Claims Analysis
Total Claims: 13
Claim 1
Independent Claim
182 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, employing a bladder adjacent the access wall as a form by forcing a flowable, hardenable composition therewithin, and hardening said composition to provide a support structure preventing collapse of said access wall; and E. serially repeating step D.
Claim 2
Dependent Claim
182 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, employing a bladder adjacent the access wall as a form by forcing a flowable, hardenable composition therewithin, and hardening said composition to provide a support structure preventing collapse of said access wall; and E. serially repeating step D.
Claim 3
Dependent Claim
34 words
The process as set forth in claim 1 wherein the hardenable, flowable composition is selected from the group consisting of shotcrete, quick hardening sludge, concrete compositions, foamed plastic materials, and hardenable hydraulic mine fill.
Claim 4
Dependent Claim
19 words
The process as set forth in claim 1 wherein ore is removed to form said chambers by auger mining.
Claim 5
Dependent Claim
14 words
The process as set forth in claim 1 wherein said support structure is hollow.
Claim 6
Dependent Claim
72 words
The process as set forth in claim 1 comprising the further steps of removing the bladder from the mouth of a chamber remote from the most recently formed chamber prior to step D, partially deflating and withdrawing an inwardly disposed bladder to a point in supporting relation to said access wall, and employing at least a portion of said bladder as a form to provide a support structure for said access wall.
Claim 7
Dependent Claim
30 words
The process as set forth in claim 1 wherein an inwardly disposed bladder is abandoned within the chamber to act as a plug to arrest the flow of fluids therethrough.
Claim 8
Dependent Claim
21 words
The process as set forth in claim 1 wherein the access wall is a dam behind which mine workings are backfilled.
Claim 9
Dependent Claim
189 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, removing the inwardly disposed inflatable bladder and employing the bladder adjacent the access wall as a form, forcing a flowable hardenable composition therewithin, and hardening said composition to provide a support structure preventing the collapse of said access wall; and, E. serially repeating step D.
Claim 10
Dependent Claim
189 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, removing the inwardly disposed inflatable bladder and employing the bladder adjacent the access wall as a form, forcing a flowable hardenable composition therewithin, and hardening said composition to provide a support structure preventing the collapse of said access wall; and, E. serially repeating step D.
Claim 11
Dependent Claim
35 words
The process as set forth in claim 8 wherein the inwardly disposed inflatable bladder is removed through a conduit traversing the inflated bladder adjacent the access wall so that the access wall support is maintained.
Claim 12
Dependent Claim
42 words
The process as set forth in claim 8 wherein the inwardly disposed inflatable bladder is removed by temporarily withdrawing the bladder adjacent the access wall, at least partially deflating the inwardly disposed bladder and withdrawing the inwardly disposed bladder from said chamber.
Claim 13
Dependent Claim
24 words
The process as set forth in claim 8 wherein the access wall includes both oppositely facing walls in an access tunnel in a mine.