Method of strip mining
Assignee: Individual
•
Filing: 1978-03-02
•
Granted: 1979-04-24
•
Expires: 1998-03-02
Abstract
Abstract A strip mining technique wherein an active mining area is continuously moved across a mining ground. In one form of the invention, overburden is removed from a leading end of the active mining area and conveyed by a conveyor system located on a highwall of the mining area to a following end of that mining area. The conveyed overburden is dumped adjacent the active mining area following end to form a spoil bank which is landscaped and reclaimed. Another form of the invention includes a conveyor system located on the main bench.
Inventors
- 👤 Charles M. McCoy
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 06:08
CPC Classifications
E; E21; E21C; E21C41/00; E21C41/26; E21C41/32
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
387 words
A method of strip mining comprising the steps of: providing an elongate active mining area in a mining ground, said mining area having a longitudinal axis with leading and following ends located at opposite ends of said longitudinal axis, and a highwall intersecting said ends and spaced apart from said longitudinal axis, said highwall being essentially parallel with said longitudinal axis; defining a main bench in said active mining area, said main bench intersecting said mining area ends and said highwall; locating an overburden conveyor system on said main bench to be elevated above said main bench, said conveyor system being positioned high enough above said main bench so that machinery on said main bench can pass beneath said conveyor system, said conveyor system being essentially parallel with said mining area longitudinal axis; continuously removing overburden from said mining ground adjacent said leading end; continuously moving said removed overburden onto said elevated overburden conveyor system; continuously moving said removed overburden along said elevated conveyor system toward said following end, said overburden conveyor system being located above said main bench, thereby keeping said removed overburden out of the way of machines located on said main bench; elevating that removed overburden in said conveyor system which is located adjacent said active mining area following end from said conveyor; moving said overburden off of said elevated conveyor system adjacent said following end, so that said active mining area is continuously moved across the mining ground; covering the mining area behind said following end by spilling said removed overburden into a spoil bank located immediately behind said following end; shaping said spoil bank to match the contour of the mining ground adjacent said active mining area; continuously removing coal from said mining area while said overburden is moving on said conveyor system from adjacent said leading end to adjacent said following end; moving said conveyor system along said mining area longitudinal axis; said active mining area and said overburden removal conveyor system being moved in the direction of said mining area longitudinal axis across ground between the extents of a lease; transporting said removed coal away from said mining area; and continuously shaping said spoil bank whereby the contour of the land is continuously restored behind the moving active mining area as the active mining area moves across the mining ground.
Claim 2
Independent Claim
387 words
A method of strip mining comprising the steps of: providing an elongate active mining area in a mining ground, said mining area having a longitudinal axis with leading and following ends located at opposite ends of said longitudinal axis, and a highwall intersecting said ends and spaced apart from said longitudinal axis, said highwall being essentially parallel with said longitudinal axis; defining a main bench in said active mining area, said main bench intersecting said mining area ends and said highwall; locating an overburden conveyor system on said main bench to be elevated above said main bench, said conveyor system being positioned high enough above said main bench so that machinery on said main bench can pass beneath said conveyor system, said conveyor system being essentially parallel with said mining area longitudinal axis; continuously removing overburden from said mining ground adjacent said leading end; continuously moving said removed overburden onto said elevated overburden conveyor system; continuously moving said removed overburden along said elevated conveyor system toward said following end, said overburden conveyor system being located above said main bench, thereby keeping said removed overburden out of the way of machines located on said main bench; elevating that removed overburden in said conveyor system which is located adjacent said active mining area following end from said conveyor; moving said overburden off of said elevated conveyor system adjacent said following end, so that said active mining area is continuously moved across the mining ground; covering the mining area behind said following end by spilling said removed overburden into a spoil bank located immediately behind said following end; shaping said spoil bank to match the contour of the mining ground adjacent said active mining area; continuously removing coal from said mining area while said overburden is moving on said conveyor system from adjacent said leading end to adjacent said following end; moving said conveyor system along said mining area longitudinal axis; said active mining area and said overburden removal conveyor system being moved in the direction of said mining area longitudinal axis across ground between the extents of a lease; transporting said removed coal away from said mining area; and continuously shaping said spoil bank whereby the contour of the land is continuously restored behind the moving active mining area as the active mining area moves across the mining ground.
Claim 3
Dependent Claim
39 words
The method of strip mining defined in claim 1, wherein the step of locating an overburden conveyor system on said main bench includes a step of orienting said elevated conveyor system to accommodate surface curvature in said main bench.
Claim 4
Dependent Claim
24 words
The method of strip mining defined in claim 1, wherein the step of removing coal includes a step of removing coal from said highwall.
Claim 5
Dependent Claim
29 words
The method of strip mining defined in claim 3, wherein the step of removing coal further includes the use of a coal auger which moves coal onto a truck.
Claim 6
Dependent Claim
23 words
The method of strip mining defined in claim 1, further including a step of defining an access road to said active mining area.
Claim 7
Dependent Claim
64 words
The method of strip mining defined in claim 1, wherein the step of moving overburden onto said overburden conveyor system includes a step of moving said overburden onto a feeder chute and then onto a loading conveyor which is upwardly inclined and extends from said feeder chute to said overhead conveyor system to move overburden from said feeder chute to said elevated conveyor system.
Claim 8
Dependent Claim
30 words
The method of strip mining defined in claim 6, further including a step of elevating said loading conveyor to accommodate varying heights between said elevated conveyor and said main bench.
Claim 9
Dependent Claim
23 words
The method of strip mining defined in claim 6, further including a step of moving said overburden onto an upwardly inclined unloading conveyor.
Claim 10
Dependent Claim
47 words
The method of strip mining defined in claim 8, further including a step of elevating said unloading conveyor to accommodate various highwall heights, said overburden being unloaded adjacent the top of said highwall so that the mining area adjacent said following end is completely covered with overburden.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-04-23 | 1982-10-23 | 1983-04-24 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-04-23 | 1986-10-23 | 1987-04-24 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-04-23 | 1990-10-23 | 1991-04-24 | $7700.00 | Window Closed / Lapsed |