← Back to Patent Explorer
US4160153A Expired / Lapsed US ⏱️ 0.0 years remaining

Duty cycle shared proportional temperature control

Assignee: Pako Corp
•
Filing: 1977-06-24
•
Granted: 1979-07-03
•
Expires: 1997-06-24
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A system having two heaters, such as a photographic processor with a solution heater and a dryer heater, has proportional controllers for each of the heaters. A priority control co-ordinates operation of the two controllers to give full priority to one of the two heaters during warm up, and a reduced percentage for running conditions. The other heater is allowed to share the remaining available input power.

Inventors

  • 👤 Theodore A. Melander

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 19:26
CPC Classifications
G; G03; G03D; G03D15/00; G03D15/02; G03D15/022; H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02M; H02M1/00; H02M1/08; H02M1/088; H02M1/096; H02J2105/00; H02J2105/50; H02J2105/52; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 18
Claim 1
Independent Claim 104 words
In a processor of photosensitive material having a solution heater and a dryer heater, a control system comprising: solution heater control means for controlling input power provided to the solution heater; dryer heater control means for controlling input power provided to the dryer heater; and priority means for coordinating the operation of the solution heater control means and the dryer heater control means to give the solution heater priority to input power until power demand of the solution heater control means decreases to a predetermined level and then permitting the solution heater control means and the dryer heater control means to share input power.
Claim 2
Dependent Claim 104 words
In a processor of photosensitive material having a solution heater and a dryer heater, a control system comprising: solution heater control means for controlling input power provided to the solution heater; dryer heater control means for controlling input power provided to the dryer heater; and priority means for coordinating the operation of the solution heater control means and the dryer heater control means to give the solution heater priority to input power until power demand of the solution heater control means decreases to a predetermined level and then permitting the solution heater control means and the dryer heater control means to share input power.
Claim 3
Dependent Claim 43 words
The control system of claim 1 wherein the priority means allows the dryer heater to use all input power not used by the solution heater during each operating cycle after power demand of the solution heater control means decreases to the predetermined level.
Claim 4
Dependent Claim 48 words
The control system of claim 1 wherein the solution heater control means comprises: solution temperature sensor means for sensing solution temperature and providing a solution temperature signal; and a solution heater controller for controlling input power provided to the solution heater in response to the solution temperature signal.
Claim 5
Dependent Claim 49 words
The control system of claim 3 wherein the dryer heater control means comprises: dryer temperature sensor means for sensing dryer air temperature and providing a dryer temperature signal; and a dryer heater controller for controlling input power provided to the dryer heater in response to the dryer temperature signal.
Claim 6
Dependent Claim 25 words
The control system of claim 4 wherein the solution heater controller and the dryer heater controller are time proportioning controllers sharing a common time base.
Claim 7
Dependent Claim 125 words
In a system for supplying power to first and second loads, a control system comprising: first and second sensor means for sensing parameters associated with operation of the first and second loads, respectively; first and second controller means for controlling the first and second loads by controlling as a function of signals from the first and second sensor means, first and second time intervals during each operating cycle that input power is supplied to the first and second loads, respectively; and priority means for coordinating operation of the first and second controller means to give priority to the first load and the first controller means and to inhibit the second controller means from commencing the second time interval until the first time interval is completed.
Claim 8
Dependent Claim 125 words
In a system for supplying power to first and second loads, a control system comprising: first and second sensor means for sensing parameters associated with operation of the first and second loads, respectively; first and second controller means for controlling the first and second loads by controlling as a function of signals from the first and second sensor means, first and second time intervals during each operating cycle that input power is supplied to the first and second loads, respectively; and priority means for coordinating operation of the first and second controller means to give priority to the first load and the first controller means and to inhibit the second controller means from commencing the second time interval until the first time interval is completed.
Claim 9
Dependent Claim 39 words
The control system of claim 6 wherein the priority means limits the first time interval to a predetermined percentage of each operating cycle after the first time interval has decreased to the predetermined percentage during any preceding operating cycle.
Claim 10
Dependent Claim 24 words
The control system of claim 6 wherein the first and second loads are heaters and the first and second sensor means are temperature sensors.
Claim 11
Dependent Claim 31 words
The control system of claim 8 wherein the first load is a solution heater for a photographic processor and wherein the second load is a dryer heater for a photographic processor.
Claim 12
Dependent Claim 17 words
The control system of claim 6 wherein the first and second controller means have proportional control bands.
Claim 13
Dependent Claim 142 words
A control system for controlling operation of first and second loads, the control system comprising: first sensor means for sensing a parameter associated with operation of the first load; second sensor means for sensing a parameter associated with operation of the second load; first controller means for controlling the first load by controlling, as a function of signals from the first sensor means, a first time interval during each operating cycle that input power is supplied to the first load; second controller means for controlling the second load by controlling, as a function of signals from the second sensor means, a second time interval during each operating cycle that input power is supplied to the second load; and priority means for inhibiting the second controller means from commencing the second time interval in any operating cycle until the first interval is completed.
Claim 14
Dependent Claim 142 words
A control system for controlling operation of first and second loads, the control system comprising: first sensor means for sensing a parameter associated with operation of the first load; second sensor means for sensing a parameter associated with operation of the second load; first controller means for controlling the first load by controlling, as a function of signals from the first sensor means, a first time interval during each operating cycle that input power is supplied to the first load; second controller means for controlling the second load by controlling, as a function of signals from the second sensor means, a second time interval during each operating cycle that input power is supplied to the second load; and priority means for inhibiting the second controller means from commencing the second time interval in any operating cycle until the first interval is completed.
Claim 15
Dependent Claim 24 words
The control system of claim 11 wherein the first and second loads are heaters and the first and second sensor means are temperature sensors.
Claim 16
Dependent Claim 31 words
The control system of claim 12 wherein the first load is a solution heater for a photographic processor and wherein the second load is a dryer heater for a photographic processor.
Claim 17
Dependent Claim 126 words
In a processor of photosensitive material having a solution heater and a dryer heater, a control system comprising: solution heater control means controlling, on a time proportioning basis, input power provided to the solution heater; dryer heater control means for controlling, on a time proportioning basis, input power provided to the dryer heater; and priority means for coordinating operation of the solution heater control means and the dryer heater control mens to prevent the solution heater and the dryer heater from simultaneously receiving input power, to give the solution heater priority to input power during initial warm up of the solution heater, and to allow the dryer heater to share input power on a duty cycle sharing basis after initial warm up of the solution heater.
Claim 18
Dependent Claim 126 words
In a processor of photosensitive material having a solution heater and a dryer heater, a control system comprising: solution heater control means controlling, on a time proportioning basis, input power provided to the solution heater; dryer heater control means for controlling, on a time proportioning basis, input power provided to the dryer heater; and priority means for coordinating operation of the solution heater control means and the dryer heater control mens to prevent the solution heater and the dryer heater from simultaneously receiving input power, to give the solution heater priority to input power during initial warm up of the solution heater, and to allow the dryer heater to share input power on a duty cycle sharing basis after initial warm up of the solution heater.

References Cited (Backward Citations)

US3153728A Cited
US3243597A Cited
US3296452A Cited
US3519786A Cited
US3586869A Cited
GB1455014A Cited
US3858094A Cited
US3872371A Cited
US3901308A Cited
US4063075A Cited
US4020358A Cited
US4048812A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-07-02 1983-01-01 1983-07-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-07-02 1987-01-01 1987-07-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-07-02 1991-01-01 1991-07-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag