Mining method

Assignee: Individual
•
Filing: 1978-01-11
•
Granted: 1982-01-05
•
Expires: 1998-01-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Improvements in the amount of ore receivable from a seam having an overburden and improvements in mine safety are achieved by strategically deploying inflated bladders for temporary overburden support and using certain bladders as forms for producing permanent support structures. An access wall is provided to an edge of the seam to be mined by forming a trench or tunnel; and, ore is mined by working into the access wall to produce a series of elongated, substantially parallel chambers. As each chamber is completed, its overburden is supported by inserting and inflating one or more bladders; and, caving of the access wall is prevented by installing a bladder at the mouth of the chamber. Because of the support, adjacent chambers may be quite close together, leaving only a thin rib of ore therebetween. When the work has progressed along the ore face, the inwardly disposed overburden supporting bladders in chambers remote from the newest excavation may be removed. The access wall supporting bladders are then filled, or the interior surfaces of the bladders are coated from within with a hardenable composition which is cured to provide a permanent support for the access wall and a dam to prevent and control the flow of water or noxious gases, facilitating backfilling of mined areas.

Inventors

  • 👤 Myles A. Walsh

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 06:23
CPC Classifications
E; E21; E21F; E21F15/00; E21C; E21C41/00; E21C41/16; E21D; E21D15/00; E21D15/48; E21D15/483

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 182 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, employing a bladder adjacent the access wall as a form by forcing a flowable, hardenable composition therewithin, and hardening said composition to provide a support structure preventing collapse of said access wall; and E. serially repeating step D.
Claim 2
Dependent Claim 182 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, employing a bladder adjacent the access wall as a form by forcing a flowable, hardenable composition therewithin, and hardening said composition to provide a support structure preventing collapse of said access wall; and E. serially repeating step D.
Claim 3
Dependent Claim 34 words
The process as set forth in claim 1 wherein the hardenable, flowable composition is selected from the group consisting of shotcrete, quick hardening sludge, concrete compositions, foamed plastic materials, and hardenable hydraulic mine fill.
Claim 4
Dependent Claim 19 words
The process as set forth in claim 1 wherein ore is removed to form said chambers by auger mining.
Claim 5
Dependent Claim 14 words
The process as set forth in claim 1 wherein said support structure is hollow.
Claim 6
Dependent Claim 72 words
The process as set forth in claim 1 comprising the further steps of removing the bladder from the mouth of a chamber remote from the most recently formed chamber prior to step D, partially deflating and withdrawing an inwardly disposed bladder to a point in supporting relation to said access wall, and employing at least a portion of said bladder as a form to provide a support structure for said access wall.
Claim 7
Dependent Claim 30 words
The process as set forth in claim 1 wherein an inwardly disposed bladder is abandoned within the chamber to act as a plug to arrest the flow of fluids therethrough.
Claim 8
Dependent Claim 21 words
The process as set forth in claim 1 wherein the access wall is a dam behind which mine workings are backfilled.
Claim 9
Dependent Claim 189 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, removing the inwardly disposed inflatable bladder and employing the bladder adjacent the access wall as a form, forcing a flowable hardenable composition therewithin, and hardening said composition to provide a support structure preventing the collapse of said access wall; and, E. serially repeating step D.
Claim 10
Dependent Claim 189 words
A mining method for improving the tonnage of ore recoverable from an ore seam having an overburden, said method comprising the steps of: A. providing an access wall to the seam; B. removing an elongate segment of the ore by working into the seam from the access wall to produce a chamber, supporting the overburden by introducing at least one inflatable, flexible bladder disposed inwardly within said chamber, supporting the access wall by introducing an inflatable, flexible bladder into the mouth of said chamber, and inflating the bladders; C. serially repeating step B to produce a series of supported chambers substantially parallel to each other and separated by a thin rib of ore, the inflated bladders in said chambers enabling the next successive chamber to be formed closely adjacent the previously formed chamber; D. at a chamber remote from the most recently formed chamber, removing the inwardly disposed inflatable bladder and employing the bladder adjacent the access wall as a form, forcing a flowable hardenable composition therewithin, and hardening said composition to provide a support structure preventing the collapse of said access wall; and, E. serially repeating step D.
Claim 11
Dependent Claim 35 words
The process as set forth in claim 8 wherein the inwardly disposed inflatable bladder is removed through a conduit traversing the inflated bladder adjacent the access wall so that the access wall support is maintained.
Claim 12
Dependent Claim 42 words
The process as set forth in claim 8 wherein the inwardly disposed inflatable bladder is removed by temporarily withdrawing the bladder adjacent the access wall, at least partially deflating the inwardly disposed bladder and withdrawing the inwardly disposed bladder from said chamber.
Claim 13
Dependent Claim 24 words
The process as set forth in claim 8 wherein the access wall includes both oppositely facing walls in an access tunnel in a mine.

References Cited (Backward Citations)

DE1069549B Cited
US2990166A Cited
SU381767A1 Cited
US4056939A Cited
DE2415106A1 Cited
US3980342A Cited
US4072018A Cited
US4021076A Cited
US4072015A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1985-01-04 1985-07-06 1986-01-05 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1989-01-04 1989-07-06 1990-01-05 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1993-01-04 1993-07-06 1994-01-05 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag