Patent US4134073A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4134073A Expired / Lapsed US ⏱️ 0.0 years remaining

Clock system having adaptive synchronization feature

Assignee: Bull HN Information Systems Inc
•
Filing: 1976-07-12
•
Granted: 1979-01-09
•
Expires: 1996-07-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A clock cycle is provided by a delay device, the output of which is coupled via an inverter to the input thereof, which inverter is combined in a gate structure so as to enable such clock cycle and derivative clock pulses coupled to be generated as a signal passes through the delay device. The gate structure is coupled to receive a so-called stall signal inhibiting the clock system from generating an output. The stall signal so inhibits such clock system only after the present clock cycle is completed. Further, the gate structure is coupled so that a stall signal received and then cleared before the end of the clock cycle will have no effect on the system. The system also responds to a removal or clearing of a stall signal by immediately beginning another clock cycle after the relatively insignificant delay introduced by the gate structure.

Inventors

  • 👤 William W. MacGregor

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 12:59
CPC Classifications
G; G06; G06F; G06F1/00; G06F1/04; G06F1/10

Claims Analysis

Total Claims: 17
Claim 1
Independent Claim 262 words
A clock system comprising: A. delay means having a delay period, said delay means having an input and an output; B. means, including said delay means, for generating a clock cycle which is at least two said delay periods in duration; C. logic means, coupled with said delay means, for producing a clock pulse during said clock cycle, said clock pulse having a duration which is less than that of said clock cycle; D. gate means having a control input, said gate means comprising 1. first and second gate elements, each having first and second inputs and an output, wherein the first input of said second gate element is said control input, 2. means for coupling the output of said delay means to the first input of said first gate element, 3. means for coupling the input of said delay means and the output of said first gate element to the second input of said second gate element, and 4. means for coupling the output of said second gate element to the second input of said first gate element; and E. means for receiving a control signal at said control input of said gate means, said control signal having either a first level or a second level, said first level operative to enable said clock system to generate said clock cycle and said second level operative to disable said system from generating said clock cycle, whereby said clock cycle is initiated in a minimum period of time following the transition of said control signal from said second level to said first level.
Claim 2
Dependent Claim 262 words
A clock system comprising: A. delay means having a delay period, said delay means having an input and an output; B. means, including said delay means, for generating a clock cycle which is at least two said delay periods in duration; C. logic means, coupled with said delay means, for producing a clock pulse during said clock cycle, said clock pulse having a duration which is less than that of said clock cycle; D. gate means having a control input, said gate means comprising 1. first and second gate elements, each having first and second inputs and an output, wherein the first input of said second gate element is said control input, 2. means for coupling the output of said delay means to the first input of said first gate element, 3. means for coupling the input of said delay means and the output of said first gate element to the second input of said second gate element, and 4. means for coupling the output of said second gate element to the second input of said first gate element; and E. means for receiving a control signal at said control input of said gate means, said control signal having either a first level or a second level, said first level operative to enable said clock system to generate said clock cycle and said second level operative to disable said system from generating said clock cycle, whereby said clock cycle is initiated in a minimum period of time following the transition of said control signal from said second level to said first level.
Claim 3
Dependent Claim 14 words
A system as in claim 1 wherein said delay means is a delay line.
Claim 4
Dependent Claim 171 words
A system as in claim 1 wherein said logic means comprises: A. first and second gate elements, each having at least first and second inputs and an output and wherein the output of said second gate element is coupled to provide said clock pulse; B. wherein said delay means includes at least a first and a second electrical connection tap, said first tap being closer to said input of said delay means than is said second tap; C. means for coupling said first input of said first gate element to said first tap and said first input of said second gate element to said second tap so that a signal received at said input of said delay means is first received at said first input of said first gate element; D. means for coupling the output of said first gate element to the second input of said second gate element; and E. means for coupling the output of said second gate element to the second input of said first gate element.
Claim 5
Dependent Claim 16 words
A system as in claim 1 wherein said first and second gate elements are NAND gates.
Claim 6
Dependent Claim 56 words
A system as in claim 1 wherein a change in said control signal from said first level to said second level enables said means for generating to complete the generation of said clock cycle, which said clock cycle is being generated at the time said control signal changed from said first level to said second level.
Claim 7
Dependent Claim 99 words
A system as in claim 1 wherein a change in said control signal from said first level to said second level enables said means for generating to continue to generate a present said clock cycle which said present said clock cycle is being generated at the time said control signal changed from said first level to said second level, and wherein a change in said control signal from said second level to said first level during said present said clock cycle enables said means for generating for generating another said clock cycle directly following said present said clock cycle.
Claim 8
Dependent Claim 109 words
A clock system comprising: A. delay means having a delay period, said delay means having an input and an output, said delay means also including at least a first and a second electrical connection tap, said first tap being closer to said input of said delay means than is said second tap; B. means, including said delay means, for generating a clock cycle which is at least two said delay periods in duration; C. logic means, coupled with said delay means, for producing a clock pulse during said clock cycle, said clock pulse having a duration which is less than that of said clock cycle, said logic means comprising
Claim 9
Dependent Claim 109 words
A clock system comprising: A. delay means having a delay period, said delay means having an input and an output, said delay means also including at least a first and a second electrical connection tap, said first tap being closer to said input of said delay means than is said second tap; B. means, including said delay means, for generating a clock cycle which is at least two said delay periods in duration; C. logic means, coupled with said delay means, for producing a clock pulse during said clock cycle, said clock pulse having a duration which is less than that of said clock cycle, said logic means comprising
Claim 10
Dependent Claim 219 words
first and second gate elements, each having at least first and second inputs and an output and wherein the output of said second gate element is coupled to provide said clock pulse, 2. means for coupling said first input of said first gate element to said first tap and said first input of said second gate element to said second tap so that a signal received at said input of said delay means is first received at said first input of said first gate element, 3. means for coupling the output of said first gate element to the second input of said second gate element, and 4. means for coupling the output of said second gate element to the second input of said first gate element; D. gate means having a control input; E. means for receiving a control signal at said control input of said gate means, said control signal having either a first level or a second level, said first level operative to enable said clock system to generate said clock cycle and said second level to disable said system from generating said clock cycle; F. means, included in said gate means and responsive to a change in said control signal from said second level to said first level, for enabling the generation of said clock cycle.
Claim 11
Dependent Claim 219 words
first and second gate elements, each having at least first and second inputs and an output and wherein the output of said second gate element is coupled to provide said clock pulse, 2. means for coupling said first input of said first gate element to said first tap and said first input of said second gate element to said second tap so that a signal received at said input of said delay means is first received at said first input of said first gate element, 3. means for coupling the output of said first gate element to the second input of said second gate element, and 4. means for coupling the output of said second gate element to the second input of said first gate element; D. gate means having a control input; E. means for receiving a control signal at said control input of said gate means, said control signal having either a first level or a second level, said first level operative to enable said clock system to generate said clock cycle and said second level to disable said system from generating said clock cycle; F. means, included in said gate means and responsive to a change in said control signal from said second level to said first level, for enabling the generation of said clock cycle.
Claim 12
Dependent Claim 79 words
A clock system comprising: A. delay means having an input and an output and an associated delay period; B. gate means having first and second inputs and an output, said gate means comprising 1. a first gate element having first and second inputs and an output, wherein the output of said first gate element is the output of said gate means and wherein the first input of said first gate element is the first input of said gate means,
Claim 13
Dependent Claim 79 words
A clock system comprising: A. delay means having an input and an output and an associated delay period; B. gate means having first and second inputs and an output, said gate means comprising 1. a first gate element having first and second inputs and an output, wherein the output of said first gate element is the output of said gate means and wherein the first input of said first gate element is the first input of said gate means,
Claim 14
Dependent Claim 251 words
a second gate element having first and second inputs and an output, wherein the first input of said second gate element is the second input of said gate means, 3. means for coupling the output of said second gate element to the second input of said first gate element, and 4. means for coupling the output of said first gate element to the second input of said second gate element; C. first means for coupling said output of said delay means to said first input of said gate means; D. second means for coupling said output of said gate means to said input of said delay means; E. means, including said gate means, said delay means and said first and second means for coupling for generating a clock cycle which is at least two said delay periods in duration; and F. means for receiving a control signal at said second input of said gate means, said control signal having either a first or second level, said first level operative to enable said clock system to generate said clock cycle and said second level operative to disable said system from generating said clock cycle, whereby said clock cycle is initiated in a minimum period of time following the transition of said control signal from said second level to said first level and whereby the use of said clock signal enables said clock cycle to provide adaptive synchronization for the transfer of information in a data processing unit which includes said clock system.
Claim 15
Dependent Claim 251 words
a second gate element having first and second inputs and an output, wherein the first input of said second gate element is the second input of said gate means, 3. means for coupling the output of said second gate element to the second input of said first gate element, and 4. means for coupling the output of said first gate element to the second input of said second gate element; C. first means for coupling said output of said delay means to said first input of said gate means; D. second means for coupling said output of said gate means to said input of said delay means; E. means, including said gate means, said delay means and said first and second means for coupling for generating a clock cycle which is at least two said delay periods in duration; and F. means for receiving a control signal at said second input of said gate means, said control signal having either a first or second level, said first level operative to enable said clock system to generate said clock cycle and said second level operative to disable said system from generating said clock cycle, whereby said clock cycle is initiated in a minimum period of time following the transition of said control signal from said second level to said first level and whereby the use of said clock signal enables said clock cycle to provide adaptive synchronization for the transfer of information in a data processing unit which includes said clock system.
Claim 16
Dependent Claim 16 words
A system as in claim 8 wherein said first and second gate elements are NAND gates.
Claim 17
Dependent Claim 39 words
A system as in claim 8 further comprising logic means, coupled with said delay means, for producing a clock pulse during said clock cycle, said clock pulse having a duration which is less than that of said clock cycle.

References Cited (Backward Citations)

US3386036A Cited
US3418498A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1982-01-08 1982-07-10 1983-01-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1986-01-08 1986-07-10 1987-01-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1990-01-08 1990-07-10 1991-01-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag