Claims Analysis
Total Claims: 14
Claim 1
Independent Claim
196 words
In a leak testing apparatus for a hollow body having a main source of pressurized air and a regulated source of pressurized air, a fluid charge connection between the hollow body and said regulated source including a fluid actuated normally closed charge valve and a fluid actuated normally open test valve, a fluid test connection between the hollow body and a test source of pressurized air including a flow meter, said flow meter including contact means that are actuated by a predetermined leakage flow through said flow meter, fluid means including a fluidic memory unit for actuating said charge valve to establish said charge connection and for actuating a first fluid time delay, said test valve being responsive to the time out of said first fluid time delay for interupting said charge connection to establish said test connection, a second fluid time delay actuated in response to the time out of said first fluid time delay, means responsive to actuation of said flow meter contact means for indicating a leaking hollow body, and means responsive to the time out of said second fluid time delay for resetting said fluid memory unit to deactuate said charge valve.
Claim 2
Dependent Claim
196 words
In a leak testing apparatus for a hollow body having a main source of pressurized air and a regulated source of pressurized air, a fluid charge connection between the hollow body and said regulated source including a fluid actuated normally closed charge valve and a fluid actuated normally open test valve, a fluid test connection between the hollow body and a test source of pressurized air including a flow meter, said flow meter including contact means that are actuated by a predetermined leakage flow through said flow meter, fluid means including a fluidic memory unit for actuating said charge valve to establish said charge connection and for actuating a first fluid time delay, said test valve being responsive to the time out of said first fluid time delay for interupting said charge connection to establish said test connection, a second fluid time delay actuated in response to the time out of said first fluid time delay, means responsive to actuation of said flow meter contact means for indicating a leaking hollow body, and means responsive to the time out of said second fluid time delay for resetting said fluid memory unit to deactuate said charge valve.
Claim 3
Dependent Claim
16 words
The apparatus of claim 1 wherein said fluidic memory unit is a fluidic flip flop unit.
Claim 4
Dependent Claim
60 words
The apparatus of claim 2 wherein said means responsive to actuation of said contact means includes an "accept" indicator and a "reject" indicator, and means including a second fluidic flip flop unit for selectively energizing said indicators to respectively indicate a non-leaking and a leaking hollow body, said "reject" indicator being energized by actuation of said flow meter contact means.
Claim 5
Dependent Claim
26 words
The apparatus of claim 3 wherein said second fluidic flip flop unit is energized in response to the time out of said second fluid time delay.
Claim 6
Dependent Claim
51 words
The apparatus of claim 3 or 4 wherein said means responsive to actuation of said contact means includes a solenoid operated fluid valve, said valve being connected between said main source and said second fluid flip flop unit to set same in response to the energization of said solenoid operated valve.
Claim 7
Dependent Claim
56 words
The apparatus of claim 2 wherein said means for resetting includes a fluidic OR gate having an output connected to a reset input of said fluidic flip flop unit, one input of said OR gate connected to said second fluid time delay and another input connected to said regulated source through a manually operable "stop" button.
Claim 8
Dependent Claim
82 words
The apparatus of claim 3 or 4 wherein the means responsive to actuation of said contact means includes a solenoid operated fluid valve, said valve being connected between said main source and said second fluid flip flop unit through one input and an output connection of an OR fluidic gate to set same in response to the energization of said solenoid operated valve, and means connecting another input of said OR gate to said regulated source through a manually operable "stop" button.
Claim 9
Dependent Claim
22 words
The apparatus of claim 1 wherein said test source is a compensation chamber connected to said regulated source through said charge valve.
Claim 10
Dependent Claim
40 words
The apparatus of claim 8 including a second fluid actauted normally open test valve connected between said charge valve and said compensation chamber, said second test valve being actuated in response to the time out of said first time delay.
Claim 11
Dependent Claim
13 words
The apparatus of claim 1 wherein said test source is said regulated source.
Claim 12
Dependent Claim
46 words
The apparatus of claim 10 wherein said test connection includes said test valve, said test valve responsive to the time out of said first time delay for shifting from a normally open charge position establishing said charge connection to a test position establishing said test connection.
Claim 13
Dependent Claim
43 words
The apparatus according to claim 11 including a normally closed isolation valve connected between said main source and an actuating cylinder of said test valve, said isolation valve responsive to the time out of said first time delay for actuating said test valve.
Claim 14
Dependent Claim
22 words
The apparatus of claim 10 wherein said test connection includes said charge valve connected between said test source and said flow meter.