Abstract
Abstract When surveying a borehole using an instrument responsive to the earth's magnetic field, the assumption is made that the error vector which comprises the difference between the true earth's magnetic field and the measured magnetic field in the borehole is in the direction of the borehole axis. The magnitude of this error vector is determined and used to correct the magnetically measured azimuth.
Inventors
- 👤 Michael K. Russell
- 👤 Anthony W. Russell
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-02 19:45
CPC Classifications
E; E21; E21B; E21B47/00; E21B47/02; E21B47/022; G; G01; G01C; G01C17/00; G01C17/02
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
129 words
A method of determining the orientation of a surveying instrument in a borehole comprising the steps of determining the inclination angle of the instrument at the location thereof in the borehole, sensing, at said location, at least one vector component of the local magnetic field to determine the local magnetic field in the direction of a primary axis of the instrument aligned with the borehole, determining the azimuth angle of the instrument relative to the apparent magnetic north direction at said location, ascertaining the true horizontal and vertical components of the earth's magnetic field at the location of the borehole and determining the correction to be applied to the apparent azimuth angle from the true and apparent values for the horizontal and vertical components of the earth's magnetic field.
Claim 2
Independent Claim
129 words
A method of determining the orientation of a surveying instrument in a borehole comprising the steps of determining the inclination angle of the instrument at the location thereof in the borehole, sensing, at said location, at least one vector component of the local magnetic field to determine the local magnetic field in the direction of a primary axis of the instrument aligned with the borehole, determining the azimuth angle of the instrument relative to the apparent magnetic north direction at said location, ascertaining the true horizontal and vertical components of the earth's magnetic field at the location of the borehole and determining the correction to be applied to the apparent azimuth angle from the true and apparent values for the horizontal and vertical components of the earth's magnetic field.
Claim 3
Dependent Claim
67 words
A method of according to claim 1, further comprising the steps of determining the highside angle of the instrument at the location thereof in the borehole and determining, from said sensed components of the local magnetic field, the vertical magnetic field component, the horizontal magnetic field component in the apparent magnetic north direction and the azimuth angle of the instrument relative to said apparent magnetic north direction.
Claim 4
Dependent Claim
57 words
A method according to claim 2, wherein determination of the correction to be applied to the apparent azimuth angle includes calculating the different between the components of the true earth's magnetic field and of the local magnetic field in a single predetermined direction at an angle of less than 90° to the primary axis of the instrument.
Claim 5
Dependent Claim
15 words
A method according to claim 3, wherein said single predetermined direction is the vertical direction.
Claim 6
Dependent Claim
18 words
A method according to claim 3, wherein said single predetermined direction is the primary axis of the instrument.
Claim 7
Dependent Claim
25 words
A method according to claim 2, wherein the vector components of the local magnetic field are determined using three fluxgates oriented in respective non-coplanar directions.
Claim 8
Dependent Claim
23 words
A method according to claim 2, wherein the inclination and highside angles are determined by measuring components of gravity in three non-coplanar directions.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-08-06 | 1983-02-05 | 1983-08-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-08-06 | 1987-02-05 | 1987-08-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-08-06 | 1991-02-05 | 1991-08-07 | $7700.00 | Window Closed / Lapsed |