Abstract

Abstract All line control is performed with a power demand control system to bring about ideal rate before the end of a demand period. Demand error is modified so as to project the demand toward a definite point on the ideal rate curve, then to follow the ideal rate toward the target. Correction at a chosen point in time takes into account a possible duration from ideal rate consumption by either choosing the ideal rate short of the target or by pointing exactly to the target. All lines are individually controlled by tap changing with variable deadband and hysteresis, and tap moves are estimated on the basis of individual wattage and amperage changes in a previous control cycle. The minimum between necessary tap moves and the tap moves possible within an upper and a lower limit in the cell line amperage is used for control. The system allows safe settings by the operator and establishes passwords to communicate with the computer system when protected steps are to be dealt with, by the engineer, for instance.

Inventors

  • 👤 Francis R. Czerniejewski

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 05:17
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 170 words
A method of controlling the loads in a plant facility while keeping the overall plant consumption within an assigned power demand limit, comprising the steps of: measuring the actual power rate of consumption by said plant; establishing successive demand periods for totalizing the power demand from the beginning of a demand period to the end thereof; said power demand limit being assigned at the end of a demand period; periodically calculating a demand error projected to be at the end of a demand period on the basis of actual power rate; changing concurrently with said calculating step the demand error into a changed error by an amount sufficient to reach at a predetermined instant selected before the end of the demand period a power rate corresponding to the ideal rate of consumption at said predetermined instant; and controlling at least one of said loads in order to compensate for such said changed error, thereby reaching said assigned demand limit under the ideal rate at the end of the demand period.
Claim 2
Independent Claim 170 words
A method of controlling the loads in a plant facility while keeping the overall plant consumption within an assigned power demand limit, comprising the steps of: measuring the actual power rate of consumption by said plant; establishing successive demand periods for totalizing the power demand from the beginning of a demand period to the end thereof; said power demand limit being assigned at the end of a demand period; periodically calculating a demand error projected to be at the end of a demand period on the basis of actual power rate; changing concurrently with said calculating step the demand error into a changed error by an amount sufficient to reach at a predetermined instant selected before the end of the demand period a power rate corresponding to the ideal rate of consumption at said predetermined instant; and controlling at least one of said loads in order to compensate for such said changed error, thereby reaching said assigned demand limit under the ideal rate at the end of the demand period.
Claim 3
Dependent Claim 46 words
The method of claim 1 with a step substituted for said changing step taken at said predetermined instant consisting of controlling at least one of said loads to change the power rate to become equal to the ideal rate at the end of the demand period.
Claim 4
Dependent Claim 44 words
The method of claim 2 wherein said sufficient amount is the difference between the energy consumption at said actual power rate and the energy at said ideal rate over a time interval extending from said predetermined instant to the end of the demand period.
Claim 5
Dependent Claim 23 words
The method of claim 3 wherein said changing step is based on a comparison between the actual power rate and the ideal rate.
Claim 6
Dependent Claim 60 words
The method of claim 4 wherein upon said predetermined instant said step of changing the power rate is modified, in response to a demand error such that the ideal rate is larger than the actual power rate, by controlling at least one of said loads to aim at said assigned power demand limit at the end of the demand period.
Claim 7
Dependent Claim 56 words
The method of claim 4 wherein upon said predetermined instant said step of changing the power rate is modified in response to a demand error, such that the ideal rate is smaller than the actual power rate, by controlling at least one of said loads to aim at said assigned demand limit under the ideal rate.
Claim 8
Dependent Claim 76 words
The method of claim 1 wherein the plant facility includes loads having individual tap changes for individual tap changing to provide a different power KW and a different current KA on the controlled load when controlled by said controlling step; said controlling step effecting upon at least one of said loads a change ΔKW in KW and ΔKA in KA, said ΔKW and ΔKA changes being used to estimate a change in KW and in KA.
Claim 9
Dependent Claim 57 words
The method of claim 7 wherein said tap changers have an upper limit and a lower limit defining a maximum and a minimum control for each of said at least one loads, said controlling step being completed by additional tap changes on another one of said loads when one of said upper and lower limits is reached.
Claim 10
Dependent Claim 230 words
In a power demand control system of a plant facility having a plurality of electrical loads which are controllably sheddable and a plurality of electrical loads which are selectively adjustable in relation to individual power rate consumption, said loads being supplied with energy from the power lines of a utility company, and including: a utility company main kilowatt hour meter providing indication of present power demand of said plant facility; means responsive to said main kilowatt hour meter and operative during successive demand periods for deriving an anticipated demand of energy at the end of a current demand period and establishing a demand error relative to an assigned demand limit not to be exceeded for the overall plant at the end of such demand period; and means responsive to said demand error for controlling said loads to minimize said error; first means operative within a portion of said demand period immediately preceding a predetermined time interval counted from the end of said demand period for changing said demand error by a first amount sufficient to reach through operation of said controlling means with said adjustable loads a predetermined operative point at the beginning of said predetermined time interval; and second means operative from said predetermined operative point to establish with said adjustable load an ideal power rate for reaching said assigned demand limit at the end of said demand period.
Claim 11
Dependent Claim 230 words
In a power demand control system of a plant facility having a plurality of electrical loads which are controllably sheddable and a plurality of electrical loads which are selectively adjustable in relation to individual power rate consumption, said loads being supplied with energy from the power lines of a utility company, and including: a utility company main kilowatt hour meter providing indication of present power demand of said plant facility; means responsive to said main kilowatt hour meter and operative during successive demand periods for deriving an anticipated demand of energy at the end of a current demand period and establishing a demand error relative to an assigned demand limit not to be exceeded for the overall plant at the end of such demand period; and means responsive to said demand error for controlling said loads to minimize said error; first means operative within a portion of said demand period immediately preceding a predetermined time interval counted from the end of said demand period for changing said demand error by a first amount sufficient to reach through operation of said controlling means with said adjustable loads a predetermined operative point at the beginning of said predetermined time interval; and second means operative from said predetermined operative point to establish with said adjustable load an ideal power rate for reaching said assigned demand limit at the end of said demand period.
Claim 12
Dependent Claim 60 words
The system of claim 9 wherein said second means is disabled when the power rate necessary at the beginning of said predetermined time interval to reach said assigned demand limit is smaller than said ideal power rate; and wherein third means is provided triggered by disabling of said second means for changing the power rate to said necessary power rate.
Claim 13
Dependent Claim 56 words
The system of claim 10 wherein said adjustable loads each have individual tap changers for control thereof; wherein said adjustable loads have a predetermined priority order for selection one at a time; and wherein the individual tap changer of a selected adjustable load is actuated upon in response to one of said second and third means.
Claim 14
Dependent Claim 73 words
The system of claim 11 wherein said adjustable loads have individual amperemeters and individual kilowatt meters, wherein individual amperemeters and individual kilowatt meters are provided in order to derive corresponding individual ΔKA and individual ΔKW, wherein control of the tap changer of a selected adjustable load is effected in response to a change in individual amperes increment ΔKA and in individual power increment ΔKW in relation to a preceding tap changer control operation.
Claim 15
Dependent Claim 68 words
The system of claim 12 wherein a maximum and a minimum ampere limit are assigned to each adjustable load; wherein control of the tap changer of a selected adjustable load is effected on the basis of the number of tap moves necessary to respond to said one of said first and second means, and limited to the number of tap moves possible under said maximum and minimum limits.
Claim 16
Dependent Claim 58 words
The system of claim 9 wherein said second means is disabled when the power rate necessary at the beginning of said predetermined time interval to reach said assigned demand limit is larger than said ideal rate; and wherein fourth means is provided triggered by disabling of said second means for changing the power rate to said ideal rate.

References Cited (Backward Citations)

US3387121A Cited
US3505508A Cited
US3522421A Cited
US4117537A Cited
US4106097A Cited
US4110825A Cited
US4136393A Cited
US4204127A Cited
US4161028A Cited
US4245319A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-12-06 1986-06-07 1986-12-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-12-06 1990-06-07 1990-12-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-12-06 1994-06-07 1994-12-07 $7700.00 Window Closed / Lapsed