Well pressure testing method

Assignee: Schlumberger Technology Corp
•
Filing: 1979-08-23
•
Granted: 1981-05-19
•
Expires: 1999-08-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for testing producing oil and gas wells is disclosed for determining a representation of pressure at different selected levels of an interval having one or more production zones by combining pressure and pressure gradient measurements. Another aspect of the invention enables the determination of production level performance by combining flow measurements and pressure gradient measurements to create pressure versus flow curves for each production level of an interval.

Inventors

  • 👤 Simon P. Noik

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 19:59
CPC Classifications
E; E21; E21B; E21B49/00; E21B49/008; E21B47/00; E21B47/10

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 128 words
A well test method for determining a represenation of the pressures in a well at different selected levels of an interval having one or more production zones, comprising the following steps: making pressure gradient measurements in the well along the interval of the well; making at least one stationary meaurement of the local pressure in the well at a depth in the interval; and combining the pressure gradient measurements and the said at least one stationary local pressure measurement by integrating the variations of the pressure gradient measurements along the interval to obtain a first pressure-variation profile and shifting the first profile until the best coincidence is obtained with the at least one stationary local pressure measurement to determine the pressure profile of the well along the interval.
Claim 2
Dependent Claim 128 words
A well test method for determining a represenation of the pressures in a well at different selected levels of an interval having one or more production zones, comprising the following steps: making pressure gradient measurements in the well along the interval of the well; making at least one stationary meaurement of the local pressure in the well at a depth in the interval; and combining the pressure gradient measurements and the said at least one stationary local pressure measurement by integrating the variations of the pressure gradient measurements along the interval to obtain a first pressure-variation profile and shifting the first profile until the best coincidence is obtained with the at least one stationary local pressure measurement to determine the pressure profile of the well along the interval.
Claim 3
Dependent Claim 29 words
The method of claim 1 wherein the stationary local pressure measurement is carried out in a zone of the interval of the well not located opposite a production zone.
Claim 4
Dependent Claim 28 words
The method of claim 1 further comprising the step of delineating the effective production zones of the well according to the shape of a pressure gradient measurement curve.
Claim 5
Dependent Claim 199 words
The well test method of determining pressure as a function of flowrate for each production zone in an interval of the well, comprising the steps: (1) For a first total flow of the well, (a) making pressure gradient measurements in the well along the interval of the well; (b) making at least one stationary measurement of the local pressure in the well at a depth in the interval; (c) combining the pressure gradient measurements and said at least one stationary local pressure measurement to determine the pressure profile of the well along the interval; (d) making a logging measurement of the well flow in the well along the interval; (2) For at least a second total flow of the well, repeating steps (a), (b), (c) and (d) above; and (3) For a selected level corresponding to each production level in the well, combining the pressure profile and measured well flow data determined for the first total flow of the well with the pressure profile and measured well flow data determined for the second total flow of the well to determine for each production level a representation of the pressure as a function of the flow from the production level.
Claim 6
Dependent Claim 199 words
The well test method of determining pressure as a function of flowrate for each production zone in an interval of the well, comprising the steps: (1) For a first total flow of the well, (a) making pressure gradient measurements in the well along the interval of the well; (b) making at least one stationary measurement of the local pressure in the well at a depth in the interval; (c) combining the pressure gradient measurements and said at least one stationary local pressure measurement to determine the pressure profile of the well along the interval; (d) making a logging measurement of the well flow in the well along the interval; (2) For at least a second total flow of the well, repeating steps (a), (b), (c) and (d) above; and (3) For a selected level corresponding to each production level in the well, combining the pressure profile and measured well flow data determined for the first total flow of the well with the pressure profile and measured well flow data determined for the second total flow of the well to determine for each production level a representation of the pressure as a function of the flow from the production level.
Claim 7
Dependent Claim 33 words
The method of claim 4 wherein logging measurements for determining the flow of fluids in the well include the operation of measuring the rotating speed of a screw-type detector moved along the interval.
Claim 8
Dependent Claim 50 words
The method of claim 4 further comprising the step of delineating the effective production zones of the well according to the shape of the pressure versus flow curve from a selected level corresponding to a production level to determine the identity of fluids in each production zone of the well.
Claim 9
Dependent Claim 22 words
The method of claim 6 wherein each of said selected levels is determined at the upper end of an effective production zone.
Claim 10
Dependent Claim 76 words
The method of claim 4 further comprising the steps of: combining the well flow logging measurements and the pressure gradient masurements to determine the flows of each phase from at least one biphase production zone; and combining the flows of each phase and the integrated pressure gradient and stationary pressure logging measurements to determine a representation of the pressures in the well as a function of the flows of each phase from the biphase production zone.
Claim 11
Dependent Claim 29 words
The method of claim 4 further comprising the step of plotting a curve corresponding to each representation of pressure as a function of the flow from a production zone.

References Cited (Backward Citations)

USRE21383E Cited
US2348192A Cited
US3184965A Cited
US3283570A Cited
US3321965A Cited
US3909603A Cited
US3905226A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-05-18 1984-11-17 1985-05-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-05-18 1988-11-17 1989-05-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-05-18 1992-11-17 1993-05-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag