Abstract

Abstract A process and apparatus for operating a turbocompressor having an output at an actual value of flow and pressure and a blow-off valve for regulating the output to prevent surging of the output above a surge limit and to prevent a reduction of the output below a minimum value, with a comparing unit for measuring the actual value, and a controller unit for controlling the blow-off valve in accordance with the output of the comparing unit comprising, forming a first difference value between the theoretical value and the actual value, forming a delayed value from the difference value and thereafter forming a second difference value between the delayed value and the first difference value to control the blow-off valve. The apparatus for effecting the process comprises summing units for forming the various difference values, a delay unit for delaying the first difference value and, in one embodiment, a limiter unit for limiting the second difference value which is thereafter added to the theoretical value before the resulting value is applied to the controller unit for controlling the blow-off valve.

Inventors

  • 👤 Wilfried Blotenberg

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 22:22
CPC Classifications
F; F04; F04D; F04D27/00; F04D27/02; F04D27/0207

Claims Analysis

Total Claims: 12
Claim 1
Independent Claim 132 words
A process for the operation of a turbo-compressor having an output at an actual value of an operating parameter, and a blow-off valve for regulating the output to prevent surging of the output above a surge limit and to prevent a reduction of the output below a minimum value, with comparing means for measuring the actual value and comparing to a permissible theoretical value for the parameter, and controlling means for controlling the blow-off valve in accordance with an output from the comparing means, comprising: forming a first difference value between the theoretical value and the actual value, forming a delayed value from the difference value, forming a second difference value between the delayed value and the first difference value, and controlling the blow-off valve in accordance with the second difference valve.
Claim 2
Dependent Claim 132 words
A process for the operation of a turbo-compressor having an output at an actual value of an operating parameter, and a blow-off valve for regulating the output to prevent surging of the output above a surge limit and to prevent a reduction of the output below a minimum value, with comparing means for measuring the actual value and comparing to a permissible theoretical value for the parameter, and controlling means for controlling the blow-off valve in accordance with an output from the comparing means, comprising: forming a first difference value between the theoretical value and the actual value, forming a delayed value from the difference value, forming a second difference value between the delayed value and the first difference value, and controlling the blow-off valve in accordance with the second difference valve.
Claim 3
Dependent Claim 25 words
A process according to claim 1, further including multiplying the first difference value by a factor of 2 before the second difference value is formed.
Claim 4
Dependent Claim 46 words
A process according to claim 2, further including providing a manual control value, providing a maximum selector unit for receiving the manual control value and the second difference value and supplying the maximum of these two values to the controller means for controlling the blow-off valve.
Claim 5
Dependent Claim 18 words
A process according to claim 3, further including providing the first difference value to the maximum selector unit.
Claim 6
Dependent Claim 44 words
A process according to claim 1, further including a limiter for receiving the second difference value and producing a limited second difference value, and adding the limited second difference value to the theoretical value for producing a third value for controlling the blow-off valve.
Claim 7
Dependent Claim 115 words
A process for the operation of a turbo-compressor with a throughput, in which a signal derived from the throughput is continuously measured, while for the prevention of surging, before a surge limit is reached, on reaching a blow-off line, it is provided that the turbo-compressor throughput does not fall below a minimum value dependent upon the discharge ratio, characterized in that outside the controller the difference is formed between a theoretical value and an actual value of the throughput, the difference is supplied, once directly and secondly delayed by way of a delay member, to a subtracting station and then added to the theoretical value to form a control value for controlling the blow-off line.
Claim 8
Dependent Claim 115 words
A process for the operation of a turbo-compressor with a throughput, in which a signal derived from the throughput is continuously measured, while for the prevention of surging, before a surge limit is reached, on reaching a blow-off line, it is provided that the turbo-compressor throughput does not fall below a minimum value dependent upon the discharge ratio, characterized in that outside the controller the difference is formed between a theoretical value and an actual value of the throughput, the difference is supplied, once directly and secondly delayed by way of a delay member, to a subtracting station and then added to the theoretical value to form a control value for controlling the blow-off line.
Claim 9
Dependent Claim 22 words
A process according to claim 6, characterized in that the signal is supplied to a limiter before addition to the theoretical value.
Claim 10
Dependent Claim 57 words
A process according to claim 6, characterized in that the control difference is formed from a theoretical value and an actual value outside the controller, supplied, once multiplied by the factor of two and secondly delayed by way of the delay member, to a subtracting station and then imposed on a controller for controlling the blowoff value.
Claim 11
Independent Claim 153 words
An apparatus for the operation of a turbo-compressor having an output at an actual value of an operating parameter, a blow-off line for regulating the output to prevent surging of the output above a surge value and to prevent a reduction of the output below a minimum value, with comparing means for measuring the actual value and comparing it with a permissible theoretical value for the parameter, and controller means for controlling the blow-off line in accordance with the output of the comparing means, comprising: first difference means for producing a first difference value from the difference between the theoretical value and the actual value, delay means connected to the first difference means for delaying the first difference value, second difference means connected to the delay means and to the first difference means for producing a second difference value, the second difference means connected to the controller means for controlling the blow-off line.
Claim 12
Independent Claim 153 words
An apparatus for the operation of a turbo-compressor having an output at an actual value of an operating parameter, a blow-off line for regulating the output to prevent surging of the output above a surge value and to prevent a reduction of the output below a minimum value, with comparing means for measuring the actual value and comparing it with a permissible theoretical value for the parameter, and controller means for controlling the blow-off line in accordance with the output of the comparing means, comprising: first difference means for producing a first difference value from the difference between the theoretical value and the actual value, delay means connected to the first difference means for delaying the first difference value, second difference means connected to the delay means and to the first difference means for producing a second difference value, the second difference means connected to the controller means for controlling the blow-off line.

References Cited (Backward Citations)

US3737252A Cited
US3809490A Cited
US4139328A Cited
US4164035A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-11-02 1985-05-04 1985-11-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-11-02 1989-05-04 1989-11-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-11-02 1993-05-04 1993-11-03 $7700.00 Window Closed / Lapsed