Patent US4798521A successfully refreshed from Google Patents.
Patent US4284501A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4284501A Expired / Lapsed US ⏱️ 0.0 years remaining

Control apparatus for purifying acumulated condensate

Assignee: Kraftwerk Union AG
•
Filing: 1980-08-28
•
Granted: 1981-08-18
•
Expires: 2000-08-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Control apparatus for the purification of collected condensate, including condensers, at least two collecting chambers having open tops and at least two collecting chambers having covered tops for the condensers, a feed line having connections to the covered collecting chambers and connections for receiving run-off from the open collecting chambers, a first set of shut-off valves disposed in the feed line connections to the open collecting chambers, a main condensate pump disposed in the feed line, a purification line having connections for receiving run-off from the open collecting chambers and leading to at least one covered collecting chamber, a second set of shut-off valves disposed in the purification line connections to the open collecting chambers, a purification pump disposed in the purification line, a filter arrangement disposed in the purification line, a device for measuring conductivity of condensate in at least one of the open collecting chambers and for maintaining one of the first and second sets of shut-off valves in an open position while the other of the sets is in a closed position depending on the measured conductivity, a device for measuring condensate level in the open collecting chambers, and a maximum selection device connected to the condensate level measuring means for adjusting flow rate through the purification line depending on condensate level in the open collection chambers.

Inventors

  • 👤 Friedrich Schon

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 22:32
CPC Classifications
B; B01; B01D; B01D5/00; B01D5/0033; B01D5/0051; B01D5/0036; B01D5/0078; B01D5/009; F; F28; F28B; F28B11/00

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 217 words
Control apparatus for the purification of collected condensate, comprising condensers, at least two collecting chambers having open tops and at least two collecting chambers having covered tops for said condensers, a feed line having connections to said covered collecting chambers and connections for receiving run-off from said open collecting chambers, a first set of shut-off valves disposed in said feed line connections to said open collecting chambers, a main condensate pump disposed in said feed line, a purification line having connections for receiving run-off from said open collecting chambers and leading to at least one covered collecting chamber, a second set of shut-off valves disposed in said purification line connections to said open collecting chambers, a purification pump disposed in said purification line, a filter arrangement disposed in said purification line, means for measuring conductivity of condensate in at least one of said open collecting chambers and for maintaining one of said first and second sets of shut-off valves in an open position while the other of said sets is in a closed position depending on the measured conductivity, means for measuring condensate level in said open collecting chambers, and maximum selection means connected to said condensate level measuring means for adjusting flow rate through said purification line depending on condensate level in said open collection chambers.
Claim 2
Dependent Claim 217 words
Control apparatus for the purification of collected condensate, comprising condensers, at least two collecting chambers having open tops and at least two collecting chambers having covered tops for said condensers, a feed line having connections to said covered collecting chambers and connections for receiving run-off from said open collecting chambers, a first set of shut-off valves disposed in said feed line connections to said open collecting chambers, a main condensate pump disposed in said feed line, a purification line having connections for receiving run-off from said open collecting chambers and leading to at least one covered collecting chamber, a second set of shut-off valves disposed in said purification line connections to said open collecting chambers, a purification pump disposed in said purification line, a filter arrangement disposed in said purification line, means for measuring conductivity of condensate in at least one of said open collecting chambers and for maintaining one of said first and second sets of shut-off valves in an open position while the other of said sets is in a closed position depending on the measured conductivity, means for measuring condensate level in said open collecting chambers, and maximum selection means connected to said condensate level measuring means for adjusting flow rate through said purification line depending on condensate level in said open collection chambers.
Claim 3
Dependent Claim 61 words
Control apparatus according to claim 1, including a control valve connected in series with said main condensate pump in said feed line, other means for measuring condensate level in said covered collecting chambers, and other maximum selection means for adjusting said control valve in dependence on said other condensate level measuring means for controlling a maximum water level in said condensers.

References Cited (Backward Citations)

US4163716A Cited
DE2445665A1 Cited
US3965005A Cited
US4130481A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-08-17 1985-02-16 1985-08-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-08-17 1989-02-16 1989-08-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-08-17 1993-02-16 1993-08-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag