Process for feeding iron sponge into an electric arc furnace
Assignee: Hamburger Stahlwerke GmbH
•
Filing: 1979-09-17
•
Granted: 1981-09-22
•
Expires: 1999-09-17
Abstract
Abstract Iron sponge, containing at least 0.5% carbon, is preheated with an oxidizing gas as the gas flows in a direction traverse to the direction of the sponge, without combustion of the iron sponge.
Inventors
- 👤 Siegfried Sensis
- 👤 Joachim Schwerdtfeger
- 👤 Klaus Walden
- 👤 Dieter Ameling
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 12:38
CPC Classifications
C; C21; C21C; C21C5/00; C21C5/56; C21C5/562; C21C5/565; C21C5/52; C21C5/527; Y; Y02; Y02P; Y02P10/00; Y02P10/20
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
140 words
A method of preheating carbon containing iron sponge, said method characterized by the non-combustion of said iron sponge, the method comprising steps of: providing carbon bearing iron sponge which contains at least 0.5% carbon; moving the iron sponge into a melting crucible; providing a stream of oxidizing hot gas, the hot gas having a temperature of at least 1200° C. and having a flow rate of at least 1 m/s as measured at 20° C. and 760 Torr; flowing the hot gas through the iron sponge in a direction transverse to the direction of movement of the iron sponge and in direct contact with essentially all of the iron sponge; effecting said direct contact between the hot gas and the iron sponge under conditions such that carbon present in the iron sponge is ignited and oxidized by the hot gas.
Claim 2
Independent Claim
140 words
A method of preheating carbon containing iron sponge, said method characterized by the non-combustion of said iron sponge, the method comprising steps of: providing carbon bearing iron sponge which contains at least 0.5% carbon; moving the iron sponge into a melting crucible; providing a stream of oxidizing hot gas, the hot gas having a temperature of at least 1200° C. and having a flow rate of at least 1 m/s as measured at 20° C. and 760 Torr; flowing the hot gas through the iron sponge in a direction transverse to the direction of movement of the iron sponge and in direct contact with essentially all of the iron sponge; effecting said direct contact between the hot gas and the iron sponge under conditions such that carbon present in the iron sponge is ignited and oxidized by the hot gas.
Claim 3
Dependent Claim
18 words
A process according to claim 1 characterised in that a vibrating conveyor is used for moving the fill.
Claim 4
Dependent Claim
20 words
A process according to claim 1 or 2 characterised in that the iron sponge contains at least 1.5% of carbon.
Claim 5
Dependent Claim
29 words
A process according to claim 1 or 2 characterised in that the hot gas upon direct contact with the iron sponge has at least a temperature of 1200° C.
Claim 6
Dependent Claim
41 words
A process according to claim 1 or 2 characterised in that a high-speed flow of hot gas impinges on the iron sponge, the flow speed of the hot gas being at least 1 m/s under normal conditions (20° C., 760 Torr).
Claim 7
Dependent Claim
35 words
A process according to claim 1 or 2 characterised in that the height of the layer of the iron sponge which is moved in the form of a loose fill is kept below 25 cm.
Claim 8
Dependent Claim
34 words
A process according to claim 1 or 2 characterised in that the residence time of the iron sponge in the region of action of the hot gas is kept at less than 100 s.
Claim 9
Dependent Claim
34 words
A process according to claim 1 or 2 characterised in that the hot gas is produced by the combustion of carbon-bearing fuels and the hot gas throughput is at least 500 Nm 3 /t.
Claim 10
Dependent Claim
27 words
A process according to claim 1 or 2 characterised in that the hot waste gases of the electric arc furnace are also used for producing hot gas.
Claim 11
Dependent Claim
24 words
A process according to claim 2 characterized in that, before being fed on to the vibrating conveyor, the iron sponge is saturated with oil.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-09-21 | 1985-03-23 | 1985-09-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-09-21 | 1989-03-23 | 1989-09-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-09-21 | 1993-03-23 | 1993-09-22 | $7700.00 | Window Closed / Lapsed |