Patent US4288241A successfully refreshed from Google Patents.
US4288241A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for composting sludge
Assignee: Individual
•
Filing: 1979-07-26
•
Granted: 1981-09-08
•
Expires: 1999-07-26
Abstract
Abstract Sludge is composted by arranging the sludge in a pile over a conduit and air is forced into the pile in spaced time intervals and air is drawn from the pile into the conduit in alternate time intervals. The perforated conduits are adapted to be placed under and extend the length of two windrow compost piles. A reversible blower is connected to blow air to and withdraw air from each of the conduits. The blower is timed and controlled to blow air from a first pile through the conduits and into a second pile in spaced time intervals and in alternate time intervals to withdraw air from the second pile through the conduits and into the first pile.
Inventors
- 👤 Gedaliahu Shelef
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-07 10:32
CPC Classifications
C; C05; C05F; C05F7/00; C05F17/00; C05F17/40; C05F17/90; C05F17/964; C05F17/971; C05F17/979; Y; Y02; Y02A; Y02A40/00; Y02A40/10; Y02A40/20; Y02P; Y02P20/00; Y02P20/141; Y02P20/145; Y02W; Y02W30/00; Y02W30/40
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
88 words
A method of composting sludge comprising arranging the sludge into first and second windrows extending lengthwise over first and second elongated, perforated conduits, respectively, drawing air from said first windrow into said first perforated conduit and forcing the air drawn from said first windrow into said second windrow through said second conduit in spaced time intervals and in alternate intervals drawing the air from the second windrow into the second conduit and forcing the air drawn from said second windrow into said first windrow through said first conduit.
Claim 2
Independent Claim
88 words
A method of composting sludge comprising arranging the sludge into first and second windrows extending lengthwise over first and second elongated, perforated conduits, respectively, drawing air from said first windrow into said first perforated conduit and forcing the air drawn from said first windrow into said second windrow through said second conduit in spaced time intervals and in alternate intervals drawing the air from the second windrow into the second conduit and forcing the air drawn from said second windrow into said first windrow through said first conduit.
Claim 3
Dependent Claim
48 words
A method of composting sludge as recited in claim 6, further comprising initially constituting said windrow to contain 45 to 70 percent moisture and adding wet sludge to said windrow as said windrow is dried to maintain the moisture content in the range of 45 to 70 percent.
References Cited (Backward Citations)
CA670800A
Cited
US2798800A
Cited
US3314765A
Cited
US3579320A
Cited
US3761237A
Cited
DE2323565A1
Cited
DE2325199A1
Cited
US4050917A
Cited
DE2508321A1
Cited
DE2520640A1
Cited
DE2744026A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-09-07 | 1985-03-09 | 1985-09-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-09-07 | 1989-03-09 | 1989-09-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-09-07 | 1993-03-09 | 1993-09-08 | $7700.00 | Window Closed / Lapsed |