Patent US469842A successfully refreshed from Google Patents.
Patent US4345162A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4345162A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for power load shedding

Assignee: Honeywell Inc
•
Filing: 1980-06-30
•
Granted: 1982-08-17
•
Expires: 2000-06-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present invention contemplates a method and apparatus for load-shedding duty cycling which overrides the normal thermostat control in a space conditioning system, upon receipt of an external signal as from the power company, in a manner such that the consumed power does not rise above the level that persisted just prior to the initialization signal. The present invention monitors the thermostat-controlled cycling pattern of a space conditioning system such as an air conditioner. Normally, the last thermostat-controlled cycle is then caused to become the reference or control cycle for the load shedding interval. That is, the ON portion of the reference cycle is caused to become the maximum allowable ON interval and the OFF portion of the reference cycle is caused to become the minimum OFF interval for the entire load shedding interval. The device may be started by a single radio command or other means. The release from load control may be automatically timed or based on other signals. A radio receiver or other such means is provided to receive the signal from the power utility company which starts the load control function. Unique features are also provided to prevent the undesirable effects of tampering with the thermostat setpoint just prior to the load shedding interval or to compensate for any cycle pattern of unusually long duration. This is done by compensating for the effect of these events by modifying the reference or control cycle when the appear.

Inventors

  • 👤 Jeffrey M. Hammer
  • 👤 Thomas J. Olson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 17:01
CPC Classifications
G; G05; G05D; G05D23/00; G05D23/19; G05D23/1906; G05D23/1913; H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; F; F04; F04C; F04C2270/00; F04C2270/90; F25; F25B; F25B2600/00; F25B2600/02; F25B2600/025; F25B2600/0251; H02J2105/00; H02J2105/40; H02J2105/42; Y; Y02; Y02B; Y02B30/00; Y02B30/70; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222; Y04S20/242; Y04S20/244

Claims Analysis

Total Claims: 49
Claim 1
Independent Claim 174 words
A method of limiting the electrical power demand of electrical space conditioning means comprising the steps of: sensing the ON and OFF half-cycle times of the thermostat means associated with operation of the space conditioning load means; storing information related to said sensed ON and OFF half-cycle times; initiating overriding control of the ON-OFF switching function of the space conditioning load means from said thermostat means at the inception of a load-shedding interval; controlling the ON-OFF half-cycle times of the space-conditioning load during a load-shedding interval based on load-shed ON and OFF half-cycle times individually determined for that space conditioning load means derived from stored information and in a manner such that the thermostat state determines whether said space conditioning load means is ON during any part of each of said load-shed ON half-cycle times and said space conditioning means remains off during the load-shed OFF half-cycle regardless of thermostat state; and returning full control of said ON-OFF switching means of said space conditioning load means to said thermostat means after the load-shedding interval.
Claim 2
Independent Claim 174 words
A method of limiting the electrical power demand of electrical space conditioning means comprising the steps of: sensing the ON and OFF half-cycle times of the thermostat means associated with operation of the space conditioning load means; storing information related to said sensed ON and OFF half-cycle times; initiating overriding control of the ON-OFF switching function of the space conditioning load means from said thermostat means at the inception of a load-shedding interval; controlling the ON-OFF half-cycle times of the space-conditioning load during a load-shedding interval based on load-shed ON and OFF half-cycle times individually determined for that space conditioning load means derived from stored information and in a manner such that the thermostat state determines whether said space conditioning load means is ON during any part of each of said load-shed ON half-cycle times and said space conditioning means remains off during the load-shed OFF half-cycle regardless of thermostat state; and returning full control of said ON-OFF switching means of said space conditioning load means to said thermostat means after the load-shedding interval.
Claim 3
Dependent Claim 95 words
The method of claim 1 wherein said step of initiating overriding control of the ON-OFF switching function of said space conditioning load means is accomplished in phase with the operation of the space conditioning load means at the inception of load-shedding such that the natural half-cycle at the inception of load-shedding is not disturbed whether the space conditioning means be OFF or ON and wherein the initial load-shed half-cycle at the inception of load-shedding is made to be an ON or OFF half-cycle according to the half-cycle of the space conditioning means then in effect.
Claim 4
Dependent Claim 33 words
The method of claim 2 wherein the time of said ON natural half-cycle in effect at the inception of load-shedding is limited in time to the corresponding load-shed ON or OFF half-cycle time.
Claim 5
Dependent Claim 39 words
The method of claim 2 wherein said natural half-cycle at the inception of load-shedding is an OFF half-cycle the step of not initiating the first load-shed ON half-cycle before said thermostat means calls for the next natural ON cycle.
Claim 6
Dependent Claim 27 words
The method of claim 1 wherein the step of assuming overriding control of the ON-OFF switching means is initiated in response to an externally generated command signal.
Claim 7
Dependent Claim 23 words
The method of claim 1 wherein both said steps of assuming overriding control and returning control are responsive to externally generated command signals.
Claim 8
Independent Claim 20 words
The method of either of claims 5 or 6 wherein said command signals are generated by the electric power supplier.
Claim 9
Dependent Claim 28 words
The method of claim 7 further comprising the step of signally a plurality of systems in a power network substantially simultaneously to limit power usage in the network.
Claim 10
Dependent Claim 14 words
The method of claim 6 wherein said signalling is accomplished by radio frequency communication.
Claim 11
Dependent Claim 14 words
The method of claim 8 wherein said signalling is accomplished by radio frequency communication.
Claim 12
Dependent Claim 43 words
The method of claim 1 wherein said load-shed ON and OFF half-cycle times are established equal to specific sequential pairs of ON and OFF half-cycle times derived from the sensed past cycling history of said space-conditioning load and contained in said stored information.
Claim 13
Dependent Claim 77 words
The method of claim 11 wherein said load-shed ON and OFF half-cycle times are updated in said information storage means at each OFF to ON or ON to OFF switching event of said thermostat prior to the load-shedding interval so that the ON and OFF half-cycle times of the last natural thermostat-controlled cycle of said load prior to the assumption of control at the inception of said load-shedding interval become said load-shed ON and OFF half-cycle times.
Claim 14
Independent Claim 111 words
The method of any of claims 1, 11 or 12 further comprising the steps of: comparing the On half-cycle time of said load-shed cycle with predetermined maximum and minimum load-shed ON half-cycle time limits; updating said load-shed ON half-cycle time to be within said predetermined ON half-cycle time limits, if the time of said load-shed On half cycle is outside of said limits; comparing the OFF half-cycle time of said load-shed cycle with predetermined minimum and maximum load-shed OFF half-cycle time limits; updating said load-shed OFF half-cycle time to be within said OFF half-cycle time limits if the time of said load-shed OFF half cycle is outside of said time limits.
Claim 15
Independent Claim 51 words
The method of any of claims 1, 11 or 12 further comprising the steps of: setting the time of said load-shed ON half-cycle and said reference OFF half-cycle to equal the last thermostat-controlled ON half-cycle and thermostat-controlled OFF half-cycle sensed prior to the load-shedding interval which falls within predetermined time limits.
Claim 16
Dependent Claim 48 words
The method of claim 11 wherein said reference ON and OFF half-cycles for said controlled cycling of said space-conditioning load during the load-shedding interval are established equal to the natural thermostat-controlled ON and OFF half-cycle times of the load conditioning means closest to a selected time of day.
Claim 17
Dependent Claim 39 words
The method of claim 11 wherein a plurality of sequential pairs of ON-OFF half-cycle times are stored and a selected pair recalled by the electric power supplier for use as the load-shed ON-OFF half-cycles as communicated by command signals.
Claim 18
Independent Claim 40 words
The method of either of claims 11 or 15 wherein the stored ON and OFF half-cycle times to be used as the load-shed ON and OFF half-cycle times are selected by the electric power supplier and communicated by command signals.
Claim 19
Dependent Claim 15 words
The method of claim 17 wherein said command signals are accomplished by radio frequency communication.
Claim 20
Dependent Claim 28 words
The method of claim 18 comprising the step of signalling of plurality of systems in a power network substantially simultaneously to limit total power usage in that network.
Claim 21
Dependent Claim 26 words
The method of claim 13 wherein said maximum and minimum ON and OFF load-shed half-cycle time limits are under the control of the electric power supplier.
Claim 22
Dependent Claim 26 words
The method of claim 14 wherein said maximum and minimum ON and OFF load-shed half-cycle time limits are under the control of the electric power supplier.
Claim 23
Dependent Claim 39 words
The method of claim 1 including the step of gradually modifying said load-shed half-cycle ON time and said load-shed half-cycle OFF time at a predetermined rate for a portion of said load-shedding interval to modify the amount of load-shedding.
Claim 24
Dependent Claim 45 words
The method of claim 22 including the step of gradually increasing said load-shed ON half-cycle time and gradually decreasing said load-shed OFF cycle time at the end of the load-shedding interval until the thermostat switches to the OFF state again during an ON load-shed half-cycle.
Claim 25
Independent Claim 29 words
The method of either of claims 22 or 23 wherein the modification of said load-shed ON and OFF half-cycle times is under the control of the electric power supplier.
Claim 26
Dependent Claim 27 words
The method of claim 24 wherein said power supplier accomplishes said load-shed ON and OFF half-cycle time modification by radio frequency communication with said duty cycling apparatus.
Claim 27
Dependent Claim 62 words
The method of claim 1 further comprising the steps of: updating said load-shed ON half-cycle to equal the sensed thermostat ON half-cycle time each time the sensed thermostat ON half-cycle is shorter than said load-shed ON half-cycle; updating said load-shed OFF half-cycle to equal the sensed thermostat OFF half-cycle time each time the natural OFF half-cycle exceeds said load-shed OFF time limit.
Claim 28
Dependent Claim 203 words
A duty cycling apparatus for controlling the electrical power demand of a space conditioning load means comprising: timing means for sensing the ON and OFF half-cycle times of the thermostat means associated with the space conditioning load means; information storage means for storing information relating to said sensed ON and OFF half-cycle times of said thermostat means associated with said space conditioning load means; means for initiating overriding control over the ON-OFF switching means associated with said space conditioning load means overriding said thermostat means at the inception of a load-shedding interval; load-shed control means for controlling the ON and OFF half-cycle times of said space conditioning load means during a load-shedding interval based on individually determined load-shed ON and OFF half-cycle times derived from stored information in a manner such that the thermostat state determines whether said space conditioning means is ON during any part of each of said reference ON half-cycle times and said space conditioning means remains OFF during the load-shed OFF half-cycle regardless of thermostat state; means for returning control over said ON-OFF switching means of said space conditioning load means to said thermostat means after a load-shedding interval; and signal receiving means for receiving externally generated command signals.
Claim 29
Dependent Claim 203 words
A duty cycling apparatus for controlling the electrical power demand of a space conditioning load means comprising: timing means for sensing the ON and OFF half-cycle times of the thermostat means associated with the space conditioning load means; information storage means for storing information relating to said sensed ON and OFF half-cycle times of said thermostat means associated with said space conditioning load means; means for initiating overriding control over the ON-OFF switching means associated with said space conditioning load means overriding said thermostat means at the inception of a load-shedding interval; load-shed control means for controlling the ON and OFF half-cycle times of said space conditioning load means during a load-shedding interval based on individually determined load-shed ON and OFF half-cycle times derived from stored information in a manner such that the thermostat state determines whether said space conditioning means is ON during any part of each of said reference ON half-cycle times and said space conditioning means remains OFF during the load-shed OFF half-cycle regardless of thermostat state; means for returning control over said ON-OFF switching means of said space conditioning load means to said thermostat means after a load-shedding interval; and signal receiving means for receiving externally generated command signals.
Claim 30
Dependent Claim 85 words
The apparatus of claim 27 wherein said means for initiating overriding control of the ON-OFF switching function of said space conditioning load means further comprises means to phase in said overriding control such that the natural half-cycle at the inception of load-shedding is not disturbed whether the space conditioning means be OFF or ON and wherein the initial load-shed half-cycle at the inception of load-shedding is made to be an ON or OFF half-cycle according to half-cycle of the space conditioning means then in effect.
Claim 31
Dependent Claim 35 words
The apparatus of claim 28 wherein the time of said ON or OFF natural half-cycle in effect at the inception of load-shedding is limited in time to the corresponding load-shed ON or OFF half-cycle time.
Claim 32
Dependent Claim 58 words
The apparatus of claim 28 including ON half-cycle delay means in said information storage means initiated if said space conditioning means is OFF at the inception of load-shedding and said load-shed OFF half-cycle has timed out, said delay means preventing the start of the first load-shed ON half-cycle until said thermostat means initially switches to the ON state.
Claim 33
Dependent Claim 27 words
The apparatus of claim 27 further comprising means for selecting a particular sequential pair of load-shed ON-OFF cycle times from information stored in said information storage means.
Claim 34
Dependent Claim 21 words
The apparatus of claim 31 wherein selection of said particular load-shed ON-OFF cycle times is controlled by externally generated command signals.
Claim 35
Dependent Claim 45 words
The apparatus of claim 31 further comprising: means for comparing said selected load-shed ON-OFF cycle times with predetermined minimum and maximum ON and OFF half-cycle times; and means for modifying said load-shed ON-OFF half-cycle times as required to be within said maximum and minimum times.
Claim 36
Dependent Claim 65 words
The apparatus of claim 27 further comprising: means for selecting specific sequential pairs of ON-OFF half-cycle times based on external commands from the supplier of electric power; means for storing said selected pairs of ON-OFF half-cycle times; means for recalling one of said selected stored pairs for use as the load-shed ON and OFF cycles based on interval commands of the supplier of electric power.
Claim 37
Dependent Claim 33 words
The apparatus of claim 27 wherein the load-shed ON or OFF half-cycle is updated in said information storage means with each switching event of the thermostat state prior to the inception of load-shedding.
Claim 38
Dependent Claim 34 words
The apparatus of claim 35 wherein timed ON and OFF half-cycles falling outside predetermined maximum/minimum time limits are treated by said information storage means in a manner such that said updating does not occur.
Claim 39
Dependent Claim 31 words
The apparatus of claim 27 further comprising means for modifying said load-shed half-cycle ON time and said load-shed OFF half-cycle time to modify the amount of load-shedding during the load-shedding interval.
Claim 40
Dependent Claim 14 words
The apparatus of claim 37 wherein said modification is made at a predetermined rate.
Claim 41
Dependent Claim 52 words
The apparatus of claim 27 wherein said means for returning control to said thermostat includes means for gradually increasing said load-shed ON half-cycle time and gradually decreasing said load-shed OFF cycle time at the end of the load-shedding interval until the thermostat switches to the OFF state during an ON load-shed half-cycle.
Claim 42
Independent Claim 23 words
The apparatus of any one of claims 37-39 wherein said cycle modification is accomplished by externally generated command signals from the power supplier.
Claim 43
Dependent Claim 28 words
The apparatus of claim 39 wherein said means for retaining control is activated after a predetermined time in the absence of a command signal from the power supplier.
Claim 44
Dependent Claim 16 words
The apparatus according to claim 27 wherein said signal receiving means is a radio frequency receiver.
Claim 45
Dependent Claim 19 words
The apparatus of claim 27 wherein said timer means and said information storage means are contained in a microprocessor.
Claim 46
Dependent Claim 39 words
The apparatus of claim 27 wherein said overriding control means further comprises: electric contactor means in the power supply to the space conditioning load; and switch means for operating said contactor means in response to said load-shed control means.
Claim 47
Dependent Claim 281 words
A non-synchronizing system for power load-shedding in a central power distribution network supplying a plurality of space conditioning means comprising: separate load-shed duty cycler means connected to each of the space conditioning means participating in load-shedding, said load-shed duty cycler being connected in a manner which allows it to shut off the power supply to said space conditioning means, said load-shed duty cycler means also being connected to the thermostat control associated with the space conditioning means; signal receiving means associated with said load-shed duty cycler to receiver command control instructions from the power supplier as required for power load-shedding; load-shed cycle control means in said duty cycler, said load-shed control means including timing means for timing the natural ON and OFF cycle times of said thermostat means, information storage and retrieval means for storing and retrieving information including information supplied by said timing means related to said ON-OFF cycle times and control means for controlling the cycling of said space conditioning based on load-shed ON and OFF cycle times derived from said stored natural cycle time information; and anti-synchronization means in said load-shed control means including phasing-in means implemented at the inception of the load-shedding interval which causes the initial load-shed ON-OFF cycle to correspond to the natural half-cycle in effect at the inception of load-shedding and wherein said load-shed control means thereafter patterns ON and OFF load-shed half-cycles based on stored information derived from a sequential pair of natural half-cycles contained in said stored information wherein said ON load-shed half-cycle is a permissive ON half-cycle and said OFF load-shed half-cycle is a positive OFF half-cycle to thereby preserve the random natural diversity of the plurality of space conditioning means.
Claim 48
Dependent Claim 281 words
A non-synchronizing system for power load-shedding in a central power distribution network supplying a plurality of space conditioning means comprising: separate load-shed duty cycler means connected to each of the space conditioning means participating in load-shedding, said load-shed duty cycler being connected in a manner which allows it to shut off the power supply to said space conditioning means, said load-shed duty cycler means also being connected to the thermostat control associated with the space conditioning means; signal receiving means associated with said load-shed duty cycler to receiver command control instructions from the power supplier as required for power load-shedding; load-shed cycle control means in said duty cycler, said load-shed control means including timing means for timing the natural ON and OFF cycle times of said thermostat means, information storage and retrieval means for storing and retrieving information including information supplied by said timing means related to said ON-OFF cycle times and control means for controlling the cycling of said space conditioning based on load-shed ON and OFF cycle times derived from said stored natural cycle time information; and anti-synchronization means in said load-shed control means including phasing-in means implemented at the inception of the load-shedding interval which causes the initial load-shed ON-OFF cycle to correspond to the natural half-cycle in effect at the inception of load-shedding and wherein said load-shed control means thereafter patterns ON and OFF load-shed half-cycles based on stored information derived from a sequential pair of natural half-cycles contained in said stored information wherein said ON load-shed half-cycle is a permissive ON half-cycle and said OFF load-shed half-cycle is a positive OFF half-cycle to thereby preserve the random natural diversity of the plurality of space conditioning means.
Claim 49
Dependent Claim 53 words
A non-synchronizing system for power load-shedding of claim 45 wherein said anti-synchronization means further comprises: phasing-out means for gradually increasing the load-shed ON half-cycle time and gradually decreasing the load-shed OFF half-cycle time at the end of the load-shedding interval until the thermostat switches to an OFF state during an ON load-shed half-cycle.

References Cited (Backward Citations)

US3359551A Cited
US3834617A Cited
US3933197A Cited
US4023043A Cited
US3925680A Cited
US4001557A Cited
US4174064A Cited
US4228364A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-08-16 1986-02-15 1986-08-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-08-16 1990-02-15 1990-08-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-08-16 1994-02-15 1994-08-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag