Patent US4143922A successfully refreshed from Google Patents.
US4143922A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of multiple point injection for slurry pipelines
Assignee: Consolidation Coal Co
•
Filing: 1978-01-12
•
Granted: 1979-03-13
•
Expires: 1998-01-12
Abstract
Abstract A method for maintaining suitable velocity or velocity range in a slurry pipeline system of the type with a water pipeline return and slurried material pipeline output with more than one slurry injection point. A single set of primary pipelines, one water and one slurry, is able to serve multiple points of hydraulic injection by means of slurry pipeline flowmeters downstream from each slurry injection water bypass junction, with each flowmeter actuating water control valves to bypass water to the slurry pipeline at the respective junction so as to maintain slurry pipeline velocity within prescribed limits.
Inventors
- 👤 William T. Sweeney
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 09:22
CPC Classifications
B; B65; B65G; B65G53/00; B65G53/30
Claims Analysis
Total Claims: 10
Claim 1
Independent Claim
84 words
A method for injecting particulated solids from more than one source into a slurry and water return primary pipeline system, comprising the steps of: connecting each source via a slurry and water line to said respective slurry and water return primary pipelines; and sensing the velocity of flow of the slurry primary pipeline downstream from each source slurry line connection and controlling the velocity of flow of water from the water primary pipeline directly into the slurry primary pipeline in approximate inverse proportion thereto.
Claim 2
Independent Claim
84 words
A method for injecting particulated solids from more than one source into a slurry and water return primary pipeline system, comprising the steps of: connecting each source via a slurry and water line to said respective slurry and water return primary pipelines; and sensing the velocity of flow of the slurry primary pipeline downstream from each source slurry line connection and controlling the velocity of flow of water from the water primary pipeline directly into the slurry primary pipeline in approximate inverse proportion thereto.
Claim 3
Dependent Claim
36 words
A method as set forth in claim 1 which further includes the steps of: reducing the diameter of the water return primary pipeline by a pre-set amount downstream from the water line junction at each source.
Claim 4
Dependent Claim
38 words
A method as set forth in claim 1 which is further characterized to include the steps of: expanding the diameter of the slurry primary pipeline by a pre-set amount downstream from the slurry line junction at each source.
Claim 5
Dependent Claim
38 words
A method as set forth in claim 2 which is further characterized to include the steps of: expanding the diameter of the slurry primary pipeline by a pre-set amount downstream from the slurry line junction at each source.
Claim 6
Independent Claim
184 words
A system for transporting a slurry of particulated solids as injected at more than one source to a selected terminal, comprising: a primary pipeline including a slurry pipeline and water pipeline return extending from the source area to a selected terminal; at least two sources each functioning to form slurried particulate material; at least two water lines connected to said water pipeline and extending in parallel from said water pipeline to respective sources; at least two slurry lines connected to said slurry pipeline and extending in parallel from said sources to said slurry pipeline; at least two flow sensing means connected to sense velocity of flow in said slurry pipeline; each flow sensing means being connected downstream of the connection of each slurry line to said slurry pipeline and to provide representative electrical signal output; and at least two bypass conduits including flow controlling control valves connected between said water pipeline and said slurry pipeline; each bypass conduit being connected to said water pipeline downstream of each water line, said control valves controlling water flow therethrough in accordance with said representative electrical output signals.
Claim 7
Independent Claim
184 words
A system for transporting a slurry of particulated solids as injected at more than one source to a selected terminal, comprising: a primary pipeline including a slurry pipeline and water pipeline return extending from the source area to a selected terminal; at least two sources each functioning to form slurried particulate material; at least two water lines connected to said water pipeline and extending in parallel from said water pipeline to respective sources; at least two slurry lines connected to said slurry pipeline and extending in parallel from said sources to said slurry pipeline; at least two flow sensing means connected to sense velocity of flow in said slurry pipeline; each flow sensing means being connected downstream of the connection of each slurry line to said slurry pipeline and to provide representative electrical signal output; and at least two bypass conduits including flow controlling control valves connected between said water pipeline and said slurry pipeline; each bypass conduit being connected to said water pipeline downstream of each water line, said control valves controlling water flow therethrough in accordance with said representative electrical output signals.
Claim 8
Dependent Claim
31 words
A system as set forth in claim 5 which is further characterized to include: at least two pipe size reducers each connected in said water pipeline downstream from each bypass conduit.
Claim 9
Dependent Claim
32 words
A system as set forth in claim 5 which is further characterized to include: at least two pipe size expansions located in said slurry pipeline immediately downstream of each slurry line connection.
Claim 10
Dependent Claim
32 words
A system as set forth in claim 6 which is further characterized to include: at least two pipe size expansions located in said slurry pipeline immediately downstream of each slurry line connection.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1982-03-12 | 1982-09-11 | 1983-03-13 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1986-03-12 | 1986-09-11 | 1987-03-13 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1990-03-12 | 1990-09-11 | 1991-03-13 | $7700.00 | Window Closed / Lapsed |