Patent US4201420A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4201420A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of oil recovery by thermal mining

Assignee: PECHORSKY GOSUDARSTVENNY NAUCNNO ISSLEDOVALELSLEY I PROERTH
•
Filing: 1978-08-31
•
Granted: 1980-05-06
•
Expires: 1998-08-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of oil recovery by thermal mining from oil deposit sections into which the mine field is divided, according to which a plurality of underground workings are provided ensuring a successive recovery of oil from the mine field sections. The plurality of underground workings include intake and development wells. Thereupon, an overall mine ventilation system is set up ensuring the ventilation of the workings. Prior to the supply of heating medium to the development wells, the flow of heating medium is throttled. Then, the throttled heating medium flow is force-fed via pipes into the development wells for heating the oil bed to the temperature at which oil assumes the required fluidity in the oil bed. A fluid medium is then force-fed to the intake wells to force oil from the oil bed into the development wells and pump it up to the surface.

Inventors

  • 👤 Vasily K. Likholai
  • 👤 Boris A. Tjunkin

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 18:15
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/30; E21B43/305; E21B43/16; E21B43/24; E21C; E21C41/00; E21C41/16; E21C41/24

Claims Analysis

Total Claims: 8
Claim 1
Independent Claim 155 words
A method of oil recovery by thermal mining from oil deposit sections into which a mine field is divided, wherein a plurality of underground workings are provided ensuring a successive recovery of oil from the mine field sections and including intake and development wells, and an overall mine ventilation system is set up ensuring the ventilation of the underground workings, after which a flow of heating medium is throttled and force-fed via pipes into the development wells for heating the oil bed to a temperature at which oil assumes the required fluidity in the oil bed, whereupon a fluid medium is force-fed to the intake wells to drive oil from the oil bed into the development wells and pump it out up to the surface, the throttling of the heating medium before the force-feeding of the same automatically controlling the force-feeding of the heating medium to, extracting oil from and cleaning of the development wells.
Claim 2
Independent Claim 155 words
A method of oil recovery by thermal mining from oil deposit sections into which a mine field is divided, wherein a plurality of underground workings are provided ensuring a successive recovery of oil from the mine field sections and including intake and development wells, and an overall mine ventilation system is set up ensuring the ventilation of the underground workings, after which a flow of heating medium is throttled and force-fed via pipes into the development wells for heating the oil bed to a temperature at which oil assumes the required fluidity in the oil bed, whereupon a fluid medium is force-fed to the intake wells to drive oil from the oil bed into the development wells and pump it out up to the surface, the throttling of the heating medium before the force-feeding of the same automatically controlling the force-feeding of the heating medium to, extracting oil from and cleaning of the development wells.
Claim 3
Dependent Claim 42 words
A method as set forth in claim 1, wherein, prior to the supply of the throttled flow of heating medium to the development wells, the underground workings of the oil bed section being heated are separated from the overall mine ventilation system.
Claim 4
Dependent Claim 48 words
A method as set forth in claim 2, wherein the supply of heating medium and separation of the oil bed underground workings from the overall mine ventilation system are carried out successively in the mine field sections, starting from the mine field boundaries towards the central portion thereof.
Claim 5
Dependent Claim 48 words
A method as set forth in claim 2, wherein the supply of heating medium and separation of the oil bed underground workings from the overall mine ventilation system are carried out successively in the mine field sections, starting from the mine field boundaries towards the central portion thereof.
Claim 6
Dependent Claim 35 words
A method as set forth in claim 1, wherein the flow of heating medium to the development wells is delivered via pipes thermoisolated at the wellhead and run down to the face of said wells.
Claim 7
Dependent Claim 30 words
A method as set forth in claim 1, wherein the flow of heating medium is delivered into uncased development wells or into wells equipped over the entire length with filters.
Claim 8
Dependent Claim 58 words
A method as set forth in claim 1, wherein, following the supply of heating medium to the development wells for heating the oil bed of the first section of the mine field, the same heating medium is re-cycled to the development wells of the adjacent section in accordance with the flow sequence of developing the mine field sections.

References Cited (Backward Citations)

US1935643A Cited
US1520737A Cited
US1811560A Cited
US1735012A Cited
US1735481A Cited
US1842098A Cited
US2989294A Cited
US4099783A Cited
US4101172A Cited
US4099570A Cited
US4067391A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1983-05-06 1983-11-05 1984-05-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1987-05-06 1987-11-05 1988-05-06 $3760.00 Window Closed / Lapsed