US3283570A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Production measurement in multiple completion wells
Assignee: Sunoco Inc
•
Filing: 1963-06-26
•
Granted: 1966-11-08
•
Expires: 1983-06-26
Abstract
No abstract record available.
Inventors
- 👤 James W Hodges
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 19:59
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/14; E21B47/00; E21B47/10
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
180 words
IN A METHOD OF DETERMINING THE RATES OF FLOW FROM TWO SURFACE HYDROCARBON-PRODUCING FORMATIONS, THE STEPS OF: (A) FLOWING FLUID FROM ONLY ONE FORMATION THROUGH AN ORIFICE AND THENCE THROUGH A CONDUIT TO THE SURFACE, (B) VARYING THE SURFACE PRESSURE IN SAID CONDUIT AND MEASURING THE CORRESPONDING RATE OF FLOW IN SAID CONDUIT AND ASO THE CORRESPONDING DOWNHOLE PRESSURE AT A POINT WITHIN SAID CONDUIT IMMEDIATELY DOWNSTREAM FROM SAID ORIFICE, (C) PLOTTING THE INTERRELATED RATE OF FLOW OF DOWNHOLE PRESSURE MEASUREMENTS TO DEFINE A PRODUCTION-PRESSURE CURVE HAVING A POINT OF INFLECTION, (D) FLOWING FLUID FROM BOTH FORMATIONS THROUGH SEPARATE ORIFICES AND THENCE COMMINGLED THROUGH A COMMON CONDUIT TO THE SURFACE, (E) MEASURING THE COMBINED RATE OF FLOW FROM BOTH FORMATIONS WHEN SO COMMINGLED, AND (F) MEASURING THE DOWNHOLE PRESSURE UNDER COMMINGLED FLOW CONDITIONS AT A POINT WITHIN SAID CONDUIT IMMEDIATELY DOWNSTREAM FROM THE ORIFICES; WHEREBY AFTER A COMPARISON OF THE LAST-MENTIONED PRESSURE WITH THE VALUE OF PRESSURE AT POINT OF INFLECTION OF SAID CURVE, THE RESPECTIVE RATES OF FLOW FROM THE TWO FORMATIONS, UNDER COMMINGLED FLOW CONDITIONS, MAY BE DETERMINED.
Claim 2
Dependent Claim
180 words
IN A METHOD OF DETERMINING THE RATES OF FLOW FROM TWO SURFACE HYDROCARBON-PRODUCING FORMATIONS, THE STEPS OF: (A) FLOWING FLUID FROM ONLY ONE FORMATION THROUGH AN ORIFICE AND THENCE THROUGH A CONDUIT TO THE SURFACE, (B) VARYING THE SURFACE PRESSURE IN SAID CONDUIT AND MEASURING THE CORRESPONDING RATE OF FLOW IN SAID CONDUIT AND ASO THE CORRESPONDING DOWNHOLE PRESSURE AT A POINT WITHIN SAID CONDUIT IMMEDIATELY DOWNSTREAM FROM SAID ORIFICE, (C) PLOTTING THE INTERRELATED RATE OF FLOW OF DOWNHOLE PRESSURE MEASUREMENTS TO DEFINE A PRODUCTION-PRESSURE CURVE HAVING A POINT OF INFLECTION, (D) FLOWING FLUID FROM BOTH FORMATIONS THROUGH SEPARATE ORIFICES AND THENCE COMMINGLED THROUGH A COMMON CONDUIT TO THE SURFACE, (E) MEASURING THE COMBINED RATE OF FLOW FROM BOTH FORMATIONS WHEN SO COMMINGLED, AND (F) MEASURING THE DOWNHOLE PRESSURE UNDER COMMINGLED FLOW CONDITIONS AT A POINT WITHIN SAID CONDUIT IMMEDIATELY DOWNSTREAM FROM THE ORIFICES; WHEREBY AFTER A COMPARISON OF THE LAST-MENTIONED PRESSURE WITH THE VALUE OF PRESSURE AT POINT OF INFLECTION OF SAID CURVE, THE RESPECTIVE RATES OF FLOW FROM THE TWO FORMATIONS, UNDER COMMINGLED FLOW CONDITIONS, MAY BE DETERMINED.
References Cited (Backward Citations)
US1406682A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1969-11-07 | 1970-05-09 | 1970-11-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1973-11-07 | 1974-05-09 | 1974-11-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1977-11-07 | 1978-05-09 | 1978-11-08 | $7700.00 | Window Closed / Lapsed |