Patent US4208591A successfully refreshed from Google Patents.
US4208591A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Gas turbine power plant control apparatus including a turbine load control system
Assignee: Westinghouse Electric Corp
•
Filing: 1973-06-20
•
Granted: 1980-06-17
•
Expires: 1993-06-20
Abstract
Abstract A gas turbine power plant is provided with an industrial gas turbine which drives a generator coupled to a power system through a breaker. The turbine-generator plant is operated by a hybrid control system having digital function capability during sequenced startup, synchronizing, load buildup and steady state load, and shutdown operations. The control system also contains monitoring and protective subsystems which function through all stages of operation, with redundancy and permissive features which maximize turbine availability.
Inventors
- 👤 Robert A. Yannone
- 👤 James J. Shields
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 12:18
CPC Classifications
F; F02; F02C; F02C9/00; F02C9/26; F02C9/28; F05; F05D; F05D2270/00; F05D2270/01; F05D2270/06; F05D2270/061
Claims Analysis
Total Claims: 22
Claim 1
Independent Claim
221 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to the gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to deliver power to the power system, a fuel system for supplying fuel to said gas turbine combustion element, and a turbine load control system for controlling the load accepted by said turbine, said turbine load control system comprising: a. a first control path for generating a first control signal adaptable to control the acceptance of turbine load according to a first predetermined schedule; b. a second control path for generating a second control signal adaptable to control the acceptance of turbine load according to a second schedule, and having means for selectively initiating generation of said second control signal in accordance with operator choice; c. said second control path including means for selecting the rate of change of said generated second control signal from a plurality of rates; d. means for comparing said control signals in accordance with a predetermined arrangement, and for providing a turbine load acceptance control signal derived from said comparison; and e. means for operating said fuel system with said derived turbine load acceptance control signal to schedule the acceptance of turbine load after generator breaker closing.
Claim 2
Dependent Claim
221 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to the gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to deliver power to the power system, a fuel system for supplying fuel to said gas turbine combustion element, and a turbine load control system for controlling the load accepted by said turbine, said turbine load control system comprising: a. a first control path for generating a first control signal adaptable to control the acceptance of turbine load according to a first predetermined schedule; b. a second control path for generating a second control signal adaptable to control the acceptance of turbine load according to a second schedule, and having means for selectively initiating generation of said second control signal in accordance with operator choice; c. said second control path including means for selecting the rate of change of said generated second control signal from a plurality of rates; d. means for comparing said control signals in accordance with a predetermined arrangement, and for providing a turbine load acceptance control signal derived from said comparison; and e. means for operating said fuel system with said derived turbine load acceptance control signal to schedule the acceptance of turbine load after generator breaker closing.
Claim 3
Dependent Claim
24 words
The turbine load acceptance control system as set forth in claim 1 additionally comprising means for automatically limiting turbine load at a given level.
Claim 4
Dependent Claim
72 words
The turbine load acceptance control system as set forth in claim 2 wherein said means for limiting turbine load includes means for generating at least one signal which is a function of the temperature at a predetermined portion of said turbine, and wherein said comparing means also compares said temperature signal with said first and second control signals, and derives said turbine load acceptance control signal as a function of said comparison.
Claim 5
Dependent Claim
44 words
The turbine load acceptance control system as set forth in claim 3 wherein said load limiting means limits accepted turbine load to a level which is commensurate with said temperature signal if said temperature signal is derived as said turbine load acceptance control signal.
Claim 6
Dependent Claim
39 words
The turbine load acceptance control system as set forth in claim 4 wherein said means for generating at least one signal includes means for adapting said temperature signal to correspond to one of a plurality of acceptable load levels.
Claim 7
Dependent Claim
30 words
The turbine load acceptance control system as set forth in claim 5 further comprising means for manually controlling generation of one of said control signals, thereby manually controlling load change.
Claim 8
Dependent Claim
53 words
The turbine load acceptance control system as set forth in claim 6 further comprising means for initiation of generation of said first control signal prior to generator breaker closing, and wherein said operating means operates said fuel supply system with said first control signal to schedule turbine speed prior to generator breaker closing.
Claim 9
Dependent Claim
37 words
The turbine load acceptance control system as set forth in claim 7 comprising means for changing said first control signal at generator breaker closing, so as to enable said turbine to accept load at generator breaker closing.
Claim 10
Dependent Claim
29 words
The turbine load acceptance control system as set forth in claim 1 wherein said initiation means is adapted to initiate generation of said second signal at generator breaker closing.
Claim 11
Dependent Claim
54 words
The turbine load acceptance control system as set forth in claim 9 wherein said first and second control signals are substantially the same just after breaker closing and said second control signal is changed at a rate relative to said first control signal so that it controls the turbine loading after generator breaker closing.
Claim 12
Dependent Claim
227 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to the gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to deliver power to the power system, a fuel system for supplying fuel to said gas turbine combustion element, and a turbine load control system for controlling the load accepted by said turbine, said turbine load control system comprising: a. a first closed loop control path for generating a first control signal adaptable to control the acceptance of turbine load according to a first predetermined schedule; b. a second closed loop control path for generating a second control signal adaptable to control the acceptance of turbine load according to a second schedule, and having means for selectively initiating generation of said second control signal in accordance with operator choice; c. said second closed loop control path including means for selecting the rate of change of said generated second control signal from a plurality of rates; d. means for comparing said control signals in accordance with a predetermined arrangement, and for providing a turbine load acceptance control signal derived from said comparison; and e. means for operating said fuel system with said derived turbine load acceptance control signal to schedule the acceptance of turbine load after generator breaker closing.
Claim 13
Dependent Claim
227 words
A gas turbine electric power plant including a gas turbine having compressor, combustion and turbine elements, a generator coupled to the gas turbine for drive power, a generator breaker for coupling said generator to a power system so as to deliver power to the power system, a fuel system for supplying fuel to said gas turbine combustion element, and a turbine load control system for controlling the load accepted by said turbine, said turbine load control system comprising: a. a first closed loop control path for generating a first control signal adaptable to control the acceptance of turbine load according to a first predetermined schedule; b. a second closed loop control path for generating a second control signal adaptable to control the acceptance of turbine load according to a second schedule, and having means for selectively initiating generation of said second control signal in accordance with operator choice; c. said second closed loop control path including means for selecting the rate of change of said generated second control signal from a plurality of rates; d. means for comparing said control signals in accordance with a predetermined arrangement, and for providing a turbine load acceptance control signal derived from said comparison; and e. means for operating said fuel system with said derived turbine load acceptance control signal to schedule the acceptance of turbine load after generator breaker closing.
Claim 14
Dependent Claim
24 words
The turbine load acceptance control system as set forth in claim 11 additionally comprising means for automatically limiting turbine load at a given level.
Claim 15
Dependent Claim
72 words
The turbine load acceptance control system as set forth in claim 12 wherein said means for limiting turbine load includes means for generating at least one signal which is a function of the temperature at a predetermined portion of said turbine, and wherein said comparing means also compares said temperature signal with said first and second control signals, and derives said turbine load acceptance control signal as a function of said comparison.
Claim 16
Dependent Claim
44 words
The turbine load acceptance control system as set forth in claim 13 wherein said load limiting means limits accepted turbine load to a level which is commensurate with said temperature signal if said temperature signal is derived as said turbine load acceptance control signal.
Claim 17
Dependent Claim
39 words
The turbine load acceptance control system as set forth in claim 14 wherein said means for generating at least one signal includes means for adapting said temperature signal to correspond to one of a plurality of acceptable load levels.
Claim 18
Dependent Claim
30 words
The turbine load acceptance control system as set forth in claim 15 further comprising means for manually controlling generation of one of said control signals, thereby manually controlling load change.
Claim 19
Dependent Claim
53 words
The turbine load acceptance control system as set forth in claim 16 further comprising means for initiation of generation of said first control signal prior to generator breaker closing, and wherein said operating means operates said fuel supply system with said first control signal to schedule turbine speed prior to generator breaker closing.
Claim 20
Dependent Claim
37 words
The turbine load acceptance control system as set forth in claim 17 comprising means for changing said first control signal at generator breaker closing, so as to enable said turbine to accept load at generator breaker closing.
Claim 21
Dependent Claim
29 words
The turbine load acceptance control system as set forth in claim 11 wherein said initiation means is adapted to initiate generation of said second signal at generator breaker closing.
Claim 22
Dependent Claim
54 words
The turbine load acceptance control system as set forth in claim 19 wherein said first and second control signals are substantially the same just after breaker closing and said second control signal is changed at a rate relative to said first control signal so that it controls the turbine loading after generator breaker closing.
References Cited (Backward Citations)
US3098356A
Cited
US3243596A
Cited
US3325650A
Cited
US3340883A
Cited
US3446224A
Cited
US3533236A
Cited
US3630023A
Cited
US3639076A
Cited
US3738102A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-06-17 | 1983-12-17 | 1984-06-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-06-17 | 1987-12-17 | 1988-06-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-06-17 | 1991-12-17 | 1992-06-17 | $7700.00 | Window Closed / Lapsed |