Patent US4386876A successfully refreshed from Google Patents.
US4386876A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Production of anchored tie-rods
Assignee: Sondages Injections Forages SIF Enterprise Bachy
•
Filing: 1981-04-30
•
Granted: 1983-06-07
•
Expires: 2001-04-30
Abstract
Abstract The invention relates in particular to a device for producing tie-rods anchored in the ground, which comprises a tubular protective element comprising a top part and a base part and provided on its base part with at least one injection aperture, and at least one element constituting a tie-rod situated inside the tubular element, wherein the part of the element constituting the tie-rod extending along the top part of the tubular element is surrounded by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing.
Inventors
- 👤 Paul Dupeuble
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 00:49
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/74; E02D5/76
Claims Analysis
Total Claims: 21
Claim 1
Independent Claim
178 words
A device for use in the production of a tie-rod anchored in the ground, comprising a protective tubular element having a top part and a base part, and provided in its base part with at least one injection aperture and at least one metallic element constituting a tie-rod placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, and annular separating means affixed around the tubular element at the location where the base part and top part merge for preventing the annular space between the wall of the bore-hole and the base part of said tubular element to be filled with setting composition used for filling the annular space between the wall of the bore-hole and the top part of said tubular element.
Claim 2
Independent Claim
178 words
A device for use in the production of a tie-rod anchored in the ground, comprising a protective tubular element having a top part and a base part, and provided in its base part with at least one injection aperture and at least one metallic element constituting a tie-rod placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, and annular separating means affixed around the tubular element at the location where the base part and top part merge for preventing the annular space between the wall of the bore-hole and the base part of said tubular element to be filled with setting composition used for filling the annular space between the wall of the bore-hole and the top part of said tubular element.
Claim 3
Dependent Claim
14 words
The device according to claim 1, wherein said annular separating means is a disk.
Claim 4
Dependent Claim
296 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introduction into a bore-hole in the ground of a device comprising a protective tubular element having a top part and a base part, and separating means in the form of a disk affixed to the outer wall of the tubular element at the location where the base part and top part merge, and provided in its base part with at least one injection aperture and at least one metallic element constituting a tie-rod placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) injection under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (d) after the cement has set, stressing the covered part of the metallic element constituting the tie-rod.
Claim 5
Dependent Claim
296 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introduction into a bore-hole in the ground of a device comprising a protective tubular element having a top part and a base part, and separating means in the form of a disk affixed to the outer wall of the tubular element at the location where the base part and top part merge, and provided in its base part with at least one injection aperture and at least one metallic element constituting a tie-rod placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) injection under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (d) after the cement has set, stressing the covered part of the metallic element constituting the tie-rod.
Claim 6
Dependent Claim
31 words
The process according to claim 3, wherein said disk affixed to the outer wall of said tubular element is made of a resilient material which takes the form of a corolla.
Claim 7
Dependent Claim
299 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introduction into a bore-hole in the ground of a device comprising a protective tubular element having a top part and a base part, and separating means in the form of a disk affixed to the outer wall of the tubular element at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) at least one metalic element constituting a tie-rod is placed inside the tubular element, the part of the metallic element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (c) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (d) injection under high pressure of mortar, cement of any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (d) after the cement has set, stressing the covered part of the metallic element constituting the tie-rod.
Claim 8
Dependent Claim
299 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introduction into a bore-hole in the ground of a device comprising a protective tubular element having a top part and a base part, and separating means in the form of a disk affixed to the outer wall of the tubular element at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) at least one metalic element constituting a tie-rod is placed inside the tubular element, the part of the metallic element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (c) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (d) injection under high pressure of mortar, cement of any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (d) after the cement has set, stressing the covered part of the metallic element constituting the tie-rod.
Claim 9
Dependent Claim
31 words
The process according to claim 5, wherein said disk affixed to the outer wall of said tubular element is made of a resilient material which takes the form of a corolla.
Claim 10
Dependent Claim
297 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introduction into a bore-hole in the ground of a device comprising a protective tubular element having a top part and a base part, and separating means in the form of a disk affixed to the outer wall of the tubular element at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) at least one metallic element constituting a tie-rod is placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (d) injection under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (e) after the cement has set, stressing the covered part of the metallic element constituting the tie-rod.
Claim 11
Dependent Claim
297 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introduction into a bore-hole in the ground of a device comprising a protective tubular element having a top part and a base part, and separating means in the form of a disk affixed to the outer wall of the tubular element at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) at least one metallic element constituting a tie-rod is placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (d) injection under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (e) after the cement has set, stressing the covered part of the metallic element constituting the tie-rod.
Claim 12
Dependent Claim
31 words
The process according to claim 7, wherein said disk affixed to the outer wall of said tubular element is made of a resilient material which takes the form of a corolla.
Claim 13
Dependent Claim
293 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introducing into a bore-hole in the ground a device comprising a protective tubular element having a top part and a base part, and annular separating means positioned between the outer wall of the tubular element and the bore-hole at the location where the base plate and top part merge, and provided in its base part with at least one injection aperture and at least one metallic element constituting a tie-rod placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) injection under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (d) after the cement has set, tensioning the covered part of the metallic element constituting the tie-rod.
Claim 14
Dependent Claim
293 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introducing into a bore-hole in the ground a device comprising a protective tubular element having a top part and a base part, and annular separating means positioned between the outer wall of the tubular element and the bore-hole at the location where the base plate and top part merge, and provided in its base part with at least one injection aperture and at least one metallic element constituting a tie-rod placed inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) injection under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (d) after the cement has set, tensioning the covered part of the metallic element constituting the tie-rod.
Claim 15
Dependent Claim
45 words
The process according to claim 9, wherein said annular separating means recited in step (c) is a disk element which is affixed to the outer wall of said tubular element to form a barrier in the annular space between said bore-hole and said tubular element.
Claim 16
Dependent Claim
294 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introducing into a bore-hole in the ground a device comprising a protective tubular element having a top part and a base part, and annular separating means positioned between the outer wall of the tubular element and the bore-hole at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) placing at least one metallic element constituting a tie-rod inside the tubular element, the part of the metallic element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (c) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (d) injecting under high pressure mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (e) after the cement has set, tensioning the covered part of the metallic element constituting the tie-rod.
Claim 17
Dependent Claim
294 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introducing into a bore-hole in the ground a device comprising a protective tubular element having a top part and a base part, and annular separating means positioned between the outer wall of the tubular element and the bore-hole at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) placing at least one metallic element constituting a tie-rod inside the tubular element, the part of the metallic element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (c) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (d) injecting under high pressure mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (e) after the cement has set, tensioning the covered part of the metallic element constituting the tie-rod.
Claim 18
Dependent Claim
45 words
The process according to claim 11, wherein said annular separating means recited in step (c) is a disk element which is affixed to the outer wall of said tubular element to form a barrier in the annular space between said bore-hole and said tubular element.
Claim 19
Dependent Claim
293 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introducing into a bore-hole in the ground a device comprising a protective tubular element having a top part and a base part, and annular separating means positioned between the outer wall of the tubular element and the bore-hole at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) placing at least one metallic element constituting a tie-rod inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (d) injecting under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (e) after the cement has set, tensioning the covered part of the metallic element constituting the tie-rod.
Claim 20
Dependent Claim
293 words
A process for the production of a tie-rod anchored in the ground, comprising the following steps: (a) introducing into a bore-hole in the ground a device comprising a protective tubular element having a top part and a base part, and annular separating means positioned between the outer wall of the tubular element and the bore-hole at the location where the base part and top part merge, and provided in its base part with at least one injection aperture, the bore-hole having a larger diameter than the device, (b) sealing from the exterior the annular space between the wall of the bore-hole and the base part of the tubular element by injecting a suitable setting composition to fill the annular space between the separating means and the top of the bore-hole to thereby facilitate the filling of said tubular element and the surrounding ground with a setting composition, (c) placing at least one metallic element constituting a tie-rod inside the tubular element, the part of the element constituting the tie-rod which extends through the top part of the tubular element being enclosed by a protective casing, with lubricant inserted between the element constituting the tie-rod and the casing, and the part of the element constituting the tie-rod which extends through the base part of the tubular element being surrounded by said base part, (d) injecting under high pressure of mortar, cement or any other suitable setting composition into the protective tubular element, so that the mortar or cement fills the said tubular element and then passes through the injection aperture provided in the base part of the said tubular element and penetrates into the surrounding ground, and (e) after the cement has set, tensioning the covered part of the metallic element constituting the tie-rod.
Claim 21
Dependent Claim
45 words
The process according to claim 13, wherein said annular separating means recited in step (c) is a disk element which is affixed to the outer wall of said tubular element to form a barrier in the annular space between said bore-hole and said tubular element.
References Cited (Backward Citations)
US3494134A
Cited
US3738071A
Cited
DE2356163A1
Cited
US4069677A
Cited
US4094117A
Cited
US4139323A
Cited
US4124983A
Cited
US4140429A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1986-06-06 | 1986-12-06 | 1987-06-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1990-06-06 | 1990-12-06 | 1991-06-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1994-06-06 | 1994-12-06 | 1995-06-07 | $7700.00 | Window Closed / Lapsed |