Patent US4273187A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4273187A Expired / Lapsed US ⏱️ 0.0 years remaining

Petroleum recovery chemical retention prediction technique

Assignee: Texaco Inc
•
Filing: 1979-07-30
•
Granted: 1981-06-16
•
Expires: 1999-07-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The amount of a petroleum recovery chemical retained within a subterranean reservoir is predicted by first gathering data from at least one injection-soak-production cycle in a single well wherein the produced fluids are monitored for both the chemical concentration in the produced fluid as well as the concentration of a nonabsorbing tracer and, second, utilizing this data in a chemical flood mathematical model to simulate at least one repetition of the injection-soak-production cycle. The simulated cycles are repeated until the simulated produced fluid concentration of the chemical is virtually the same as the actual produced fluid concentration of the nonabsorbed tracer. The amount of the chemical retained per unit of reservoir volume is then determined by conventional techniques.

Inventors

  • 👤 Abdus Satter
  • 👤 Richard H. Widmyer
  • 👤 Yick M. Shum
  • 👤 Curtis E. Howard

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 23:15
CPC Classifications
G; G01; G01N; G01N33/00; G01N33/26; G01N33/28; G01N33/2823; E; E21; E21B; E21B49/00; E21B47/00; E21B47/10; E21B47/11

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 314 words
A method for determining the amount of a chemical that is retained within a subterranean reservoir undergoing a chemical flooding operation comprising: (a) conducting a first injection-soak-production cycle in a single well which penetrates and communicates with a portion of the reservoir with a volume of a fluid which comprises the retained chemical and a non-retained tracer material; (b) obtaining from a produced fluids concentration profile of the tracer the reservoir volume contacted and a dispersion parameter describing the dispersion effects for a non-retained material within the reservoir; (c) obtaining retention parameters for the retained chemical by history-matching the actual produced fluids concentration profile of the retained chemical with a simulated produced fluids concentration profile of the retained chemical for this cycle obtained from a chemical flood mathematical model of the reservoir; (d) simulating within the chemical flood mathematical model at least one more injection-soak-production cycle in the well utilizing a fluid of the same volume and comprising the same concentration of the retained chemical as in step (a) until such time as the simulated produced fluid concentration profile of the chemical is essentially the same as the actual produced fluid concentration profile of tracer from step (a); (e) determining the amount of chemical retained within the contacted reservoir volume for the cyclic test by summing the amount of the chemical retained in step (a) and the amounts of the chemical retained in the simulated cycles of step (d); (f) determining the amount of the chemical that is retained per unit volume by those portions of the reservoir undergoing the cyclic test by dividing the summed amount of chemical retained in step (e) by the reservoir volume contacted in the cyclic test from step (a); and (g) determining the total amount of chemical retained within those portions of the reservoir as a whole that undergo the chemical flood from the information in step (f).
Claim 2
Independent Claim 314 words
A method for determining the amount of a chemical that is retained within a subterranean reservoir undergoing a chemical flooding operation comprising: (a) conducting a first injection-soak-production cycle in a single well which penetrates and communicates with a portion of the reservoir with a volume of a fluid which comprises the retained chemical and a non-retained tracer material; (b) obtaining from a produced fluids concentration profile of the tracer the reservoir volume contacted and a dispersion parameter describing the dispersion effects for a non-retained material within the reservoir; (c) obtaining retention parameters for the retained chemical by history-matching the actual produced fluids concentration profile of the retained chemical with a simulated produced fluids concentration profile of the retained chemical for this cycle obtained from a chemical flood mathematical model of the reservoir; (d) simulating within the chemical flood mathematical model at least one more injection-soak-production cycle in the well utilizing a fluid of the same volume and comprising the same concentration of the retained chemical as in step (a) until such time as the simulated produced fluid concentration profile of the chemical is essentially the same as the actual produced fluid concentration profile of tracer from step (a); (e) determining the amount of chemical retained within the contacted reservoir volume for the cyclic test by summing the amount of the chemical retained in step (a) and the amounts of the chemical retained in the simulated cycles of step (d); (f) determining the amount of the chemical that is retained per unit volume by those portions of the reservoir undergoing the cyclic test by dividing the summed amount of chemical retained in step (e) by the reservoir volume contacted in the cyclic test from step (a); and (g) determining the total amount of chemical retained within those portions of the reservoir as a whole that undergo the chemical flood from the information in step (f).
Claim 3
Dependent Claim 47 words
The method of claim 1 comprising an additional step wherein produced fluids concentration profiles are obtained from a second actual injection-soak-production cycle conducted in the well which are compared with the corresponding simulated produced fluids concentration profiles for the purpose of verifying the accuracy of the simulations.
Claim 4
Dependent Claim 67 words
The method of claim 2 comprising an additional step wherein, if the actual second cycle produced fluids concentration profiles differ from the corresponding simulated profiles by more than an acceptable level, the retention and dispersion parameters from steps (b) and (c) of claim 1 are adjusted in order to bring the differences between the actual second cycle profiles and the corresponding simulated profile to within acceptable levels.
Claim 5
Dependent Claim 19 words
The method of claim 1 wherein the retained chemical comprises a combination of at least two different chemical compounds.
Claim 6
Dependent Claim 351 words
In a petroleum recovery method wherein chemical is injected into an underground petroleum reservoir, the chemical being of a type which will be retained to some extent within the reservoir, wherein the chemical is injected in an amount in excess of that which would be retained within the reservoir wherein the retained amount is determined by a method comprising: (a) conducting a first injection-soak-production cycle in a single well which penetrated and communicates with a portion of the reservoir with a volume of a fluid which comprises the retained chemical and a non-retained tracer material; (b) obtaining from a produced fluids concentration profile of the tracer the reservoir volume contacted and a dispersion parameter describing the dispersion effects for a non-retained material within the reservoir; (c) obtaining retention parameters for the retained chemical by history-matching the actual produced fluids concentration profile of the retained chemical with a simulated produced fluids concentration profile of the retained chemical for this cycle obtained from a chemical flood mathematical model of the reservoir; (d) simulating within the chemical flood mathematical model at least one more injection-soak-production cycle in the well utilizing a fluid of the same volume and comprising the same concentration of the retained chemical as in step (a) until such time as the simulated produced fluid concentration profile of the chemical is essentially the same as the actual produced fluid concentration profile of tracer from step (a); (e) determining the amount of chemical retained within the contacted reservoir volume for the cyclic test by summing the amount of the chemical retained in step (a) and the amounts of the chemical retained in the simulated cycles of step (d); (f) determining the amount of the chemical that is retained per unit volume by those portions of the reservoir undergoing the cyclic test by dividing the summed amount of chemical retained in step (e) by the reservoir volume contacted in the cyclic test from step (a); and (g) determining the total amount of chemical retained within those portions of the reservoir as a whole that undergo the chemical flood from the information in step (f).
Claim 7
Dependent Claim 351 words
In a petroleum recovery method wherein chemical is injected into an underground petroleum reservoir, the chemical being of a type which will be retained to some extent within the reservoir, wherein the chemical is injected in an amount in excess of that which would be retained within the reservoir wherein the retained amount is determined by a method comprising: (a) conducting a first injection-soak-production cycle in a single well which penetrated and communicates with a portion of the reservoir with a volume of a fluid which comprises the retained chemical and a non-retained tracer material; (b) obtaining from a produced fluids concentration profile of the tracer the reservoir volume contacted and a dispersion parameter describing the dispersion effects for a non-retained material within the reservoir; (c) obtaining retention parameters for the retained chemical by history-matching the actual produced fluids concentration profile of the retained chemical with a simulated produced fluids concentration profile of the retained chemical for this cycle obtained from a chemical flood mathematical model of the reservoir; (d) simulating within the chemical flood mathematical model at least one more injection-soak-production cycle in the well utilizing a fluid of the same volume and comprising the same concentration of the retained chemical as in step (a) until such time as the simulated produced fluid concentration profile of the chemical is essentially the same as the actual produced fluid concentration profile of tracer from step (a); (e) determining the amount of chemical retained within the contacted reservoir volume for the cyclic test by summing the amount of the chemical retained in step (a) and the amounts of the chemical retained in the simulated cycles of step (d); (f) determining the amount of the chemical that is retained per unit volume by those portions of the reservoir undergoing the cyclic test by dividing the summed amount of chemical retained in step (e) by the reservoir volume contacted in the cyclic test from step (a); and (g) determining the total amount of chemical retained within those portions of the reservoir as a whole that undergo the chemical flood from the information in step (f).
Claim 8
Dependent Claim 47 words
The method of claim 5 comprising an additional step wherein produced fluids concentration profiles are obtained from a second actual injection-soak-production cycle conducted in the well which are compared with the corresponding simulated produced fluids concentration profiles for the purpose of verifying the accuracy of the simulations.
Claim 9
Dependent Claim 67 words
The method of claim 6 comprising an additional step wherein, if the actual second cycle produced fluids concentration profiles differ from the corresponding simulated profiles by more than an acceptable level, the retention and dispersion parameters from steps (b) and (c) of claim 1 are adjusted in order to bring the differences between the actual second cycle profiles and the corresponding simulated profile to within acceptable levels.
Claim 10
Dependent Claim 19 words
The method of claim 5 wherein the retained chemical comprises a combination of at least two different chemical compounds.

References Cited (Backward Citations)

US3427652A Cited
US3508876A Cited
US4090308A Cited
US4058366A Cited
US4099565A Cited
US4168746A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-06-15 1984-12-15 1985-06-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-06-15 1988-12-15 1989-06-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-06-15 1992-12-15 1993-06-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag