Patent US4200152A successfully refreshed from Google Patents.
US4200152A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for enhancing simultaneous fracturing in the creation of a geothermal reservoir
Assignee: Individual
•
Filing: 1979-01-12
•
Granted: 1980-04-29
•
Expires: 1999-01-12
Abstract
Abstract A process for creating a hot dry rock oven for the extraction of heat energy is disclosed wherein the geothermal fluid injection and withdrawal wells are brought into positive hydraulic communication during the creation of the hot dry rock oven. The oven complex is produced by fracturing the formation from a plurality of bore holes simultaneously.
Inventors
- 👤 John W. Foster
- 👤 Clarence R. Jones
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 02:40
CPC Classifications
E; E21; E21B; E21B41/00; E21B41/005; E21B43/00; E21B43/16; E21B43/17; E21B43/28; E21B43/283; E21B43/30; E21B43/305; F; F24; F24T; F24T10/00; F24T10/20; Y; Y02; Y02E; Y02E10/00; Y02E10/10
Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
190 words
A process for creating a fracture complex in a hot dry rock formation, comprising the steps of: (a) drilling at least one fluid injection well and one fluid withdrawal well which are approximately vertical to the approximate location within a crystalline rock formation at which a temperature exists from which useful heat energy may be extracted; (b) deviating said wells from their vertical orientation in a direction approximately perpendicular to the compass direction of the most likely fracture plane of said formation such that said withdrawal well lies above, parallel to and in approximately the same plane as the fluid injection well; (c) orientating means for fracturing said formation within said injection and withdrawal wells in alignment with the vertical direction of the anticipated fracture plane of said formation, (d) gradually pressuring the fracture means to a level slightly below the rock failure pressure of said formation and simultaneously fracturing said formation from the injection and withdrawal wells by suddenly exerting pressure in excess of said rock failure pressure in said fracturing means simultaneously to produce a single interconnecting fracture of large surface area connecting said wells for hydraulic communication.
Claim 2
Dependent Claim
190 words
A process for creating a fracture complex in a hot dry rock formation, comprising the steps of: (a) drilling at least one fluid injection well and one fluid withdrawal well which are approximately vertical to the approximate location within a crystalline rock formation at which a temperature exists from which useful heat energy may be extracted; (b) deviating said wells from their vertical orientation in a direction approximately perpendicular to the compass direction of the most likely fracture plane of said formation such that said withdrawal well lies above, parallel to and in approximately the same plane as the fluid injection well; (c) orientating means for fracturing said formation within said injection and withdrawal wells in alignment with the vertical direction of the anticipated fracture plane of said formation, (d) gradually pressuring the fracture means to a level slightly below the rock failure pressure of said formation and simultaneously fracturing said formation from the injection and withdrawal wells by suddenly exerting pressure in excess of said rock failure pressure in said fracturing means simultaneously to produce a single interconnecting fracture of large surface area connecting said wells for hydraulic communication.
Claim 3
Dependent Claim
23 words
The process of claim 1, wherein an explosive means is employed to induce said sudden exertion of high pressure in the fracturing means.
Claim 4
Dependent Claim
23 words
The process of claim 2, wherein a hydraulic ram is employed to induce said sudden exertion of high pressure in the fracturing means.
References Cited (Backward Citations)
US2676662A
Cited
US3002454A
Cited
US3270816A
Cited
US3313348A
Cited
US3400762A
Cited
US3637020A
Cited
US3709295A
Cited
US3878884A
Cited
US3835928A
Cited
US3848674A
Cited
US3863709A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-04-29 | 1983-10-29 | 1984-04-29 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-04-29 | 1987-10-29 | 1988-04-29 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-04-29 | 1991-10-29 | 1992-04-29 | $7700.00 | Window Closed / Lapsed |