Patent US4390075A successfully refreshed from Google Patents.
Patent US4150546A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4150546A Expired / Lapsed US ⏱️ 0.0 years remaining

Method and apparatus for load following with a single-cycle boiling moderator-coolant nuclear reactor

Assignee: General Electric Co
•
Filing: 1976-12-03
•
Granted: 1979-04-24
•
Expires: 1996-12-03
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The invention is directed to a method and apparatus for providing a single-cycle boiling moderator-coolant nuclear reactor which accommodates changes in demand with a turbine generator on direct governor control. Current single-cycle boiling moderator-coolant nuclear reactors employ turbine generators that are slaved to the reactor. This arrangement is dictated because of inherent response limitations of the single-cycle boiling moderator-coolant nuclear reactor. The system of the present invention diverts steam from steam consuming normal auxiliary plant equipment to maintain reactor pressure when a rapid increase in turbine power demand is made such as during a daily load following or a frequency regulation change in demand. This allows the turbine generator to be placed on direct governor control. Rapid positive or negative demands accepted by the turbine cause a decrease or an increase in the pressure of the reactor. Reactor pressure is monitored by a pressure regulator which in the case of a rapid increase in demand throttles steam normally directed to feedwater heaters or steam reheaters and redirects the steam to the turbine. In the case of a rapid decrease in demand the pressure regulator by-passes a portion of the primary flow of steam to a condenser. Steam is redirected or by-passed until the reactor has time to respond to the change in demand.

Inventors

  • 👤 Wells I. Collett

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 14:01
CPC Classifications
G; G21; G21D; G21D3/00; G21D3/08; G21D3/12; G21D3/14; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 24
Claim 1
Independent Claim 191 words
In a power plant of the type wherein a turbine is driven by a primary flow of steam at a predetermined pressure from a single-cycle boiling moderator-coolant nuclear reactor, said reactor having means to vary moderator-coolant recirculation flow, to vary reactor power and said power plant including a secondary flow of steam for heating steam utilizing auxiliary plant equipment, a method for load following comprising the steps of: adjusting said primary flow of steam from said reactor to said turbine for changing demands for turbine power; adjusting said moderator-coolant recirculation flow through the reactor in response to changing demands for turbine power; monitoring the pressure of said primary flow of steam; reducing said secondary flow of steam to said steam utilizing auxiliary plant equipment, in the case of a rapid increase in turbine demand that causes a decrease in the pressure of the primary flow of steam, thereby maintaining said pressure and preventing a decrease in turbine power; and restoring said secondary flow of steam to said auxiliary plant equipment after adjustment of said moderator-coolant recirculation flow has increased reactor power and increased the pressure of said primary flow of steam.
Claim 2
Dependent Claim 191 words
In a power plant of the type wherein a turbine is driven by a primary flow of steam at a predetermined pressure from a single-cycle boiling moderator-coolant nuclear reactor, said reactor having means to vary moderator-coolant recirculation flow, to vary reactor power and said power plant including a secondary flow of steam for heating steam utilizing auxiliary plant equipment, a method for load following comprising the steps of: adjusting said primary flow of steam from said reactor to said turbine for changing demands for turbine power; adjusting said moderator-coolant recirculation flow through the reactor in response to changing demands for turbine power; monitoring the pressure of said primary flow of steam; reducing said secondary flow of steam to said steam utilizing auxiliary plant equipment, in the case of a rapid increase in turbine demand that causes a decrease in the pressure of the primary flow of steam, thereby maintaining said pressure and preventing a decrease in turbine power; and restoring said secondary flow of steam to said auxiliary plant equipment after adjustment of said moderator-coolant recirculation flow has increased reactor power and increased the pressure of said primary flow of steam.
Claim 3
Dependent Claim 22 words
The method of claim 1, wherein said secondary flow of steam comprises a portion of said primary flow of steam branched therefrom.
Claim 4
Dependent Claim 20 words
The method of claim 1, wherein said secondary flow of steam comprises a flow of extraction steam from said turbine.
Claim 5
Dependent Claim 31 words
The method of claim 1, wherein said secondary flow of steam includes a portion of said primary flow of steam branched therefrom and a flow of extraction steam from said turbine.
Claim 6
Dependent Claim 44 words
The method of claim 4, wherein said portion of said primary flow of steam and said flow of extraction steam are sequentially reduced and sequentially restored, said portion of said primary flow of steam being first to be reduced and last to be restored.
Claim 7
Dependent Claim 47 words
The method of claim 1, wherein said auxiliary plant equipment includes a reheater, said reheater being reheated by said secondary flow of steam, thereby utilizing the heat capacitance of said reheater to maintain the pressure of said primary flow of steam during a rapid increase in demand.
Claim 8
Dependent Claim 50 words
The method of claim 1, wherein said auxiliary plant equipment includes a feedwater heater, said feedwater heater being heated by said secondary flow of steam, thereby utilizing the heat capacitance of said feedwater heater to maintain the pressure of said primary flow of steam during a rapid increase in demand.
Claim 9
Dependent Claim 106 words
The method of claim 1, wherein said power plant includes a condenser, the method further including the steps of: by-passing a portion of said primary flow of steam to said condenser, in the case of a rapid decrease in steam demand that causes an increase in the pressure of the primary flow of steam, thereby maintaining said pressure and preventing a turbine power increase by utilizing the heat capacitance of said condenser; and continuing the by-pass of said portion of said primary flow of steam until adjustment of said moderator-coolant recirculation flow has decreased reactor power and decreased the pressure of said primary flow of steam.
Claim 10
Dependent Claim 229 words
In a power plant of the type wherein a turbine is driven by a primary flow of steam at a predetermined pressure from a single-cycle boiling moderator-coolant nuclear reactor, said reactor including means to vary moderator-coolant recirculation flow to vary reactor power, and said power plant including a secondary flow of steam for heating steam utilizing auxiliary plant equipment, a load following system comprising: a turbine governor responsive to changing demands for turbine power; a primary steam control valve responsive to said governor for adjusting said primary flow of steam in response to said changing demands for turbine power; recirculation flow control means responsive to said governor for adjusting said moderator-coolant recirculation flow through said reactor in response to said changing demands for turbine power; a pressure regulator for monitoring the pressure of said primary flow of steam at a point upstream of said primary steam control valve; and secondary flow control means responsive to said pressure regulator for (i) reducing said secondary flow of steam, in the case of a rapid increase in turbine demand that causes a decrease in the pressure of the primary flow of steam, thereby maintaining said pressure and preventing a decrease in turbine power, and (ii) restoring said secondary flow of steam after adjustment of said moderator-coolant recirculation flow has increase reactor power and increased the pressure of said primary flow of steam.
Claim 11
Dependent Claim 229 words
In a power plant of the type wherein a turbine is driven by a primary flow of steam at a predetermined pressure from a single-cycle boiling moderator-coolant nuclear reactor, said reactor including means to vary moderator-coolant recirculation flow to vary reactor power, and said power plant including a secondary flow of steam for heating steam utilizing auxiliary plant equipment, a load following system comprising: a turbine governor responsive to changing demands for turbine power; a primary steam control valve responsive to said governor for adjusting said primary flow of steam in response to said changing demands for turbine power; recirculation flow control means responsive to said governor for adjusting said moderator-coolant recirculation flow through said reactor in response to said changing demands for turbine power; a pressure regulator for monitoring the pressure of said primary flow of steam at a point upstream of said primary steam control valve; and secondary flow control means responsive to said pressure regulator for (i) reducing said secondary flow of steam, in the case of a rapid increase in turbine demand that causes a decrease in the pressure of the primary flow of steam, thereby maintaining said pressure and preventing a decrease in turbine power, and (ii) restoring said secondary flow of steam after adjustment of said moderator-coolant recirculation flow has increase reactor power and increased the pressure of said primary flow of steam.
Claim 12
Dependent Claim 23 words
The power plant of claim 9, wherein said secondary flow of steam comprises a portion of said primary flow of steam branched therefrom.
Claim 13
Dependent Claim 21 words
The power plant of claim 9, wherein said secondary flow of steam comprises a flow of extraction steam from said turbine.
Claim 14
Dependent Claim 32 words
The power plant of claim 9, wherein said secondary flow of steam includes a portion of said primary flow of steam branched therefrom and a flow of extraction steam from said turbine.
Claim 15
Dependent Claim 45 words
The power plant of claim 12, wherein said portion of said primary flow of steam and said flow of extraction steam are sequentially reduced and sequentially restored, said portion of said primary flow of steam being first to be reduced and last to be restored.
Claim 16
Dependent Claim 48 words
The power plant of claim 9, wherein said auxiliary plant equipment includes a reheater, said reheater being heated by said secondary flow of steam, thereby utilizing the heat capacitance of said reheater to maintain the pressure of said primary flow of steam during a rapid increase in demand.
Claim 17
Dependent Claim 51 words
The power plant of claim 9, wherein said auxiliary plant equipment includes a feedwater heater, said feedwater heater being heated by said secondary flow of steam, thereby utilizing the heat capacitance of said feedwater heater to maintain the pressure of said primary flow of steam during a rapid increase in demand.
Claim 18
Dependent Claim 110 words
The power plant of claim 9, further including: a condenser and by-pass flow control means responsive to said pressure regulator for (i) by-passing a portion of said primary flow of steam to said condenser, in the case of a rapid decrease in steam demand that causes an increase in the pressure of the primary flow of steam thereby maintaining said pressure and preventing a turbine power increase by utilizing the heat capacitance of said condenser, and (ii) continuing the by-pass of a portion of said primary flow of steam until adjustment of said moderator-coolant recirculation flow has decreased reactor power and decreased the pressure of said primary flow of steam.
Claim 19
Dependent Claim 32 words
The power plant of claim 16, wherein said secondary flow of steam includes a portion of said primary flow of steam branched therefrom and a flow of extraction steam from said turbine.
Claim 20
Dependent Claim 133 words
The power plant of claim 9, further including: a main steam line for delivering said primary flow of steam from said reactor to said turbine; said primary steam control valve being disposed in said main steam line; said pressure regulator sensing the pressure in said main steam line at a point upstream from said primary steam control valve; and a header disposed in said main steam line at a point upstream of said primary steam control valve; said secondary flow control means comprising: (i) a secondary steam line connecting said auxiliary plant equipment to said header, and (ii) a secondary steam control valve responsive to said pressure regulator disposed in said secondary steam line for sequentially reducing and restoring said secondary flow of steam in the case of a rapid increase in demand.
Claim 21
Dependent Claim 192 words
The power plant of claim 16, further including: a main steam line for delivering said primary flow of steam from said reactor to said turbine; said primary steam control valve being disposed in said main steam line; said pressure regulator sensing the pressure in said main steam line at a point upstream from said primary steam control valve; and a header disposed in said main steam line at a point upstream of said primary steam control valve; said secondary flow control means comprising: (i) a secondary steam line connecting said auxiliary plant equipment to said header, and (ii) a secondary steam control valve responsive to said pressure regulator disposed in said secondary steam line for sequentially reducing and restoring said secondary flow of steam in the case of a rapid increase in demand, and said by-pass flow control means comprising: (i) a primary steam by-pass line connecting said condenser to said header, and (ii) a primary steam by-pass control valve responsive to said pressure regulator disposed in said primary steam by-pass line for sequentially opening said by-pass line and closing said by-pass line in the case of a rapid decrease in demand.
Claim 22
Dependent Claim 245 words
The power plant of claim 17, further including: a main steam line for delivering said primary flow of steam from said reactor to said turbine; said primary steam control valve being disposed in said main steam line; said pressure regulator sensing the pressure in said main steam line at a point upstream from said primary steam control valve; and a header disposed in said main steam line at a point upstream of said primary steam control valve; said secondary flow control means comprising: (i) a secondary steam line connecting said auxiliary plant equipment to said header, (ii) a secondary steam control valve responsive to said pressure regulator disposed in said secondary steam line for sequentially reducing and restoring said portion of said primary flow of steam branched therefrom in the case of a rapid increase in demand, (iii) an extraction steam line connecting said auxiliary plant equipment to said turbine, and (iv) an extraction steam control valve responsive to said pressure regulator disposed in said extraction steam line for sequentially reducing and restoring said flow of extraction steam in the case of a rapid increase in demand; and said by-pass flow control means comprising: (i) a primary steam by-pass line connecting said condenser to said header, and (ii) a primary steam by-pass control valve responsive to said pressure regulator disposed in said primary steam by-pass for sequentially opening said by-pass line and closing said by-pass line in the case of a rapid decrease in demand.
Claim 23
Dependent Claim 61 words
The power plant of claim 20, wherein said auxiliary plant equipment includes a reheater, said reheater being heated by said secondary flow of steam, thereby utilizing the heat capacitance of said reheater to maintain the pressure of said primary flow of steam, to provide rapid load following and to prevent a decrease in reactor power during a rapid increase in demand.
Claim 24
Dependent Claim 64 words
The power plant of claim 20, wherein said auxiliary plant equipment includes a feedwater heater, said feedwater heater being heated by said secondary flow of steam, thereby utilizing the heat capacitance of said feedwater heater to maintain the pressure of said primary flow of steam, to provide rapid load following and to prevent a decrease in reactor power during a rapid increase in demand.

References Cited (Backward Citations)

US1499697A Cited
US1728375A Cited
US3271953A Cited
US3630839A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-04-23 1982-10-23 1983-04-24 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-04-23 1986-10-23 1987-04-24 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-04-23 1990-10-23 1991-04-24 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag