Gettering in nuclear fuel elements
Assignee: SAES Getters SpA
•
Filing: 1976-10-12
•
Granted: 1978-11-07
•
Expires: 1996-10-12
Abstract
Abstract A method of manufacturing a nuclear reactor fuel element which contains a pre-activated non-evaporable getter material such that the getter material starts to sorb gases at a temperature lower than the temperature at which the fuel element walls start to sorb gas. The invention is further directed to a getter device which can be employed in a nuclear fuel element and the nuclear fuel element per se.
Inventors
- 👤 Paolo della Porta
- 👤 Tiziano A. Giorgi
- 👤 Livio Rosai
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 13:03
CPC Classifications
G; G21; G21C; G21C3/00; G21C3/02; G21C3/04; G21C3/16; G21C3/17; Y; Y02; Y02E; Y02E30/00; Y02E30/30
Claims Analysis
Total Claims: 9
Claim 1
Independent Claim
111 words
A method of manufacturing a nuclear fuel element comprising the steps of (A) pumping the fuel element to sub-atmospheric pressure (B) heating the fuel element to a temperature below that at which the fuel element walls commence to sorb gas (C) filling the fuel element with a washing gas to about atmospheric pressure (D) pumping the fuel element to sub-atmospheric pressure (E) inserting a non-evaporable activated getter material into the nuclear fuel element (F) filling the fuel element with helium to super-atmospheric pressure (G) sealing the fuel element (H) heating the fuel element and getter material to a temperature below that at which the fuel element walls commence to sorb gas.
Claim 2
Independent Claim
111 words
A method of manufacturing a nuclear fuel element comprising the steps of (A) pumping the fuel element to sub-atmospheric pressure (B) heating the fuel element to a temperature below that at which the fuel element walls commence to sorb gas (C) filling the fuel element with a washing gas to about atmospheric pressure (D) pumping the fuel element to sub-atmospheric pressure (E) inserting a non-evaporable activated getter material into the nuclear fuel element (F) filling the fuel element with helium to super-atmospheric pressure (G) sealing the fuel element (H) heating the fuel element and getter material to a temperature below that at which the fuel element walls commence to sorb gas.
Claim 3
Independent Claim
131 words
A method of manufacturing a nuclear fuel element comprising the step of: (A) pumping the fuel element to sub-atmospheric pressure (B) heating the fuel element to a temperature below that at which the fuel element walls commence to sorb gas (C) filling the fuel element with a washing gas to about atmospheric pressure (D) pumping the fuel element to sub-atmospheric pressure (E) inserting a non-evaporable activated getter material enclosed in a housing having a pressure sensitive rupturing means into the nuclear fuel element (F) filling the fuel element with a rare gas to super-atmospheric pressure whereby the rupturing means is ruptured and (G) sealing the fuel element and (H) heating the fuel element and getter material to a temperature below that at which the fuel element walls commence to sorb gas.
Claim 4
Independent Claim
131 words
A method of manufacturing a nuclear fuel element comprising the step of: (A) pumping the fuel element to sub-atmospheric pressure (B) heating the fuel element to a temperature below that at which the fuel element walls commence to sorb gas (C) filling the fuel element with a washing gas to about atmospheric pressure (D) pumping the fuel element to sub-atmospheric pressure (E) inserting a non-evaporable activated getter material enclosed in a housing having a pressure sensitive rupturing means into the nuclear fuel element (F) filling the fuel element with a rare gas to super-atmospheric pressure whereby the rupturing means is ruptured and (G) sealing the fuel element and (H) heating the fuel element and getter material to a temperature below that at which the fuel element walls commence to sorb gas.
Claim 5
Dependent Claim
17 words
A method of claim 1 in which steps A to D are performed two or more times.
Claim 6
Dependent Claim
18 words
A method of claim 1 in which the temperature of step B is between 150° and 250° C.
Claim 7
Dependent Claim
12 words
A method of claim 1 in which the washing gas is nitrogen.
Claim 8
Dependent Claim
18 words
A method of claim 1 in which the temperature is step H is between 120° and 250° C.
Claim 9
Dependent Claim
13 words
A nuclear fuel element produced by any of the methods of claim 1.
References Cited (Backward Citations)
US3141830A
Cited
US3762995A
Cited
US3519537A
Cited
US3683148A
Cited
US3774010A
Cited
US3836431A
Cited
US3949460A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1981-11-06 | 1982-05-08 | 1982-11-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1985-11-06 | 1986-05-08 | 1986-11-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1989-11-06 | 1990-05-08 | 1990-11-07 | $7700.00 | Window Closed / Lapsed |