Patent US4290800A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4290800A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for feeding iron sponge into an electric arc furnace

Assignee: Hamburger Stahlwerke GmbH
•
Filing: 1979-09-17
•
Granted: 1981-09-22
•
Expires: 1999-09-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Iron sponge, containing at least 0.5% carbon, is preheated with an oxidizing gas as the gas flows in a direction traverse to the direction of the sponge, without combustion of the iron sponge.

Inventors

  • 👤 Siegfried Sensis
  • 👤 Joachim Schwerdtfeger
  • 👤 Klaus Walden
  • 👤 Dieter Ameling

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 17:49
CPC Classifications
C; C21; C21C; C21C5/00; C21C5/56; C21C5/562; C21C5/565; C21C5/52; C21C5/527; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 140 words
A method of preheating carbon containing iron sponge, said method characterized by the non-combustion of said iron sponge, the method comprising steps of: providing carbon bearing iron sponge which contains at least 0.5% carbon; moving the iron sponge into a melting crucible; providing a stream of oxidizing hot gas, the hot gas having a temperature of at least 1200° C. and having a flow rate of at least 1 m/s as measured at 20° C. and 760 Torr; flowing the hot gas through the iron sponge in a direction transverse to the direction of movement of the iron sponge and in direct contact with essentially all of the iron sponge; effecting said direct contact between the hot gas and the iron sponge under conditions such that carbon present in the iron sponge is ignited and oxidized by the hot gas.
Claim 2
Independent Claim 140 words
A method of preheating carbon containing iron sponge, said method characterized by the non-combustion of said iron sponge, the method comprising steps of: providing carbon bearing iron sponge which contains at least 0.5% carbon; moving the iron sponge into a melting crucible; providing a stream of oxidizing hot gas, the hot gas having a temperature of at least 1200° C. and having a flow rate of at least 1 m/s as measured at 20° C. and 760 Torr; flowing the hot gas through the iron sponge in a direction transverse to the direction of movement of the iron sponge and in direct contact with essentially all of the iron sponge; effecting said direct contact between the hot gas and the iron sponge under conditions such that carbon present in the iron sponge is ignited and oxidized by the hot gas.
Claim 3
Dependent Claim 18 words
A process according to claim 1 characterised in that a vibrating conveyor is used for moving the fill.
Claim 4
Dependent Claim 20 words
A process according to claim 1 or 2 characterised in that the iron sponge contains at least 1.5% of carbon.
Claim 5
Dependent Claim 29 words
A process according to claim 1 or 2 characterised in that the hot gas upon direct contact with the iron sponge has at least a temperature of 1200° C.
Claim 6
Dependent Claim 41 words
A process according to claim 1 or 2 characterised in that a high-speed flow of hot gas impinges on the iron sponge, the flow speed of the hot gas being at least 1 m/s under normal conditions (20° C., 760 Torr).
Claim 7
Dependent Claim 35 words
A process according to claim 1 or 2 characterised in that the height of the layer of the iron sponge which is moved in the form of a loose fill is kept below 25 cm.
Claim 8
Dependent Claim 34 words
A process according to claim 1 or 2 characterised in that the residence time of the iron sponge in the region of action of the hot gas is kept at less than 100 s.
Claim 9
Dependent Claim 34 words
A process according to claim 1 or 2 characterised in that the hot gas is produced by the combustion of carbon-bearing fuels and the hot gas throughput is at least 500 Nm 3 /t.
Claim 10
Dependent Claim 27 words
A process according to claim 1 or 2 characterised in that the hot waste gases of the electric arc furnace are also used for producing hot gas.
Claim 11
Dependent Claim 24 words
A process according to claim 2 characterized in that, before being fed on to the vibrating conveyor, the iron sponge is saturated with oil.

References Cited (Backward Citations)

US2805930A Cited
US3276859A Cited
US3163520A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-09-21 1985-03-23 1985-09-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-09-21 1989-03-23 1989-09-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-09-21 1993-03-23 1993-09-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag