Patent US4120355A successfully refreshed from Google Patents.
← Back to Patent Explorer
US4120355A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for providing fluid communication for in situ shale retort

Assignee: BP Corp North America Inc
•
Filing: 1977-08-30
•
Granted: 1978-10-17
•
Expires: 1997-08-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Disclosed is a method for providing communication with a subterranean oil shale retort. This method can be used to provide a means of introducing fluids, such as a slurry of spent oil shale in water, into a retort. The method for providing lateral communication with a subterranean oil shale retort containing a rubblized retortable mass of oil shale, said retort being substantially surrounded by a mass of unmined formation comprises drilling at least one hole through the unmined formation adjacent to the retort; and providing communication between at least one of said holes and an adjacent retort; so that said drill hole can be used to communicate fluids to said retort. Fluids can be introduced into a spent retort which will form a supporting structure within said retort.

Inventors

  • 👤 Jay C. Knepper
  • 👤 Eugene L. Grossman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-07 13:42
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243; E21B43/247; E21C; E21C41/00; E21C41/16; E21C41/24

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 122 words
A method for the recovery of shale oil and disposal of spent oil shale comprises: forming a subterranean oil shale retort containing a rubblized retortable mass of oil shale, said retort being substantially surrounded by a mass of unmined formation; retorting the oil shale contained in said subterranean retort so as to recover at least a portion of the shale oil present; drilling at least one hole through the unmined formation adjacent to the retort; providing communication between at least one of said holes and an adjacent retort; and passing an aqueous slurry of spent oil shale through said drill hole into said retort; so that spent oil shale can be effectively disposed of in a manner not detrimental to the environment.
Claim 2
Independent Claim 122 words
A method for the recovery of shale oil and disposal of spent oil shale comprises: forming a subterranean oil shale retort containing a rubblized retortable mass of oil shale, said retort being substantially surrounded by a mass of unmined formation; retorting the oil shale contained in said subterranean retort so as to recover at least a portion of the shale oil present; drilling at least one hole through the unmined formation adjacent to the retort; providing communication between at least one of said holes and an adjacent retort; and passing an aqueous slurry of spent oil shale through said drill hole into said retort; so that spent oil shale can be effectively disposed of in a manner not detrimental to the environment.
Claim 3
Dependent Claim 25 words
The method of claim 1 wherein said communication between at least one of the drill holes and an adjacent retort is provided by directional drilling.
Claim 4
Dependent Claim 48 words
The method of claim 1 wherein said communication between at least one of the drill holes and an adjacent retort is provided by locating the drill hole sufficiently near the retort and blasting that portion of the formation which restricts communication between the drill hole and the retort.
Claim 5
Dependent Claim 28 words
The method of claim 1 wherein the slurry of spent shale is capable of forming a supporting structure within said spent retort so as to prevent surface subsidence.
Claim 6
Dependent Claim 45 words
The method of claim 1 wherein the slurry of spent shale is capable of forming sufficiently supporting structure within the spent retort so as to permit the formation of a new subterranean oil shale retort in the area almost immediately adjacent to the spent retort.

References Cited (Backward Citations)

US1004419A Cited
US2906337A Cited
US3233668A Cited
US3342257A Cited
US3406620A Cited
US3490529A Cited
US3459003A Cited
US3502372A Cited
US3597347A Cited
US3588175A Cited
US3661423A Cited
US3950029A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1981-10-16 1982-04-17 1982-10-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1985-10-16 1986-04-17 1986-10-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1989-10-16 1990-04-17 1990-10-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag