Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
100 words
A method for excavating a longitudinally extending underground opening, comprising the steps of initiating said underground opening at an excavation face, cutting at least one longitudinally extending slot through said excavation fact to interrupt and relieve the lateral shear stresses in the boundary formation around said excavation face, and thereafter excavating said face and continuing to cut said longitudinally extending slot ahead of said excavation face and wherein said longitudinally extending slot is cut generally orthogonally to the strata through which the excavation is proceeding to form a stress envelope beyond the distal extent of said at least one slot.
Claim 2
Independent Claim
100 words
A method for excavating a longitudinally extending underground opening, comprising the steps of initiating said underground opening at an excavation face, cutting at least one longitudinally extending slot through said excavation fact to interrupt and relieve the lateral shear stresses in the boundary formation around said excavation face, and thereafter excavating said face and continuing to cut said longitudinally extending slot ahead of said excavation face and wherein said longitudinally extending slot is cut generally orthogonally to the strata through which the excavation is proceeding to form a stress envelope beyond the distal extent of said at least one slot.
Claim 3
Dependent Claim
32 words
The method of claim 1 further including the step of grouting and anchor bolting through said slot into said stress-relieved strata to bond said strata together as a lining of said opening.
Claim 4
Dependent Claim
28 words
The method of claim 1, wherein said longitudinally extending slot is cut in the overlying strata and the underlying strata as well as ahead of the advancing excavation.
Claim 5
Dependent Claim
102 words
In a method of controlling long term safety of underground entry system by regulating formation of stress envelopes, the improvement comprising cutting at least one advanced slot through the boundary of the opening to be excavated for the primary relief openings to stress relieve and preserve natural cohesiveness of said ground, excavating a pair of primary relief openings through said stress-relieved ground to establish a pair of primary stress envelopes about each primary relief opening, and excavating a protected room between said primary relief openings to combine said primary stress envelopes into a secondary stress envelope spaced about the entire opening system.
Claim 6
Dependent Claim
102 words
In a method of controlling long term safety of underground entry system by regulating formation of stress envelopes, the improvement comprising cutting at least one advanced slot through the boundary of the opening to be excavated for the primary relief openings to stress relieve and preserve natural cohesiveness of said ground, excavating a pair of primary relief openings through said stress-relieved ground to establish a pair of primary stress envelopes about each primary relief opening, and excavating a protected room between said primary relief openings to combine said primary stress envelopes into a secondary stress envelope spaced about the entire opening system.
Claim 7
Dependent Claim
134 words
In a method of controlling safety of total extraction mining by using a long or short wall mining method, the improvement comprising cutting at least one vertical advanced slot through the roof strata of a long wall mining room at the opposite side of the room from the mining face to protect the immediate roof strata above the mining room, simultaneously allowing previously mined out rooms to fail, the failed ground to provide a foundation to form a relatively small protective stress envelope which advances with the advancement of the mining face, providing required roof protection at the mining face by selecting the height of said roof slot and width of said mining room, to permit the total extraction of long wall mining system without the use of a massive mechanical roof supporting system.
Claim 8
Dependent Claim
134 words
In a method of controlling safety of total extraction mining by using a long or short wall mining method, the improvement comprising cutting at least one vertical advanced slot through the roof strata of a long wall mining room at the opposite side of the room from the mining face to protect the immediate roof strata above the mining room, simultaneously allowing previously mined out rooms to fail, the failed ground to provide a foundation to form a relatively small protective stress envelope which advances with the advancement of the mining face, providing required roof protection at the mining face by selecting the height of said roof slot and width of said mining room, to permit the total extraction of long wall mining system without the use of a massive mechanical roof supporting system.