Patent US4154607A successfully refreshed from Google Patents.
US4154607A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for disposal of sodium sludge
Assignee: Albemarle Corp
•
Filing: 1977-11-14
•
Granted: 1979-05-15
•
Expires: 1997-11-14
Abstract
Abstract A process for safely and conveniently disposing of active metal residue, such as a mixture of alkali metal and alkaline earth metal, by introducing the residue into a furnace in which it is completely transformed into harmless metal salts or oxides, which can be disposed of safely and inexpensively.
Inventors
- 👤 Andrew O. Wikman
- 👤 Robert L. Say
- 👤 Robert H. Jones
- 👤 James E. Rogers
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 14:58
CPC Classifications
A; A62; A62D; A62D3/00; A62D3/30; A62D3/38; F; F23; F23G; F23G7/00; F23G7/001; A62D2101/00; A62D2101/40
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
118 words
The process for disposal of sodium sludge which results from the electrolytic manufacture of sodium comprising introducing said sludge into the melt of a reverberatory lead recovery furnace maintained at a temperature greater than about 450° C. over a period of from about 4 to about 16 hours in an oxidizing atmosphere whereby said sludge is substantially completely oxidized and a substantial portion of the sludge oxidation products participate in forming a slag layer within said furnace, tapping off said molten lead and recovering said slag, whereby said sludge oxidation products are removed with and as a part of said slag thereby disposing of said sodium sludge safely, economically and without affecting recovery of lead from said furnace.
Claim 2
Dependent Claim
118 words
The process for disposal of sodium sludge which results from the electrolytic manufacture of sodium comprising introducing said sludge into the melt of a reverberatory lead recovery furnace maintained at a temperature greater than about 450° C. over a period of from about 4 to about 16 hours in an oxidizing atmosphere whereby said sludge is substantially completely oxidized and a substantial portion of the sludge oxidation products participate in forming a slag layer within said furnace, tapping off said molten lead and recovering said slag, whereby said sludge oxidation products are removed with and as a part of said slag thereby disposing of said sodium sludge safely, economically and without affecting recovery of lead from said furnace.
Claim 3
Dependent Claim
21 words
The process of claim 1 in which said furnace is maintained at a temperature from about 600° to about 950° C.
Claim 4
Dependent Claim
28 words
The process of claim 1 in which said furnace is operated with an oxidizing atmosphere internally and at a temperature of from about 700° to about 850° C.
Claim 5
Dependent Claim
30 words
The process of claim 1 in which said sludge and/or the oxidation products thereof are maintained in said furnace for a period of from about 6 to about 10 hours.
Claim 6
Dependent Claim
27 words
The process of claim 1 in which from about 0.1 to about 50 parts of said sludge per thousand parts of the furnace feed material are employed.
Claim 7
Dependent Claim
53 words
The process of claim 1 further characterized in that a portion of said oxidation products which are formed in said furnace are entrained with the furnace flue gases and contacting said products with water whereby a major amount of said portion is removed from the flue gases and prevented from entering the atmosphere.
Claim 8
Dependent Claim
36 words
The process of claim 1 further characterized by treatment of said slag with water in atmospheric leach pits to remove water soluble salts and sending the leached slag for secondary recovery of the contained lead content.
Claim 9
Dependent Claim
32 words
The process of claim 1 wherein said sludge, prior to treatment thereof in said furnace, is collected from a sodium sludge filter, cooled, transported to said furnace and stored in weather-proof containers.
Claim 10
Dependent Claim
18 words
The process of claim 1 wherein said sludge is introduced into said furnace in a central portion thereof.
References Cited (Backward Citations)
US2899296A
Cited
CA836447A
Cited
US2029998A
Cited
US2054316A
Cited
US2073631A
Cited
US2691575A
Cited
US2759896A
Cited
US2689791A
Cited
US2765328A
Cited
US2863757A
Cited
US3052535A
Cited
US3188199A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-05-14 | 1982-11-13 | 1983-05-15 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-05-14 | 1986-11-13 | 1987-05-15 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-05-14 | 1990-11-13 | 1991-05-15 | $7700.00 | Window Closed / Lapsed |