Patent US4124075A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4124075A Expired / Lapsed US ⏱️ 0.0 years remaining

Use of oil-wetting spacers in cementing against evaporites

Assignee: Mobil Oil AS
•
Filing: 1977-12-19
•
Granted: 1978-11-07
•
Expires: 1997-12-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract This specification discloses a method of cementing pipe in a well and discloses the use of a designed oil-wetting liquid and cement slurry for cementing pipe against evaporite sections penetrated by the well. The cement slurry is formulated from hydraulic cement, silica flour, ionization control agent, sodium chloride, weighting agent, dispersing and retarding agent, and water, and has a density within the range of about 15.8 to 21.0 pounds per gallon.

Inventors

  • 👤 Joseph U. Messenger

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 15:33
CPC Classifications
C; C04; C04B; C04B28/00; C04B28/02; C04B14/00; C04B14/02; C04B14/30; C04B14/308; C09; C09K; C09K8/00; C09K8/42; C09K8/424

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 160 words
In the drilling of a well with a water base drilling mud, a method of cementing pipe against an evaporite section penetrated by said well, comprising the steps of: (a) flowing an oil-wetting liquid through the annular space formed intermediate said pipe and the wall of said well to oil-wet said evaporite section; (b) forming a pumpable cement slurry comprised of hydraulic cement, sodium chloride in an amount of at least about 18 weight percent based on mixing water, an ionization control agent in an amount up to 1.5 weight percent based on cement, mixing water and weighting agent in an amount to provide a density of said cement slurry within the range of about 15.8 to 21 pounds per gallon; (c) positioning said slurry in the annular space formed intermediate said pipe and said evaporite section; and (d) maintaining said slurry in said annular space to allow said slurry to set and bond said pipe to said evaporite section.
Claim 2
Dependent Claim 160 words
In the drilling of a well with a water base drilling mud, a method of cementing pipe against an evaporite section penetrated by said well, comprising the steps of: (a) flowing an oil-wetting liquid through the annular space formed intermediate said pipe and the wall of said well to oil-wet said evaporite section; (b) forming a pumpable cement slurry comprised of hydraulic cement, sodium chloride in an amount of at least about 18 weight percent based on mixing water, an ionization control agent in an amount up to 1.5 weight percent based on cement, mixing water and weighting agent in an amount to provide a density of said cement slurry within the range of about 15.8 to 21 pounds per gallon; (c) positioning said slurry in the annular space formed intermediate said pipe and said evaporite section; and (d) maintaining said slurry in said annular space to allow said slurry to set and bond said pipe to said evaporite section.
Claim 3
Dependent Claim 29 words
The method of claim 1 wherein said cement slurry further includes d-glucono delta lactone in an amount within the range of 0.01 to 0.5 weight percent based on cement.
Claim 4
Dependent Claim 14 words
The method of claim 2 wherein said ionization control agent is a cellulose ether.
Claim 5
Dependent Claim 57 words
The method of claim 3 wherein said oil-wetting liquid is comprised of a slug of saturated salt water containing an emulsified oil-wetting agent, and a second slug of an oil base liquid material having oil as the external phase, said second slug being weighted halfway between the weight of said drilling mud and the following cement slurry.
Claim 6
Dependent Claim 11 words
The method of claim 4 wherein said weighting agent is hematite.
Claim 7
Dependent Claim 31 words
The method of claim 5 wherein said sodium chloride is present in said oil-wetting liquid in an amount to provide saturation at well conditions in the vicinity of said evaporite section.
Claim 8
Dependent Claim 30 words
The method of claim 6 wherein said sodium chloride is present in said cement slurry in an amount of about 18 weight percent based on mixing water at surface conditions.
Claim 9
Dependent Claim 179 words
In a method of cementing pipe in a well against an evaporite section penetrated by said well, the improvement comprising: (a) flowing a slug of an oil-wetting liquid through the annular space formed intermediate said pipe and the wall of said well to oil-wet said evaporite section; (b) forming a pumpable cement slurry comprised of hydraulic cement, material selected from the group consisting of silica flour, pozzolan and mixtures thereof in an amount within the range of 30 to 50 percent based on cement, sodium chloride in an amount of at least 18 weight percent based on mixing water, a dispersing and retarding agent in an amount within the range of 0.01 to 0.5 percent based on cement, hematite in an amount to provide a slurry density within the range of 15.8 to 21 pounds per gallon, and water; (c) positioning said pumpable slurry in the annular space formed intermediate said pipe and said evaporite section; and (d) maintaining said slurry in said annular space to allow said slurry to set and bond said pipe to said evaporite section.
Claim 10
Dependent Claim 179 words
In a method of cementing pipe in a well against an evaporite section penetrated by said well, the improvement comprising: (a) flowing a slug of an oil-wetting liquid through the annular space formed intermediate said pipe and the wall of said well to oil-wet said evaporite section; (b) forming a pumpable cement slurry comprised of hydraulic cement, material selected from the group consisting of silica flour, pozzolan and mixtures thereof in an amount within the range of 30 to 50 percent based on cement, sodium chloride in an amount of at least 18 weight percent based on mixing water, a dispersing and retarding agent in an amount within the range of 0.01 to 0.5 percent based on cement, hematite in an amount to provide a slurry density within the range of 15.8 to 21 pounds per gallon, and water; (c) positioning said pumpable slurry in the annular space formed intermediate said pipe and said evaporite section; and (d) maintaining said slurry in said annular space to allow said slurry to set and bond said pipe to said evaporite section.
Claim 11
Dependent Claim 68 words
The method of claim 8 wherein said pumpable aqueous cement slurry is comprised of Class G portland cement, 35 weight percent silica flour, 37.2 weight percent sodium chloride based on water, 31.9 weight percent hematite, and 0.1 percent d-glucono delta lactone, and mixed with 6.5 gallons of fresh water per 94-pound sack of said cement to yield a pumpable slurry having a density of 17.2 pounds per gallon.
Claim 12
Dependent Claim 207 words
In the drilling of a well with a water base drilling mud, a method of cementing pipe against an evaporite section penetrated by said well, comprising the steps of: (a) forming an oil-wetting liquid comprised of a first brine slug containing an emulsified oil-wetting agent and a second oil-phase slug, said first brine slug being formed by dissloving said oil-wetting agent in a light oil and emulsifying with a brine solution having an emulsifying agent therein; (b) flowing said oil-wetting liquid through the annular space formed intermediate said pipe and the wall of said well to oil-wet said evaporite section; (c) forming a pumpable cement slurry comprised of hydraulic cement, sodium chloride in an amount of at least about 18 weight percent based on mixing water, an ionization control agent in an amount up to 1.5 weight percent based on cement, mixing water and weighting agent in an amount to provide a density of said cement slurry within the range of about 15.8 to 21 pounds per gallon; (d) positioning said slurry in the annular space formed intermediate said pipe and said evaporite section; and (e) maintaining said slurry in said annular space to allow said slurry to set and bond said pipe to said evaporite section.
Claim 13
Dependent Claim 207 words
In the drilling of a well with a water base drilling mud, a method of cementing pipe against an evaporite section penetrated by said well, comprising the steps of: (a) forming an oil-wetting liquid comprised of a first brine slug containing an emulsified oil-wetting agent and a second oil-phase slug, said first brine slug being formed by dissloving said oil-wetting agent in a light oil and emulsifying with a brine solution having an emulsifying agent therein; (b) flowing said oil-wetting liquid through the annular space formed intermediate said pipe and the wall of said well to oil-wet said evaporite section; (c) forming a pumpable cement slurry comprised of hydraulic cement, sodium chloride in an amount of at least about 18 weight percent based on mixing water, an ionization control agent in an amount up to 1.5 weight percent based on cement, mixing water and weighting agent in an amount to provide a density of said cement slurry within the range of about 15.8 to 21 pounds per gallon; (d) positioning said slurry in the annular space formed intermediate said pipe and said evaporite section; and (e) maintaining said slurry in said annular space to allow said slurry to set and bond said pipe to said evaporite section.

References Cited (Backward Citations)

US2238930A Cited
US3071481A Cited
US3197317A Cited
US3396105A Cited
US3375869A Cited
US3467193A Cited
US3411580A Cited
US3806571A Cited
US3688845A Cited
US3937282A Cited
US3976494A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-11-06 1982-05-08 1982-11-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-11-06 1986-05-08 1986-11-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-11-06 1990-05-08 1990-11-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag