closing period of the first ejection port with the opening period of the second ejection port.
Claim 10
Dependent Claim 38 words
A method according to claim 1, comprising the additional step of: (b) ending the injection period of both the first ejection port and the second ejection port prior to beginning the protracted period of the first ejection port.
Claim 11
Dependent Claim 30 words
A method according to claim 1, further comprising the step of: (b) separating the injection period of the first ejection port from the injection period of the second ejection port.
Claim 12
Independent Claim 214 words
A method of injection molding a thermoplastic material to produce a product in a sandwich mold that includes at least two ejection ports, each having a cooling cavity, and a single runner system for feeding the two cooling cavities, wherein each ejection port passes through a retracted period and a protracted period which together make up its production cycle, wherein the retracted period includes an injection period and a cooling period, and wherein the protracted period includes an opening period, an extended period or point in time, and a closing period, the method being characterized by the steps of: (a) desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening, extended and closing periods of a second ejection port; (b) beginning the injection period of the first ejection port subsequent to ending the protracted period of the first ejection port; (c) ending the injection period of the first ejection port prior to beginning the protracted period of the second ejection port; (d) beginning the injection period of the second ejection port subsequent to ending the protracted period of the second ejection port; and (e) ending the injection period of the second ejection port prior to beginning the protracted period of the first ejection port for the following cycle.
Claim 13
Independent Claim 214 words
A method of injection molding a thermoplastic material to produce a product in a sandwich mold that includes at least two ejection ports, each having a cooling cavity, and a single runner system for feeding the two cooling cavities, wherein each ejection port passes through a retracted period and a protracted period which together make up its production cycle, wherein the retracted period includes an injection period and a cooling period, and wherein the protracted period includes an opening period, an extended period or point in time, and a closing period, the method being characterized by the steps of: (a) desynchronizing the opening, extended and closing periods of a first ejection port with the respective opening, extended and closing periods of a second ejection port; (b) beginning the injection period of the first ejection port subsequent to ending the protracted period of the first ejection port; (c) ending the injection period of the first ejection port prior to beginning the protracted period of the second ejection port; (d) beginning the injection period of the second ejection port subsequent to ending the protracted period of the second ejection port; and (e) ending the injection period of the second ejection port prior to beginning the protracted period of the first ejection port for the following cycle.

References Cited (Backward Citations)

US3669601A Cited
US3707342A Cited
US3973892A Cited
US4005964A Cited
US4146600A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1986-08-22 1987-02-21 1987-08-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1990-08-22 1991-02-21 1991-08-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1994-08-22 1995-02-21 1995-08-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag