Abstract

Abstract The method aspect of the invention comprises stabilizing an earth structure by forming a plurality of concentric boreholes therein, and inserting, in each of the boreholes, a friction rock stabilizer. A friction rock stabilizer, so defined as to be useful in the method, comprises another aspect of the invention, the stabilizer having a plurality of concentric, tubular bodies. In this novel friction rock stabilizer, one of the tubular bodies defines an axial extension of another thereof. In addition, then, the invention further embraces the definition of a novel axial extension for a friction rock stabilizer.

Inventors

  • 👤 Clifford A. McCartney

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 13:23
CPC Classifications
E; E21; E21D; E21D21/00; E21D21/0026; E21D21/004

Claims Analysis

Total Claims: 14
Claim 1
Independent Claim 111 words
A method of stabilizing an earth structure, such as a roof or wall of a mine shaft, or tunnel, and like subterranean openings, comprising the steps of: forming a plurality of concentric boreholes, of discrete diameters in the earth structure; and inserting, in each of said boreholes, a friction rock stabilizer comprising a generally tubular body of substantially one cross-sectional configuration along substantially its full length; wherein said stabilizers inserting step comprises inserting a first friction rock stabilizer in a first of said boreholes of said plurality thereof, and then passing a second friction rock stabilizer through said first stabilizer and inserting said second stabilizer in a second of said boreholes.
Claim 2
Independent Claim 111 words
A method of stabilizing an earth structure, such as a roof or wall of a mine shaft, or tunnel, and like subterranean openings, comprising the steps of: forming a plurality of concentric boreholes, of discrete diameters in the earth structure; and inserting, in each of said boreholes, a friction rock stabilizer comprising a generally tubular body of substantially one cross-sectional configuration along substantially its full length; wherein said stabilizers inserting step comprises inserting a first friction rock stabilizer in a first of said boreholes of said plurality thereof, and then passing a second friction rock stabilizer through said first stabilizer and inserting said second stabilizer in a second of said boreholes.
Claim 3
Dependent Claim 35 words
A method, according to claim 1, wherein: said forming step comprises forming a first of said plurality of boreholes, initially, and then forming a second of said boreholes as a counterbore of said first borehole.
Claim 4
Dependent Claim 42 words
A method, according to claim 1, wherein: said forming step comprises forming a first of said plurality of boreholes, initially, to a given depth, and then forming a second of said boreholes centrally of said first borehole and beyond said given depth.
Claim 5
Independent Claim 106 words
A method of stabilizing an earth structure, such as a roof or wall of a mine shaft, or tunnel, and like subterranean openings, comprising the steps of: forming a plurality of concentric boreholes, of discrete diameters in the earth structure; and inserting, in each of said boreholes, a friction rock stabilizer comprising a generally tubular body of substantially one cross-sectional configuration along substantially its full length; wherein said stabilizers inserting step comprises inserting both first and second friction rock stabilizers in a first of said boreholes of said plurality thereof, and then inserting one of said first and second stabilizers in a second of said boreholes.
Claim 6
Independent Claim 106 words
A method of stabilizing an earth structure, such as a roof or wall of a mine shaft, or tunnel, and like subterranean openings, comprising the steps of: forming a plurality of concentric boreholes, of discrete diameters in the earth structure; and inserting, in each of said boreholes, a friction rock stabilizer comprising a generally tubular body of substantially one cross-sectional configuration along substantially its full length; wherein said stabilizers inserting step comprises inserting both first and second friction rock stabilizers in a first of said boreholes of said plurality thereof, and then inserting one of said first and second stabilizers in a second of said boreholes.
Claim 7
Dependent Claim 15 words
A method, according to claim 1, further including the step of: coupling said stabilizers together.
Claim 8
Dependent Claim 32 words
A method, according to claim 5, wherein: said coupling step is performed following insertion of one of said stabilizers, and substantially coincident with completion of insertion of a second of said stabilizers.
Claim 9
Independent Claim 100 words
A method of stabilizing an earth structure, such as a roof or wall of a mine shaft, or tunnel, and like subterranean openings, comprising the steps of: forming a plurality of concentric boreholes, of discrete diameters in the earth structure; and inserting, in each of said boreholes, a friction rock stabilizer comprising a generally tubular body of substantially one cross-sectional configuration along substantially its full length; further including the step of: fixing prominent elements on proximately adjacent surfaces of said stabilizers to cause a closure of said elements into mutually contacting engagement and a resultant coupling together of said stabilizers.
Claim 10
Independent Claim 100 words
A method of stabilizing an earth structure, such as a roof or wall of a mine shaft, or tunnel, and like subterranean openings, comprising the steps of: forming a plurality of concentric boreholes, of discrete diameters in the earth structure; and inserting, in each of said boreholes, a friction rock stabilizer comprising a generally tubular body of substantially one cross-sectional configuration along substantially its full length; further including the step of: fixing prominent elements on proximately adjacent surfaces of said stabilizers to cause a closure of said elements into mutually contacting engagement and a resultant coupling together of said stabilizers.
Claim 11
Dependent Claim 204 words
A friction rock stabilizer, for insertion in a bore in a structure such as a roof or side wall of a mine shaft, or tunnel, or other underground opening, for anchoring the structure, said stabilizer comprising a plurality of concentric, generally tubular bodies, each of said bodies being of substantially one cross-sectional configuration along substantially the full length thereof, at least one of said bodies having a maximum transverse dimension predetermined to be larger than the maximum transverse dimension of the bore, whereby insertion of said one body in such bore causes circumferential compression and deformation of said one body, the stabilizer being free of structure precluding such circumferential compression and deformation of said one body, and said one body being of material which, in response to an insertion of said stabilizer in such bore, causes said one body, to frictionally engage the wall of such bore, thereby to anchor the bored structure, substantially fully along a continuous and substantially full length of said one body, with a given, substantially uniformly distributed, anchoring force; further comprising means coupling said bodies together; and wherein said coupling means comprises prominent elements, fixed on proximately adjacent surfaces of said concentric bodies, which close into mutually contacting engagement.
Claim 12
Dependent Claim 204 words
A friction rock stabilizer, for insertion in a bore in a structure such as a roof or side wall of a mine shaft, or tunnel, or other underground opening, for anchoring the structure, said stabilizer comprising a plurality of concentric, generally tubular bodies, each of said bodies being of substantially one cross-sectional configuration along substantially the full length thereof, at least one of said bodies having a maximum transverse dimension predetermined to be larger than the maximum transverse dimension of the bore, whereby insertion of said one body in such bore causes circumferential compression and deformation of said one body, the stabilizer being free of structure precluding such circumferential compression and deformation of said one body, and said one body being of material which, in response to an insertion of said stabilizer in such bore, causes said one body, to frictionally engage the wall of such bore, thereby to anchor the bored structure, substantially fully along a continuous and substantially full length of said one body, with a given, substantially uniformly distributed, anchoring force; further comprising means coupling said bodies together; and wherein said coupling means comprises prominent elements, fixed on proximately adjacent surfaces of said concentric bodies, which close into mutually contacting engagement.
Claim 13
Dependent Claim 44 words
A friction rock stabilizer, according to claim 8, wherein: one of said elements comprises an annulus fixed on an outer surface of one of said bodies; and another of said elements comprises an annulus fixed on an inner surface of another of said bodies.
Claim 14
Dependent Claim 31 words
A friction rock stabilizer, according a claim 8, wherein: each of said elements is fixed on said surface, of its respective body, immediately adjacent to an end of said respective body.

References Cited (Backward Citations)

GB215177A Cited
SU384977A1 Cited
US3899893A Cited
US4052860A Cited
US4098087A Cited
US4126004A Cited
US4132080A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-02-01 1985-08-03 1986-02-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-02-01 1989-08-03 1990-02-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-02-01 1993-08-03 1994-02-02 $7700.00 Window Closed / Lapsed