← Back to Patent Explorer
US4254167A Expired / Lapsed US ⏱️ 0.0 years remaining

Process of treating sponge iron for protection against reoxidation and apparatus for carrying out the process

Assignee: VEREINIGTE OSTERREICHISCHE EISEN-UND STAHLWERKE-ALPINE MONTAN AKTIENGESELLSCHAFT A CORP OF AUSTRIA
•
Filing: 1978-07-14
•
Granted: 1981-03-03
•
Expires: 1998-07-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for treating sponge iron to protect it against reoxidation and/or corrosion during storage and transit comprising the steps of tumbling sponge iron which is in particle form with a pre-prepared blend of caustic lime powder and an adhesion promoting additive selected from the group consisting of iron oxide or mixtures thereof with iron to produce a coated product, the blend containing 1 to 20% by weight iron oxide; and then moistening the coated product with an amount of water less than the amount of water required for complete hydration of the caustic lime.

Inventors

  • 👤 Horst Sulzbacher
  • 👤 Kurt Stift
  • 👤 Gunther Saiger

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 00:32
CPC Classifications
C; C22; C22B; C22B1/00; C22B1/14; C21; C21B; C21B13/00; C21B13/0086; Y; Y02; Y02P; Y02P10/00; Y02P10/10; Y02P10/134; Y10; Y10T; Y10T428/00; Y10T428/29; Y10T428/2982; Y10T428/2991

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 95 words
A process for treating sponge iron to protect it against reoxidation and/or corrosion during storage and transit comprising the steps of tumbling sponge iron which is in particle form with a pre-prepared blend of caustic lime powder and an adhesion promoting additive selected from the group consisting of iron oxide or mixtures thereof with iron to produce a coated product, said blend containing 1 to 20% by weight iron oxide; and then moistening the coated product with an amount of water less than the amount of water required for complete hydration of the caustic lime.
Claim 2
Dependent Claim 95 words
A process for treating sponge iron to protect it against reoxidation and/or corrosion during storage and transit comprising the steps of tumbling sponge iron which is in particle form with a pre-prepared blend of caustic lime powder and an adhesion promoting additive selected from the group consisting of iron oxide or mixtures thereof with iron to produce a coated product, said blend containing 1 to 20% by weight iron oxide; and then moistening the coated product with an amount of water less than the amount of water required for complete hydration of the caustic lime.
Claim 3
Dependent Claim 52 words
The process of claim 1, wherein, prior to the step of tumbling, uncoated sponge iron particles are introduced into a sieve having sieve openings of a width of at least 2 mm, and then those uncoated sponge iron particles which are retained in the sieve are subjected to said step of tumbling.
Claim 4
Dependent Claim 13 words
The process of claim 2, wherein said width is at least 4 mm.
Claim 5
Dependent Claim 22 words
The process of claim 1, wherein sponge iron particles, which are subjected to said tumbling step, have a diameter greater 8 mm.
Claim 6
Dependent Claim 20 words
The process of claim 1, wherein said iron oxide is Fe 2 O 3 or Fe 2 O 4 .
Claim 7
Dependent Claim 23 words
The process of claim 5, wherein the blend of lime powder and iron oxide contains at least 80% by weight of caustic lime.
Claim 8
Dependent Claim 18 words
The process of claim 5, wherein said iron oxide comprises at least 10% by weight of said blend.
Claim 9
Dependent Claim 26 words
The process of claim 1, wherein the coated product contains 3 to 6% by weight of said blend, based on the weight of sponge iron particles.
Claim 10
Dependent Claim 37 words
The process of claim 1, wherein said step of tumbling is undertaken in pelletizing drums or on pelletizing plates and wherein said step of moistening is undertaken by spraying a mist of water on said coated product.
Claim 11
Dependent Claim 31 words
The process of claim 1, wherein the weight of the blend used in said tumbling step is about one-half the weight of the sponge iron particles subjected to said tumbling step.
Claim 12
Dependent Claim 31 words
The process of claim 1, wherein the amount of water which is used in said moistening step is about 80% of that amount of water required to hydrate said caustic lime.
Claim 13
Dependent Claim 78 words
The process of claim 1, wherein each of said steps of tumbling and moistening are undertaken in two intermittent successive stages whereby the sponge iron particles are tumbled to form a coated product, moistened to form coated moistened sponge iron particles which are again tumbled in a blend of caustic lime powder and said adhesion promoting additive and then again moistened with an amount of water less than that used in the step of moistening said coated product.
Claim 14
Dependent Claim 20 words
The process of claim 1, 8 or 12, wherein said steps of tumbling and moistening are undertaken at ambient temperature.
Claim 15
Dependent Claim 49 words
The process of claim 1 or 8, wherein the tumbled moistened product exhibits substantial passivity to reoxidation and corrosion and wherein unhydrated lime present after said step of moistening can react with water and thus protect the sponge iron of the tumbled moistened product from atmospheric humidity and water.

References Cited (Backward Citations)

US2871115A Cited
US3185563A Cited
US3690930A Cited
US4075370A Cited
US4116679A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1984-03-02 1984-09-01 1985-03-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1988-03-02 1988-09-01 1989-03-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1992-03-02 1992-09-01 1993-03-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag