Abstract A method for controlling a mine roof by drilling one or more boreholes into the roof formation to a location adjacent the top of a mineral seam and hydraulically fracturing the roof formation to enlarge the natural caving zone or to induce orderly caving of a mine roof.
Inventors
- 👤 Dai S. Choi
- 👤 Hilmar A. von Schonfeldt
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-05 14:51
CPC Classifications
E; E21; E21D; E21D19/00; E21C; E21C41/00; E21C41/16; E21F; E21F17/00
Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
132 words
A method of controlling a mine roof comprising: (a) drilling at least one borehole through a mine roof formation from the surface to a point adjacent a mineral seam, said borehole being at an angle of from 0 to 30 degrees to a vertical reference axis; (b) sealing off a portion of said borehole from a vertical height of from 20 to 400 meters above the top of said mineral seam to said point adjacent said seam; and (c) injecting fluid into the sealed off portion of said borehole at a pressure sufficient to create fractures in the mine roof formation along the sealed off portion of said borehole whereby the caving zone over a mined out portion of said mineral seam is greater than the natural caving zone over said portion.
Claim 2
Independent Claim
132 words
A method of controlling a mine roof comprising: (a) drilling at least one borehole through a mine roof formation from the surface to a point adjacent a mineral seam, said borehole being at an angle of from 0 to 30 degrees to a vertical reference axis; (b) sealing off a portion of said borehole from a vertical height of from 20 to 400 meters above the top of said mineral seam to said point adjacent said seam; and (c) injecting fluid into the sealed off portion of said borehole at a pressure sufficient to create fractures in the mine roof formation along the sealed off portion of said borehole whereby the caving zone over a mined out portion of said mineral seam is greater than the natural caving zone over said portion.
Claim 3
Dependent Claim
13 words
The method of claim 1 wherein a plurality of parallel boreholes are utilized.
Claim 4
Dependent Claim
23 words
The method of claim 1 wherein said mineral seam is a coal seam having a substantially uniform height and includes a mined-out area.
Claim 5
Dependent Claim
29 words
The method of claim 3 wherein the vertical height of the sealed off portion of the borehole is from 30 to 70 times the height of said mined-out seam.
Claim 6
Dependent Claim
27 words
The method of claim 4 wherein the vertical height of the sealed off portion of the borehole is about 50 times the height of the mined-out seam.
Claim 7
Dependent Claim
19 words
The method of claim 4 wherein said mineral seam is a coal seam being developed by long wall mining.
Claim 8
Dependent Claim
19 words
The method of claim 6 wherein said borehole extends to a point adjacent an edge of a mined-out area.
Claim 9
Dependent Claim
20 words
The method of claim 7 wherein a plurality of parallel boreholes adjacent an edge of a mined-out area are utilized.
Claim 10
Dependent Claim
42 words
The method of claim 8 wherein said boreholes are inclined at an angle of about 18° away from the mined-out area and the fracture plane is generated by injection of water at a pressure of from 100 to 1000 kg/cm 2 .
Claim 11
Dependent Claim
29 words
The method of claim 9 wherein said boreholes are parallel to a mine entryway, and a caved-in zone larger than the natural caved-in zone resulting from mining is created.
Claim 12
Dependent Claim
166 words
In a long wall mining operation in which an entryway extends parallel to an edge of an area being mined and in which an entryway support system comprising a series of pillars extends between said edge and said entryway, the improvement wherein the caving zone of said area being mined is increased by the method comprising: (a) drilling at least one borehole to a point adjacent said edge of said area being mined, said borehole being at an angle of from 0 to 30 degrees away from a vertical plane through said edge and toward said entryway; (b) sealing off a portion of said borehole from a vertical height of from 20 to 400 meters above said point to said point; and (c) injecting fluid into the sealed off portion of said borehole at a pressure sufficient to create a fracture plane whereby the caving zone above the area being mined is increased toward said opening and the load on said opening support system is reduced.
Claim 13
Dependent Claim
166 words
In a long wall mining operation in which an entryway extends parallel to an edge of an area being mined and in which an entryway support system comprising a series of pillars extends between said edge and said entryway, the improvement wherein the caving zone of said area being mined is increased by the method comprising: (a) drilling at least one borehole to a point adjacent said edge of said area being mined, said borehole being at an angle of from 0 to 30 degrees away from a vertical plane through said edge and toward said entryway; (b) sealing off a portion of said borehole from a vertical height of from 20 to 400 meters above said point to said point; and (c) injecting fluid into the sealed off portion of said borehole at a pressure sufficient to create a fracture plane whereby the caving zone above the area being mined is increased toward said opening and the load on said opening support system is reduced.
Claim 14
Dependent Claim
13 words
The method of claim 11 wherein a plurality of parallel boreholes are utilized.
Claim 15
Dependent Claim
31 words
The method of claim 12 wherein the vertical height of the sealed off portion of the boreholes is from 30 to 70 times the height of the seam being mined out.
References Cited (Backward Citations)
US999000A
Cited
US2867426A
Cited
US3068654A
Cited
US3026096A
Cited
US3111306A
Cited
US3097830A
Cited
US3673807A
Cited
US3988037A
Cited
US4084384A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-05-04 | 1984-11-03 | 1985-05-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-05-04 | 1988-11-03 | 1989-05-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-05-04 | 1992-11-03 | 1993-05-05 | $7700.00 | Window Closed / Lapsed |