US4279542A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Subsea well flow lines tie-in using conductors
Assignee: BP Corp North America Inc
•
Filing: 1979-12-17
•
Granted: 1981-07-21
•
Expires: 1999-12-17
Abstract
Abstract This concerns a method of connecting a subsea flowline to facilities on top of an offshore platform which is supported above a body of water and which has a plurality of conductors extending from above the water to within the sea bottom. One of the conductors is cut just above the mud line and raised to leave a gap between the lower end of the upper portion of the conductor and the conductor stub which remains firmly anchored in the sea bottom. The flowline is pulled to a position just adjacent said conductor stub. A production riser is lowered through the upper portion of the conductor and then the lower end of the production riser is connected to the pulled end of the flowline.
Inventors
- 👤 Harry R. Lewis, Jr.
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 14:49
CPC Classifications
F; F16; F16L; F16L1/00; F16L1/26; E; E21; E21B; E21B43/00; E21B43/01; E21B43/0107; E21B43/013; E21B43/0135; E21B43/017
Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
129 words
A method of connecting a subsea flowline to facilities on an offshore platform supported above a body of water by piles extending into the sea bottom, said platform having a plurality of conductors through which wells may be drilled from the platform and extend from the sea floor to above the surface of said water which comprises: cutting said conductor in two near the sea bottom so as to have an upper portion and a conductor stub, raising said upper portion of said conductor to form a gap between the upper portion and the conductor stub, pulling said flowline to the vicinity of said conductor stub, running a production riser through said upper portion of said conductor, and connecting said flowline to the lower end of said production riser.
Claim 2
Independent Claim
129 words
A method of connecting a subsea flowline to facilities on an offshore platform supported above a body of water by piles extending into the sea bottom, said platform having a plurality of conductors through which wells may be drilled from the platform and extend from the sea floor to above the surface of said water which comprises: cutting said conductor in two near the sea bottom so as to have an upper portion and a conductor stub, raising said upper portion of said conductor to form a gap between the upper portion and the conductor stub, pulling said flowline to the vicinity of said conductor stub, running a production riser through said upper portion of said conductor, and connecting said flowline to the lower end of said production riser.
Claim 3
Dependent Claim
85 words
A method as defined in claim 1 in which the step of connecting said flowline to the lower end of said production riser includes anchoring a flowline elbow assembly in said conductor stub, said flowline elbow assembly having at least one passage therethrough with one end opening to the vertical and the other laterally in the direction of said flowline, and connecting the lateral opening of said flowline elbow assembly to said flowline and the vertical opening to said lower end of said production riser.
Claim 4
Dependent Claim
68 words
A method as defined in claim 1 in which the step of pulling the flowline includes: lowering a sheave block assembly into said conductor stub, said sheave block assembly having a sheave, upper sheave height control dogs and lower anchoring dogs; lowering said sheave block assembly into said conductor stub until the movement is stopped by said upper sheave height dogs and then actuating said lower anchoring dogs.
Claim 5
Dependent Claim
51 words
A method as defined in claim 2 in which said step of pulling said flowline includes fixing a flowline alignment template to said conductor stub, said template having guides for said flowline so that when said flowline is pulled through said guides, the pulled end of the flowline is properly aligned.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-07-20 | 1985-01-19 | 1985-07-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-07-20 | 1989-01-19 | 1989-07-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-07-20 | 1993-01-19 | 1993-07-21 | $7700.00 | Window Closed / Lapsed |