Patent US4090040A successfully refreshed from Google Patents.
Patent US4129166A successfully refreshed from Google Patents.
US4129166A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Nb3 Ge superconductive films grown with air
Assignee: General Electric Co
•
Filing: 1977-07-18
•
Granted: 1978-12-12
•
Expires: 1997-07-18
Abstract
Abstract A superconductive film of Nb 3 Ge is produced by providing within a vacuum chamber a heated substrate and sources of niobium and germanium, reducing the pressure within the chamber to a residual pressure no greater than about 10 -5 mm Hg, introducing air into the resulting evacuated chamber in controlled amounts and vaporizing the niobium and germanium to deposit a film of Nb 3 Ge on the heated substrate.
Inventors
- 👤 Raymond A. Sigsbee
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 11:48
CPC Classifications
H; H10; H10N; H10N60/00; H10N60/01; H10N60/0184; Y; Y10; Y10S; Y10S420/00; Y10S420/901; Y10S428/00; Y10S428/922; Y10S428/9265; Y10S428/93; Y10S505/00; Y10S505/80; Y10S505/812; Y10S505/813; Y10S505/815; Y10S505/818; Y10S505/819; Y10S505/825; Y10S505/852; Y10S505/912; Y10S505/913; Y10T; Y10T29/00; Y10T29/49; Y10T29/49002; Y10T29/49014; Y10T428/00; Y10T428/12; Y10T428/12431; Y10T428/12438; Y10T428/12493; Y10T428/12771; Y10T428/12806; Y10T428/12861
Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
315 words
A control method of preparing a superconducting film having a critical temperature T c of at least about 19° K. which comprises providing a vacuum chamber with a substrate having at least one substantially smooth surface on which said film is to be deposited, said substrate being at least substantially inert under the conditions of deposition, providing said chamber with a source of niobium and germanium, means for monitoring of niobium flux and germanium flux individually, providing said chamber with a source of air, protecting said substrate surface with a movable protective means which prevents niobium and germanium flux from contacting it, reducing the pressure in said chamber to produce an evacuated chamber with a residual pressure no greater than about 10 -5 mm Hg, heating said substrate to a temperature ranging from 750° C. to 1100° C., vaporizing said niobium and germanium to produce an impinging flux composition ranging from about 1 part to about 3 parts of niobium to about 1 part of germanium, allowing said residual pressure to stabilize at a level no greater than about 10 -5 mm Hg, introducing by a controlled leak of air into said evacuated chamber an incremental air pressure which raises said stabilized pressure in said chamber at least about 0.1 × 10 -5 mm Hg, removing said protective means from said substrate, and impinging said substrate with said niobium and germanium composition forming an adherent superconductive Nb 3 Ge film thereon ranging in composition up to about 2 atomic % from stoichiometric composition, for a constant rate of impingement of said niobium and said germanium on said substrate with increasing substrate temperature from 750° C. to 1100° C. said incremental air pressure increasing up to 5 × 10 -4 mm Hg and said amount of niobium decreasing down to about 1 part, said film having at least a thickness sufficient to form a continuous film.
Claim 2
Dependent Claim
315 words
A control method of preparing a superconducting film having a critical temperature T c of at least about 19° K. which comprises providing a vacuum chamber with a substrate having at least one substantially smooth surface on which said film is to be deposited, said substrate being at least substantially inert under the conditions of deposition, providing said chamber with a source of niobium and germanium, means for monitoring of niobium flux and germanium flux individually, providing said chamber with a source of air, protecting said substrate surface with a movable protective means which prevents niobium and germanium flux from contacting it, reducing the pressure in said chamber to produce an evacuated chamber with a residual pressure no greater than about 10 -5 mm Hg, heating said substrate to a temperature ranging from 750° C. to 1100° C., vaporizing said niobium and germanium to produce an impinging flux composition ranging from about 1 part to about 3 parts of niobium to about 1 part of germanium, allowing said residual pressure to stabilize at a level no greater than about 10 -5 mm Hg, introducing by a controlled leak of air into said evacuated chamber an incremental air pressure which raises said stabilized pressure in said chamber at least about 0.1 × 10 -5 mm Hg, removing said protective means from said substrate, and impinging said substrate with said niobium and germanium composition forming an adherent superconductive Nb 3 Ge film thereon ranging in composition up to about 2 atomic % from stoichiometric composition, for a constant rate of impingement of said niobium and said germanium on said substrate with increasing substrate temperature from 750° C. to 1100° C. said incremental air pressure increasing up to 5 × 10 -4 mm Hg and said amount of niobium decreasing down to about 1 part, said film having at least a thickness sufficient to form a continuous film.
Claim 3
Dependent Claim
17 words
The method according to claim 1 wherein said substrate temperature ranges from 950° C. to 1000° C.
Claim 4
Dependent Claim
14 words
The method according to claim 1 wherein said substrate is removed from said film.
References Cited (Backward Citations)
US3400016A
Cited
US3661639A
Cited
US3630769A
Cited
US4043888A
Cited
US3958327A
Cited
US4005990A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-12-11 | 1982-06-12 | 1982-12-12 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-12-11 | 1986-06-12 | 1986-12-12 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-12-11 | 1990-06-12 | 1990-12-12 | $7700.00 | Window Closed / Lapsed |