Method of lining tunneled tubes

Assignee: Hochtief AG
•
Filing: 1979-05-21
•
Granted: 1981-04-28
•
Expires: 1999-05-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of lining a tunnel wall comprises the pumping of concrete between a support and the tunnel wall, the concrete being selected from the concretes of concrete group BII of German Industrial Standard (DIN) 1045 and containing as an additive, steel pins, rods or wires having a length of 35 to 50 mm and a diameter of 0.8 to 1.2 mm. Approximately 100 kg/m 3 of concrete is constituted by the steel pins or wires.

Inventors

  • 👤 Wolf Magnus

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 13:21
CPC Classifications
C; C04; C04B; C04B14/00; C04B14/38; C04B14/48; C04B14/02; C04B14/34

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 185 words
In a method of forming a tunnel wherein a subterranean tube is excavated, concrete is applied to the wall of said tube as a load-bearing structure, the improvement wherein: (a) a concrete mix of cement, aggregate and water forming a concrete of the concrete group B II of German Industrial Standard DIN 1045 is formed at a location remote from the tunnel excavation by mixing with the cement, aggregate and water a steel-pin additive in an amount of about 100 kg/m 3 , the steel-pin additive consisting essentially of steel wire sections having lengths of 35 to 50 mm and thicknesses of 0.8 to 1.2 mm so as to uniformly disperse said steel wire sections in the resulting concrete mix, said mix forming a concrete of strength class Bn 350; (b) pumping said mix without agglomeration of said steel wire sections and separation thereof from the remainder of said mix to the excavation and introducing said mix between said wall and a form work juxtaposed therewith; and (c) hardening said mix against said wall without agglomeration or separation of said sections into a load-bearing structure.
Claim 2
Dependent Claim 185 words
In a method of forming a tunnel wherein a subterranean tube is excavated, concrete is applied to the wall of said tube as a load-bearing structure, the improvement wherein: (a) a concrete mix of cement, aggregate and water forming a concrete of the concrete group B II of German Industrial Standard DIN 1045 is formed at a location remote from the tunnel excavation by mixing with the cement, aggregate and water a steel-pin additive in an amount of about 100 kg/m 3 , the steel-pin additive consisting essentially of steel wire sections having lengths of 35 to 50 mm and thicknesses of 0.8 to 1.2 mm so as to uniformly disperse said steel wire sections in the resulting concrete mix, said mix forming a concrete of strength class Bn 350; (b) pumping said mix without agglomeration of said steel wire sections and separation thereof from the remainder of said mix to the excavation and introducing said mix between said wall and a form work juxtaposed therewith; and (c) hardening said mix against said wall without agglomeration or separation of said sections into a load-bearing structure.
Claim 3
Dependent Claim 22 words
The improvement defined in claim 1 wherein said sections have lengths of 40 to 45 mm and thicknesses of about 1 mm.

References Cited (Backward Citations)

US2089149A Cited
US3429094A Cited
US3650785A Cited
US3986885A Cited
US3834916A Cited
US4106300A Cited
US4121943A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-04-27 1984-10-27 1985-04-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-04-27 1988-10-27 1989-04-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-04-27 1992-10-27 1993-04-28 $7700.00 Window Closed / Lapsed