Method of lining tunneled tubes
Assignee: Hochtief AG
•
Filing: 1979-05-21
•
Granted: 1981-04-28
•
Expires: 1999-05-21
Abstract
Abstract A method of lining a tunnel wall comprises the pumping of concrete between a support and the tunnel wall, the concrete being selected from the concretes of concrete group BII of German Industrial Standard (DIN) 1045 and containing as an additive, steel pins, rods or wires having a length of 35 to 50 mm and a diameter of 0.8 to 1.2 mm. Approximately 100 kg/m 3 of concrete is constituted by the steel pins or wires.
Inventors
- 👤 Wolf Magnus
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 13:21
CPC Classifications
C; C04; C04B; C04B14/00; C04B14/38; C04B14/48; C04B14/02; C04B14/34
Claims Analysis
Total Claims: 3
Claim 1
Independent Claim
185 words
In a method of forming a tunnel wherein a subterranean tube is excavated, concrete is applied to the wall of said tube as a load-bearing structure, the improvement wherein: (a) a concrete mix of cement, aggregate and water forming a concrete of the concrete group B II of German Industrial Standard DIN 1045 is formed at a location remote from the tunnel excavation by mixing with the cement, aggregate and water a steel-pin additive in an amount of about 100 kg/m 3 , the steel-pin additive consisting essentially of steel wire sections having lengths of 35 to 50 mm and thicknesses of 0.8 to 1.2 mm so as to uniformly disperse said steel wire sections in the resulting concrete mix, said mix forming a concrete of strength class Bn 350; (b) pumping said mix without agglomeration of said steel wire sections and separation thereof from the remainder of said mix to the excavation and introducing said mix between said wall and a form work juxtaposed therewith; and (c) hardening said mix against said wall without agglomeration or separation of said sections into a load-bearing structure.
Claim 2
Dependent Claim
185 words
In a method of forming a tunnel wherein a subterranean tube is excavated, concrete is applied to the wall of said tube as a load-bearing structure, the improvement wherein: (a) a concrete mix of cement, aggregate and water forming a concrete of the concrete group B II of German Industrial Standard DIN 1045 is formed at a location remote from the tunnel excavation by mixing with the cement, aggregate and water a steel-pin additive in an amount of about 100 kg/m 3 , the steel-pin additive consisting essentially of steel wire sections having lengths of 35 to 50 mm and thicknesses of 0.8 to 1.2 mm so as to uniformly disperse said steel wire sections in the resulting concrete mix, said mix forming a concrete of strength class Bn 350; (b) pumping said mix without agglomeration of said steel wire sections and separation thereof from the remainder of said mix to the excavation and introducing said mix between said wall and a form work juxtaposed therewith; and (c) hardening said mix against said wall without agglomeration or separation of said sections into a load-bearing structure.
Claim 3
Dependent Claim
22 words
The improvement defined in claim 1 wherein said sections have lengths of 40 to 45 mm and thicknesses of about 1 mm.
References Cited (Backward Citations)
US2089149A
Cited
US3429094A
Cited
US3650785A
Cited
US3986885A
Cited
US3834916A
Cited
US4106300A
Cited
US4121943A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1984-04-27 | 1984-10-27 | 1985-04-28 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1988-04-27 | 1988-10-27 | 1989-04-28 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1992-04-27 | 1992-10-27 | 1993-04-28 | $7700.00 | Window Closed / Lapsed |