Patent US4192182A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4192182A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for performing step rate tests on injection wells

Assignee: Individual
•
Filing: 1978-11-16
•
Granted: 1980-03-11
•
Expires: 1998-11-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method for performing step rate tests on injection wells, including inserting a portable pumping unit to receive the water or other fluid normally injected into the well and controlling its pressure, and then increasing the pressure of the injection fluid to a predetermined pressure by use of the portable pumping unit to determine fluid flow at said predetermined pressure, the fluid at the predetermined pressure being pumped continuously until a stable flow rate is achieved. The procedure is repeated for plural stepwisely increased pressure points at each side of the fracture pressure, whereby the fracture pressure is accurately determined.

Inventors

  • 👤 G. Clay Sylvester

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 18:57
CPC Classifications
E; E21; E21B; E21B49/00; E21B49/008; E21B43/00; E21B43/16; E21B43/17; E21B43/25; E21B43/26; E21B43/2607; E21B49/006

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 219 words
Method for performing step rate tests on injection wells of the type into which water is injected by an injection pump to drive petroleum materials through a subterranean formation toward a production well, there being plural conduit means each leading from a manifold at said injection pump to an injection well, comprising breaking one of said conduit means leading from said injection pump to a single injection well, connecting a portable pumping unit across said break in series with said one conduit, controlling the pressure of water delivered by said injection pump through said one conduit means to the inlet of said portable pumping unit, operating said portable pumping unit to increase the pressure of said water delivered thereto from said controlled pressure to an injection pressure, delivering said water at said injection pressure through said single injection well into said formation while monitoring at least one of the flow rate and injection pressure thereof until the flow rate and injection pressure become at least substantially constant, repeating the described injection procedure at different flow rates and injection pressures below and above the fracture pressure of said single injection well and determining constant flow rates and injection pressures at plural levels, and determining the fracture pressure of the formation from the difference in flow rates at different injection pressures.
Claim 2
Dependent Claim 219 words
Method for performing step rate tests on injection wells of the type into which water is injected by an injection pump to drive petroleum materials through a subterranean formation toward a production well, there being plural conduit means each leading from a manifold at said injection pump to an injection well, comprising breaking one of said conduit means leading from said injection pump to a single injection well, connecting a portable pumping unit across said break in series with said one conduit, controlling the pressure of water delivered by said injection pump through said one conduit means to the inlet of said portable pumping unit, operating said portable pumping unit to increase the pressure of said water delivered thereto from said controlled pressure to an injection pressure, delivering said water at said injection pressure through said single injection well into said formation while monitoring at least one of the flow rate and injection pressure thereof until the flow rate and injection pressure become at least substantially constant, repeating the described injection procedure at different flow rates and injection pressures below and above the fracture pressure of said single injection well and determining constant flow rates and injection pressures at plural levels, and determining the fracture pressure of the formation from the difference in flow rates at different injection pressures.
Claim 3
Dependent Claim 66 words
Method according to claim 1, wherein said portable pumping unit is provided to include a control valve and a surge tank and a positive displacement pump and a flow meter in series, and wherein said portable pumping unit is connected across said break whereby water delivered by said injection pump is delivered through said control valve to said surge tank before reaching said positive displacement pump.
Claim 4
Dependent Claim 44 words
Method according to claim 2, wherein a baffle is provided across said surge tank between the inlet and outlet thereof, said surge tank pressure being controlled by said control valve to a constant low pressure sufficient for proper operation of said positive displacement pump.
Claim 5
Dependent Claim 23 words
Method according to claim 3, said constant low pressure being from somewhat above zero pressure upward to about 200 pounds per square inch.
Claim 6
Dependent Claim 32 words
Method according to claim 1, 2, 3, or 4, wherein said selected injection pressures are in the range from about 20 pounds per square inch to about 3000 pounds per square inch.
Claim 7
Dependent Claim 25 words
Method according to claim 1, 2, 3, or 4, wherein said constant flow rates are in the range up to about 3000 barrels per day.
Claim 8
Dependent Claim 24 words
Method according to claim 1, 2, 3, or 4, including transporting said portable pumping unit to the injection well site on a movable vehicle.
Claim 9
Dependent Claim 28 words
Method according to claim 1, 2, 3, or 4, including recoupling said one of said conduit means at said break after said step rate test has been completed.
Claim 10
Dependent Claim 112 words
Method according to claim 1, 2, 3, or 4, including plotting each said constant flow rate on a graph versus the selected injection pressure corresponding thereto, drawing a first straight line on said graph at the location and slope indicated by said determinations at selected injection pressures below said fracture pressure of said single injection well and drawing a second straight line on said graph at the location and slope indicated by said determinations at selected injection pressures above said fracture pressure of said single injection well, and reading said fracture pressure of said single injection well from said graph at the point of intersection of said first and second straight lines.

References Cited (Backward Citations)

US3338095A Cited
US3636762A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1983-03-11 1983-09-10 1984-03-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1987-03-11 1987-09-10 1988-03-11 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1991-03-11 1991-09-10 1992-03-11 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag