Patent US4196576A successfully refreshed from Google Patents.
US4196576A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for S-Z twisting of electrical cables
Assignee: Siemens AG
•
Filing: 1978-06-06
•
Granted: 1980-04-08
•
Expires: 1998-06-06
Abstract
Abstract In order to avoid troublesome length differences between the core and the outer layer in the S-Z twisting of five or more elements to be twisted, the average value of the input twist is chosen equal to the average value of the resulting S and Z twist.
Inventors
- 👤 Dieter Vogelsberg
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-02 20:42
CPC Classifications
H; H01; H01B; H01B13/00; H01B13/02; H01B13/04
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
171 words
In a method for twisting elements to be twisted of electrical conductors or electrical cables to form a stranded unit with a twist direction changing at intervals, in which the elements to be twisted, which run off from stationary supplies with constant velocity, run through an SZ twisting equipment continuously and leave the SZ twisting equipment with constant velocity, are twisted a first time when entering the SZ twisting equipment and are twisted at least a second time when leaving the SZ twisting equipment, and in which the superposition of the twists obtained in the SZ twisting equipment leads to a resulting twist with a twist direction changing at intervals, the improvement comprising making the amount of twist executed when the elements to be twisted enter the SZ twisting equipment or its average value, equal or approximately equal to the average value of the amount of the resulting S and Z twist of the stranded unit or the average value of the amounts of the resulting average S and Z twist.
Claim 2
Dependent Claim
171 words
In a method for twisting elements to be twisted of electrical conductors or electrical cables to form a stranded unit with a twist direction changing at intervals, in which the elements to be twisted, which run off from stationary supplies with constant velocity, run through an SZ twisting equipment continuously and leave the SZ twisting equipment with constant velocity, are twisted a first time when entering the SZ twisting equipment and are twisted at least a second time when leaving the SZ twisting equipment, and in which the superposition of the twists obtained in the SZ twisting equipment leads to a resulting twist with a twist direction changing at intervals, the improvement comprising making the amount of twist executed when the elements to be twisted enter the SZ twisting equipment or its average value, equal or approximately equal to the average value of the amount of the resulting S and Z twist of the stranded unit or the average value of the amounts of the resulting average S and Z twist.
Claim 3
Dependent Claim
56 words
The method according to claim 1, in which the elements to be twisted are twisted in the SZ twisting equipment once or several times with a direction changing at intervals, wherein the improvement further comprises holding the direction and amount of the twist executed, when the elements to be twisted enter the SZ twisting equipment, constant.
Claim 4
Dependent Claim
80 words
The method according to claim 1, in which the elements to be twisted run through the SZ twisting equipment in stretched condition and are twisted with constant direction when entering the SZ twisting equipment and are twisted also with constant, but opposite direction when leaving the SZ twisting equipment, and in which the magnitude of the twisting is changed at intervals, wherein the improvement further comprises changing the magnitude of the twisting in a ratio of between 1:2 and 1:5.
Claim 5
Dependent Claim
16 words
The method of claim 3 wherein said magnitude is changed in a ratio of about 1:3.
Claim 6
Dependent Claim
43 words
The method according claim 1 including twisting more than five elements to be twisted, especially twisting conductors for control cables, twisting pairs of conductors to form base bundles, twisting base bundles into main bundles and twisting wires into stranded wire or conductor rope.
Claim 7
Dependent Claim
224 words
In apparatus for twisting elements to be twisted of electric conductors or electric cables to form a stranded unit with a twist direction changing at intervals which includes; stationary supplies for the elements to be twisted; SZ twisting equipment including a first twisting point, a second twisting point and means disposed therebetween and cooperating with said first and second twisting points for twisting said elements a first time when entering said equipment and a second time when leaving said equipment in such a manner that the superpositions of the twists obtain therein leads to a resulting twist with a twist direction changing at intervals, said means cooperating with said twisting points including at least a first twisting head; and means for drawing said elements off said stationary supplies and causing them to run through said SZ twisting equipment continuously such that they enter and leave said SZ twisting equipment with a constant velocity, the improvement comprising an additional twisting head which grips the elements to be twisted from the outside with a friction force, rotating with a constant speed and direction, disposed before said means for twisting, the rotational speed of said additional twisting head being such that it imparts a twist to said elements to be twisted which is equal to the average of the resulting SZ twist imparted by said twisting device.
Claim 8
Dependent Claim
224 words
In apparatus for twisting elements to be twisted of electric conductors or electric cables to form a stranded unit with a twist direction changing at intervals which includes; stationary supplies for the elements to be twisted; SZ twisting equipment including a first twisting point, a second twisting point and means disposed therebetween and cooperating with said first and second twisting points for twisting said elements a first time when entering said equipment and a second time when leaving said equipment in such a manner that the superpositions of the twists obtain therein leads to a resulting twist with a twist direction changing at intervals, said means cooperating with said twisting points including at least a first twisting head; and means for drawing said elements off said stationary supplies and causing them to run through said SZ twisting equipment continuously such that they enter and leave said SZ twisting equipment with a constant velocity, the improvement comprising an additional twisting head which grips the elements to be twisted from the outside with a friction force, rotating with a constant speed and direction, disposed before said means for twisting, the rotational speed of said additional twisting head being such that it imparts a twist to said elements to be twisted which is equal to the average of the resulting SZ twist imparted by said twisting device.
Claim 9
Dependent Claim
21 words
The improvement according to claim 6 wherein said twisting head is disposed between the first twisting point and said twisting device.
Claim 10
Dependent Claim
18 words
The improvement according to claim 6 wherein said twisting head is disposed ahead of said first twisting point.
References Cited (Backward Citations)
US3491525A
Cited
US3481127A
Cited
US3593509A
Cited
US3782092A
Cited
US3823536A
Cited
US3884024A
Cited
US4056925A
Cited
DE2458353A1
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1983-04-08 | 1983-10-08 | 1984-04-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1987-04-08 | 1987-10-08 | 1988-04-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1991-04-08 | 1991-10-08 | 1992-04-08 | $7700.00 | Window Closed / Lapsed |