Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
373 words
In a loader having a mobile frame including upwardly extending, laterally spaced side members; a boom structure pivotally mounted on said frame and moveable in a generally vertical path direction, said boom structure including a pair of boom arms generally vertically moveable along a path adjacent said sidewalls; first power means operatively associated with said boom structure for moving said arms along said path of movement; and an operator's compartment positioned between said sidewalls, the improvement comprising: power interruption means operatively associated with said power means to selectively render said power means inoperative to vertically move said boom structure; control means operatively connected to said power interruption means for selectively controlling the operation thereof to render said power means inoperative to vertically move said boom structure, said control means including an electrical circuit having a first switch manually moveable between an on position and an off position and a second switch operatively positioned to sense the presence of an operator within said operator's compartment, said second switch being positioned in an on position when an operator is sensed within said operator's compartment and in an off position when an operator is not sensed within said operator's compartment, said electrical circuit being connected to an energy source to provide energy to control said power interruption means, said power interruption means rendering said power means inoperative when either of said first and second switches are positioned in the off position; and time delay means operatively associated with said control means to prevent said power interruption means from rendering said power means inoperative for a predetermined period of time after said second switch becomes positioned in said off position, said time delay means including a capacitor connected to said electrical circuit in parallel with said energy source, a first diode connected to said electrical circuit in series with said capacitor and in parallel with a resistor, said capacitor providing a temporary source of electrical current to said power interruption means after said second switch has been moved to said off position, said first diode permitting the flow of current from said energy source to charge said capacitor and requiring the flow of current from said capacitor to flow to said power interruption means through said resistor.
Claim 2
Dependent Claim
373 words
In a loader having a mobile frame including upwardly extending, laterally spaced side members; a boom structure pivotally mounted on said frame and moveable in a generally vertical path direction, said boom structure including a pair of boom arms generally vertically moveable along a path adjacent said sidewalls; first power means operatively associated with said boom structure for moving said arms along said path of movement; and an operator's compartment positioned between said sidewalls, the improvement comprising: power interruption means operatively associated with said power means to selectively render said power means inoperative to vertically move said boom structure; control means operatively connected to said power interruption means for selectively controlling the operation thereof to render said power means inoperative to vertically move said boom structure, said control means including an electrical circuit having a first switch manually moveable between an on position and an off position and a second switch operatively positioned to sense the presence of an operator within said operator's compartment, said second switch being positioned in an on position when an operator is sensed within said operator's compartment and in an off position when an operator is not sensed within said operator's compartment, said electrical circuit being connected to an energy source to provide energy to control said power interruption means, said power interruption means rendering said power means inoperative when either of said first and second switches are positioned in the off position; and time delay means operatively associated with said control means to prevent said power interruption means from rendering said power means inoperative for a predetermined period of time after said second switch becomes positioned in said off position, said time delay means including a capacitor connected to said electrical circuit in parallel with said energy source, a first diode connected to said electrical circuit in series with said capacitor and in parallel with a resistor, said capacitor providing a temporary source of electrical current to said power interruption means after said second switch has been moved to said off position, said first diode permitting the flow of current from said energy source to charge said capacitor and requiring the flow of current from said capacitor to flow to said power interruption means through said resistor.
Claim 3
Dependent Claim
97 words
The loader of claim 1 wherein said power means includes a hydraulic cylinder interconnecting said frame and one of said boom arms, a hydraulic circuit supplying fluid under pressure to said cylinder and a control valve for controlling the direction of flow through said hydraulic circuit to manipulate the length of said cylinder and effect a vertical movement of said boom structure, said power interruption means including a solenoid valve connected to said hydraulic circuit and being operable to prevent the flow of fluid through said hydraulic circuit for effecting the vertical movement of said boom structure.
Claim 4
Dependent Claim
89 words
The loader of claim 2 further having a seat mounted on said mobile frame within said operator's compartment, said second switch being mounted on said seat to sense when an operator is sitting on said seat, said second switch being in said on position when an operator is sensed to be sitting on said seat and in said off position when an operator is not sensed to be sitting on said seat, said energy source being a device for producing a flow of electrical current through said electrical circuit.
Claim 5
Dependent Claim
78 words
The loader of claim 3 wherein said control means further includes a second diode connected to said electrical circuit in parallel with said solenoid valve, said first and second switches being positioned in said electrical circuit between said second diode and said energy source, said second diode providing dissipation of electrical energy stored in said solenoid valve to minimize arcing of electrical current over one of said switches when said one switch is positioned in the off position.
Claim 6
Dependent Claim
70 words
The loader of claim 4 wherein said capacitor has a rating of 3,300 microfarad and 25 volts D.C., said resistor being a 68 ohm, 1/4 watt carbon resistor, said first and second diodes being 1N4004 diodes, said predetermined period of time for said time delay means amounting to approximately 0.3 seconds when said solenoid valve has a resistance of approximately 8 ohms and a dropout voltage of approximately 1.5 volts.
Claim 7
Dependent Claim
26 words
The loader of claim 5 wherein said capacitor, said resistor and said first and second diodes are encapsulated in a plastic tube with a rigid epoxy.