US4314430A Expired / Lapsed US ⏱️ 0.0 years remaining

Core building system

Assignee: Individual
•
Filing: 1979-05-14
•
Granted: 1982-02-09
•
Expires: 1999-05-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An improved method of wall construction, and an improved wall construction are provided by the invention. The individual components of the wall are first set in place and then encased in concrete to form a load bearing wall. Multiple channel track units are positioned at the upper and lower edges of the wall, extending therebetween is a plurality of non-load bearing uprights. Attached to the uprights are the various wall components such as doorframes, insulation windowframes, wiring and piping conduits. Forms are then set into place and the concrete is poured, upon hardening of the concrete the load bearing wall is complete, thereby eliminating customary furring strips, inside insulation, sheetrock, and external siding, plastering, stucco, etc.

Inventors

  • 👤 Albert J. Farrington

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 12:57
CPC Classifications
E; E04; E04B; E04B1/00; E04B1/16; E04B1/163; E04B1/0023; E04B2/00; E04B2/84; E04B2/86; E04B2/8647; E04B2002/867

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 121 words
A method for the construction of a load-bearing wall comprising the steps of: (a) positioning first track means along the lower edge of where said wall is to be placed, said first track means including first and second channel means; (b) setting a plurality of upright means into said first and second channel means; (c) positioning second track means about the upper edge of where said wall is to be placed, said second track means also including first and second channel means, said plurality of upright means extending between said first and second channel means of said first and second track means; (d) positioning form means about said track means; (e) pouring concrete between said forms, and; (f) setting said concrete.
Claim 2
Independent Claim 121 words
A method for the construction of a load-bearing wall comprising the steps of: (a) positioning first track means along the lower edge of where said wall is to be placed, said first track means including first and second channel means; (b) setting a plurality of upright means into said first and second channel means; (c) positioning second track means about the upper edge of where said wall is to be placed, said second track means also including first and second channel means, said plurality of upright means extending between said first and second channel means of said first and second track means; (d) positioning form means about said track means; (e) pouring concrete between said forms, and; (f) setting said concrete.
Claim 3
Dependent Claim 34 words
The method of construction as claimed in claim 1 further including the step of connecting at least one of door frame means and window frame means to said upright means before pouring said concrete.
Claim 4
Dependent Claim 25 words
The method of construction as claimed in claim 1 further including the step of connecting conduit means to said upright means before pouring said concrete.
Claim 5
Dependent Claim 38 words
The method of construction as claimed in claim 1 wherein said upper and lower track means include third channel means and further including the step of positioning insulation means in said third channel means before pouring said concrete.
Claim 6
Dependent Claim 29 words
The method of construction as claimed in claim 1 further including the step of positioning concrete reinforcing means between said upper and lower track means before pouring said concrete.
Claim 7
Dependent Claim 13 words
The load bearing wall formed by the method as claimed in claim 1.

References Cited (Backward Citations)

US1134736A Cited
US2969619A Cited
US3394523A Cited
US3676973A Cited
US3772844A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-02-08 1985-08-10 1986-02-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-02-08 1989-08-10 1990-02-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-02-08 1993-08-10 1994-02-09 $7700.00 Window Closed / Lapsed