US4290651A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Surface mining method
Assignee: Indresco Inc
•
Filing: 1979-04-03
•
Granted: 1981-09-22
•
Expires: 1999-04-03
Abstract
Abstract The invention concerns a method of surface mining along an elongated pit using a cross-pit conveyor for transferring selected excavated material, such as topsoil, directly across the pit while using a separate overburden excavator to transfer the remaining overburden. The method uses a cross-pit transporter which is supported solely on the working bank, includes a cantilevered conveyor which extends completely across the pit, and is slewable so it can periodically swing to a non-interfering position when passing the other excavator. The method allows the selective replacement of the different overburden materials in accordance with modern reclamation practice.
Inventors
- 👤 Thomas I. Files
- 👤 Donald H. Beutner
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 02:02
CPC Classifications
E; E21; E21C; E21C47/00; E21C47/02; E21C47/04; E21C41/00; E21C41/26; E21C41/32
Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
174 words
A method of surface mining along an elongated pit exposing a strip of the mineral seam between two opposed banks, using a cross-pit transporter having a conveying means extending completely across the pit and an overburden excavator moveable along the working bank of the pit within the normal working path of the cross-pit transporter comprising the steps of: a. progressively excavating the topsoil layer along the working bank of the pit; b. separately and progressively excavating the remaining overburden along said working bank using the overburden excavator and transferring the excavated overburden material and depositing it in spoils piles along the opposite bank of the pit; c. separately transporting the topsoil directly across and over the pit using the cross-pit transporter and depositing such topsoil selectively with respect to said overburden material on the opposite bank while pivotably supporting said conveying means solely from one bank, whereby said cross-pit conveying means is occasionally pivoted to a non-interfering position to permit passing of said overburden excavator to change the relative positions of the two machines.
Claim 2
Independent Claim
174 words
A method of surface mining along an elongated pit exposing a strip of the mineral seam between two opposed banks, using a cross-pit transporter having a conveying means extending completely across the pit and an overburden excavator moveable along the working bank of the pit within the normal working path of the cross-pit transporter comprising the steps of: a. progressively excavating the topsoil layer along the working bank of the pit; b. separately and progressively excavating the remaining overburden along said working bank using the overburden excavator and transferring the excavated overburden material and depositing it in spoils piles along the opposite bank of the pit; c. separately transporting the topsoil directly across and over the pit using the cross-pit transporter and depositing such topsoil selectively with respect to said overburden material on the opposite bank while pivotably supporting said conveying means solely from one bank, whereby said cross-pit conveying means is occasionally pivoted to a non-interfering position to permit passing of said overburden excavator to change the relative positions of the two machines.
Claim 3
Dependent Claim
37 words
A method of surface mining as recited in claim 1 further including swinging the cross-pit conveyor about its sole support to a position generally perpendicular to its normal working position to permit passing of said overburden excavator.
Claim 4
Independent Claim
188 words
A method of surface mining along an elongated pit which exposes a strip of the mineral seam between a working bank and a spoils bank, using a cross-pit material transporter pivotably supported solely on the working bank and having a conveying means extending completely across the pit and an overburden excavator movable along said working bank of the pit, comprising the steps of: a. progressively excavating an upper layer of overburden along the working bank, and transporting the material from said upper layer directly across and over the pit and depositing it on the spoils bank using the material transporter; b. concurrently, separately and progressively excavating the remaining overburden along said working bank using the overburden excavator and transferring the excavated remaining overburden to the spoils bank; c. continuing steps (a) and (b) moving in one direction along the pit; d. upon reaching the end of the pit, pivoting the cross-pit transporter to a non-interfering position to permit passing of said overburden excavator to change the relative working positions of the two machines; and e. repeating steps (a) and (b) moving in the opposite direction along the pit.
Claim 5
Independent Claim
188 words
A method of surface mining along an elongated pit which exposes a strip of the mineral seam between a working bank and a spoils bank, using a cross-pit material transporter pivotably supported solely on the working bank and having a conveying means extending completely across the pit and an overburden excavator movable along said working bank of the pit, comprising the steps of: a. progressively excavating an upper layer of overburden along the working bank, and transporting the material from said upper layer directly across and over the pit and depositing it on the spoils bank using the material transporter; b. concurrently, separately and progressively excavating the remaining overburden along said working bank using the overburden excavator and transferring the excavated remaining overburden to the spoils bank; c. continuing steps (a) and (b) moving in one direction along the pit; d. upon reaching the end of the pit, pivoting the cross-pit transporter to a non-interfering position to permit passing of said overburden excavator to change the relative working positions of the two machines; and e. repeating steps (a) and (b) moving in the opposite direction along the pit.
Claim 6
Dependent Claim
29 words
A method of surface mining as recited in claim 3 wherein step (a) comprises excavating topsoil material, and transporting and selectively depositing said topsoil material using the material transporter.
Claim 7
Dependent Claim
35 words
A method of surface mining as recited in claim 3, wherein step (d) comprises swinging the cross-pit transporter generally horizontally to a position substantially perpendicular to its normal operating position while passing said overburden excavator.
References Cited (Backward Citations)
SU162081A1
Cited
US591047A
Cited
US779043A
Cited
US1872076A
Cited
DE1221590B
Cited
US4133581A
Cited
US4150853A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-09-21 | 1985-03-23 | 1985-09-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-09-21 | 1989-03-23 | 1989-09-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-09-21 | 1993-03-23 | 1993-09-22 | $7700.00 | Window Closed / Lapsed |